02230_Site_Clearing_2026.pdf

PDF 110 KB Posted

Attached to
Water and Wastewater Engineering Services Basic Ordering Agreement
Solicitation number
101624
Issued by
Prince George's County, Maryland

About this file

This is a Standard Specifications document for Section 02230 Site Clearing issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland for 2026 projects. The document establishes requirements for clearing and grubbing within contract limits of rights of way and other designated areas, including removal of trees, brush, shrubs, timber, vegetation, rubbish, debris, fences, and incidental structures. All tree care work must be performed by a Maryland Licensed Tree Care Expert under supervision of a Maryland Certified Roadside Tree Care Expert. The specifications detail specific requirements for tree removal in three contexts: private property within rights of way, dedicated public space subject to Maryland Department of Natural Resources Forest Service standards, and park property managed by MNCP&PC, NPS, and MPS. For trees greater than 6 inches diameter at breast height, sections must be removed in 8 to 10 foot increments to avoid damage to retained trees. The document mandates protection of trees designated to remain, including root pruning protocols, protective barriers, and restrictions on material storage and equipment operation near tree drip lines.

The specifications establish grubbing requirements varying by fill depth, requiring removal of stumps and roots to a minimum of 1 foot below subgrade for areas receiving less than 3 feet of fill or areas designated for excavation or construction. For areas receiving more than 3 feet of fill, trees and shrubs need only be cut close to ground level without grubbing. The document includes provisions for topsoil stripping and stockpiling in well-drained locations with engineer approval, burning restrictions requiring written county agency permission, and damage repair requirements to be completed within 24 hours by a Maryland-licensed tree expert. Importantly, site clearing costs are not separately measured for payment but are considered incidental to the overall contract, meaning these costs are embedded within the broader project pricing rather than billed as a distinct line item.

View the file

Other files

File Type Posted
Water_and_Wastewater_Engineering_Services_Basic_Ordering_Agreement_(Addendum_#3_Revision).pdf PDF
Water_and_Wastewater_Engineering_Services_Basic_Ordering_Agreement.pdf PDF
Sample_Invoice_Template_4.20.2026.xls XLS spreadsheet
WSSC_Pipeline_Design_Manual_2017_(1).pdf PDF
101624_SAMPLE_BOA_Water_Wastewater_Eng_Serv_4.20.26.pdf PDF
01150_Site_Conditions_2026.pdf PDF
02070_Geosynthetics_2026.pdf PDF
03300_Cast-in-Place_Concrete_2026.pdf PDF
Section_IV_-_Water_Details.pdf PDF
Section_VI_-_Corrosion_Details.pdf PDF
02955_Sewer_Mains_Lateral_Rehabilitation_by_Lining_2026.pdf PDF
02370_Slope-Watercourse_Protection_2026.pdf PDF
02315_Earthwork_for_Pipeline_Construction_2026.pdf PDF
02930_Exterior_Plants_2026.pdf PDF
02441_Microtunneling_2026.pdf PDF
Section_VIII_-_Sediment_Control_Details.pdf PDF
Section_III_-_Sewer_Details.pdf PDF
01630_Substitution_Procedures_2026.pdf PDF
02959_Sewer_Main_and_Lateral_Connection_Sealing_2026.pdf PDF
02446_Horiz_Directional_Drilling_2026.pdf PDF
02512_Cleaning-Lining_Water_Mains_2026.pdf PDF
02530_Sanitary_Sewage_System_2026.pdf PDF
05500_Metal_Fabrications_2026_(1).pdf PDF
02533_Pressure_Sewer_System_2026.pdf PDF
02960_Temporary_Bypass_Pumping_System_2026.pdf PDF
02958_Pipe_Bursting_2026.pdf PDF
02950_Paving_Requirements_2026_(1).pdf PDF
Section_I_-_General_Notes_0.pdf PDF
01110_Summary_of_Work_2026.pdf PDF
Section_II_-_Miscellaneous_Details.pdf PDF
01500_Temp_Facilities_Controls_2026.pdf PDF
02445_Boring-Jacking_2026.pdf PDF
02511_Chlorination_and_Dechlorination_2026.pdf PDF
02957_Sewer_Manhole_Rehabilitation_2026.pdf PDF
02920_Lawns-Grasses_2026.pdf PDF
02510_Water_Distribution_System_Contractor_Furnishes_All_Materials_2026.pdf PDF
Section_IX_-_Procurment_and_Manufacturing_Details_(1)_(1).pdf PDF
01570_Temp_Erosion-Sediment_Control_2026.pdf PDF
02510_Water_Distribution_System_2026.pdf PDF
04200_Masonry_2026.pdf PDF
13110_Cathodic_Protection_2026.pdf PDF
02820_Fences-Gates_2026.pdf PDF
01450_Quality_Control_2026.pdf PDF
13112_Impressed_Current_Cathodic_Protection_for_Water_Sewer_Pipelines_2026.pdf PDF
01330_Submittal_Procedures_2026.pdf PDF
01770_Project_Cleanup_2026.pdf PDF
02956_CCTV_Inspection_of_Sewer_Mains,_Manholes_and_Laterals_2026.pdf PDF
03400_Precast_Concrete_Underground_Structures_2026.pdf PDF
00600_TOC_Specs_2026.pdf PDF
WSSC_Pipeline_Design_Manual_2017.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02230-1 2026

STANDARD SPECIFICATIONS

SECTION 02230

SITE CLEARING

PART 1 GENERAL

1.1 DESCRIPTION

A. Section includes requirements for clearing and grubbing areas within Contract limits of right of way and other areas shown, including work designated in permits and other agreements.

B. All work including trimming, root pruning and removals: Performed by a Maryland

Licensed Tree Care Expert under the supervision of a Maryland Certified Roadside Tree Care Expert.

1.2 DEFINITIONS

A. Clearing: Removal from ground surface and disposal within designated areas, trees, brush, shrubs, down timber, decayed wood, other vegetation, rubbish, and debris as well as removal of fences and incidental structures.

B. Grubbing: Removal and disposal of stumps, buried logs, roots larger than 2 inches, matted roots, and organic materials.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

3.1 DISPOSITION OF TREES IN PRIVATE PROPERTY

A. General.

Remove trees and shrubs within limits of right of way unless otherwise indicated in Contract Documents.

Do not cut or damage trees outside right of way unless indicated or written permission has been obtained from affected property owner.

Furnish 3 copies of permission to Engineer before removal operations commence.

B. Trees and Shrubs to be Removed.

Remove trees and shrubs to avoid damage to trees and shrubs designated to remain.

02230-2 2026

On trees greater than 6 inches diameter at breast height (DBH) remove limbs, crown, and trunk in 8 to 10 foot sections, when necessary, to avoid damage to trees and shrubs designated to remain.

Remove trees and shrubs felled within right of way to authorized disposal site following Section 01770.

Fill depressions created by removal with soils material suitable for backfill.

C. Trees and Shrubs to be Saved.

Protect trees and shrubs within right of way, construction strip, or work areas from defacement, injury, and destruction when delineated on Drawings or field marked to be saved.

See Standard Details for protection and limitations.

Root Pruning.

When excavating near trees, prune roots 1 inch and larger. Utilize root pruning equipment specifically designed for this purpose.

When approved by Engineer, large circular saws used to cut concrete and rock saws may be used.

1) Saw cut through roots to depth of required excavation.

2) When excavating very close to trees, dig soil away with shovel, then cut exposed root with saw.

Proceed with work within limits of tree drip line with extreme care, using either hand tools or equipment that will not damage trees.

Do not store materials or park equipment under drip line of trees to be saved.

Saw cut roots 1 inch and larger flush with trench wall on tree side of trench.

Backfill around tree roots immediately after completion of construction in vicinity of trees.

Protect vegetation from damage by motorized equipment emissions.

During working operations, protect trunk, foliage, and root system of trees to be saved with boards or other guards following Standard Details and to prevent damage, injury, and defacement.

Do not pile excavated material adjacent to base of trees.

Do not allow runoff to accumulate around base of trees.

Do not fasten or attach ropes, cables, or guy wires to trees without Engineer’s permission.

1) When permission is granted, protect tree before fastening or attaching, using burlap wrapping and softwood cleats.

Do not use axes or climbing spurs for trimming or trees to be saved.

Use climbing ropes during trimming and be responsible for damage resulting from these actions.

Remove shrubs to be saved, taking sufficient earth ball with roots to maintain shrub.

Temporarily replant if required and replace at completion of construction in condition equaling what existed before removal.

Replace in kind if transplant fails following Section 02930 for transplanting, planting, watering, and guarantee.

02230-3 2026

Perform tree and shrub repair where required, using tree expert licensed by State of Maryland, within 24 hours after damage occurred.

3.2 DISPOSITION OF TREES AND SHRUBS IN DEDICATED PUBLIC SPACE

A. See Maryland Department of Natural Resources Forest Service's Roadside Tree Care standards and requirements for disturbance or removal of trees and shrubs in public space in Prince George's or Montgomery Counties, as set forth in permits for this Contract.

3.3 DISPOSITION OF TREES AND SHRUBS IN PARK PROPERTY (MNCP&PC, NPS,

AND MPS)

A. Remove trees and shrubs within designated work area specified herein.

On trees greater than 6 inches DBH remove limbs, crown, and trunk in 8 to 10 foot sections, when necessary, to avoid damage to trees and shrubs designated to remain.

Save and protect from damage, trees within working area marked or noted on Drawings to be saved.

B. Protect trees and shrubs outside designated work strip on Park property from defacement, injury, and damage.

C. Transplant Dogwoods as directed by Park authorities.

D. Park authorities may designate final location of replacement trees within Park property.

3.4 DISPOSITION OF CUT LOGS ON PRIVATE OR PARK PROPERTY

A. When Contract Documents or special agreements require that felled trees be trimmed and cut into selected lengths and stored on site, stockpile them along edge of right of way or in areas requested by property owner or agent with Engineer’s approval.

B. Unless otherwise required, do not store logs within 100-year floodplain.

3.5 CLEARING AND GRUBBING

A. Clear items specified herein to limits indicated and remove cleared and grubbed material from site.

Do not start earthwork operations in areas where clearing is not complete.

Stumps and root mats may be removed concurrently with excavation.

Follow erosion, sediment control, and stormwater management measures specified elsewhere.

02230-4 2026

B. Clear and grub areas to be excavated, areas receiving less than 3 feet of fill, and areas upon which structures are to be constructed.

Remove stumps and root mats in these areas to minimum 1 foot below subgrade or slope surfaces.

Fill depressions made by removal of stumps or roots with soils material suitable for backfill.

C. Clear areas receiving more than 3 feet of fill and cut trees and shrubs as close as practical to existing ground.

Grubbing will not be required.

D. Do not burn without written permission from County Agency.

Burn perishable material under constant care of competent watchmen.

Burn at times and in manner to avoid jeopardizing material designated to remain on property, surrounding cover, and adjacent property.

Disposal of ashes:

Off-site, or Covered properly, or Combined with soils material before restoration.

Follow applicable laws and ordinances.

3.6 TOPSOIL

A. Strip existing topsoil from areas to be excavated or graded before Work, and place in well-drained stockpiles in locations with Engineer’s approval.

PART 4 MEASUREMENT AND PAYMENT

4.1 SITE CLEARING

A. Site clearing will not be measured for payment, but cost will be considered incidental to Contract.

**WSSC**

1.1 DESCRIPTION
1.2 DEFINITIONS
3.1 DISPOSITION OF TREES IN PRIVATE PROPERTY
3.2 DISPOSITION OF TREES AND SHRUBS IN DEDICATED PUBLIC SPACE
3.3 DISPOSITION OF TREES AND SHRUBS IN PARK PROPERTY (MNCP&PC, NPS, AND MPS)
3.4 DISPOSITION OF CUT LOGS ON PRIVATE OR PARK PROPERTY
3.5 CLEARING AND GRUBBING
3.6 TOPSOIL
4.1 SITE CLEARING
A. Site clearing will not be measured for payment, but cost will be considered incidental to Contract.