01630_Substitution_Procedures_2026.pdf

PDF 105 KB Posted

Attached to
Water and Wastewater Engineering Services Basic Ordering Agreement
Solicitation number
101624
Issued by
Prince George's County, Maryland

About this file

This is a Standard Specifications document for Section 01630 on Substitution Procedures issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland for use in 2026 construction contracts. The document outlines the process for contractors to request substitutions of specified materials, articles, or methods when products are identified as "or equal" in contract specifications. Substitution requests must be submitted no later than 30 days after the Notice to Proceed and require submission of three copies of complete data including manufacturer identification and literature, product performance and test data, reference standards, samples where appropriate, and references to similar projects with installation dates and contact information. For construction methods, contractors must provide detailed descriptions, illustrative drawings, and references to similar projects where the method was employed. All substitution requests must demonstrate how the proposed item compares to the specified product or method and detail any impacts on the construction schedule or other contracts.

The Engineer's decision regarding substitution evaluations is final and binding, and all approved substitutions must be incorporated into the contract through Change Order. Contractor requests for time extensions or additional costs resulting from submission, acceptance, or rejection of substitutions will be evaluated in accordance with Contract Documents. Notably, no substitutions are permitted when materials, articles, or methods are specified without the "or equal" phrase. The cost of any redesigns necessitated by substituted items remains the responsibility of the Contractor. Compliance with substitution procedures is considered incidental to the contract and will not be separately measured or paid.

View the file

Other files

File Type Posted
Water_and_Wastewater_Engineering_Services_Basic_Ordering_Agreement_(Addendum_#3_Revision).pdf PDF
Water_and_Wastewater_Engineering_Services_Basic_Ordering_Agreement.pdf PDF
Sample_Invoice_Template_4.20.2026.xls XLS spreadsheet
WSSC_Pipeline_Design_Manual_2017_(1).pdf PDF
101624_SAMPLE_BOA_Water_Wastewater_Eng_Serv_4.20.26.pdf PDF
01150_Site_Conditions_2026.pdf PDF
02070_Geosynthetics_2026.pdf PDF
03300_Cast-in-Place_Concrete_2026.pdf PDF
Section_IV_-_Water_Details.pdf PDF
Section_VI_-_Corrosion_Details.pdf PDF
02955_Sewer_Mains_Lateral_Rehabilitation_by_Lining_2026.pdf PDF
02370_Slope-Watercourse_Protection_2026.pdf PDF
02315_Earthwork_for_Pipeline_Construction_2026.pdf PDF
02930_Exterior_Plants_2026.pdf PDF
02441_Microtunneling_2026.pdf PDF
Section_VIII_-_Sediment_Control_Details.pdf PDF
Section_III_-_Sewer_Details.pdf PDF
02959_Sewer_Main_and_Lateral_Connection_Sealing_2026.pdf PDF
02230_Site_Clearing_2026.pdf PDF
02446_Horiz_Directional_Drilling_2026.pdf PDF
02512_Cleaning-Lining_Water_Mains_2026.pdf PDF
02530_Sanitary_Sewage_System_2026.pdf PDF
05500_Metal_Fabrications_2026_(1).pdf PDF
02533_Pressure_Sewer_System_2026.pdf PDF
02960_Temporary_Bypass_Pumping_System_2026.pdf PDF
02958_Pipe_Bursting_2026.pdf PDF
02950_Paving_Requirements_2026_(1).pdf PDF
Section_I_-_General_Notes_0.pdf PDF
01110_Summary_of_Work_2026.pdf PDF
Section_II_-_Miscellaneous_Details.pdf PDF
01500_Temp_Facilities_Controls_2026.pdf PDF
02445_Boring-Jacking_2026.pdf PDF
02511_Chlorination_and_Dechlorination_2026.pdf PDF
02957_Sewer_Manhole_Rehabilitation_2026.pdf PDF
02920_Lawns-Grasses_2026.pdf PDF
02510_Water_Distribution_System_Contractor_Furnishes_All_Materials_2026.pdf PDF
Section_IX_-_Procurment_and_Manufacturing_Details_(1)_(1).pdf PDF
01570_Temp_Erosion-Sediment_Control_2026.pdf PDF
02510_Water_Distribution_System_2026.pdf PDF
04200_Masonry_2026.pdf PDF
13110_Cathodic_Protection_2026.pdf PDF
02820_Fences-Gates_2026.pdf PDF
01450_Quality_Control_2026.pdf PDF
13112_Impressed_Current_Cathodic_Protection_for_Water_Sewer_Pipelines_2026.pdf PDF
01330_Submittal_Procedures_2026.pdf PDF
01770_Project_Cleanup_2026.pdf PDF
02956_CCTV_Inspection_of_Sewer_Mains,_Manholes_and_Laterals_2026.pdf PDF
03400_Precast_Concrete_Underground_Structures_2026.pdf PDF
00600_TOC_Specs_2026.pdf PDF
WSSC_Pipeline_Design_Manual_2017.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01630-1 2026

STANDARD SPECIFICATIONS

SECTION 01630

SUBSTITUTION PROCEDURES

PART 1 GENERAL

1.1 DESCRIPTION

A. Section includes Substitution Bid and Submittal Process.

1.2 SUBSTITUTION REQUIREMENTS

A. When material, article, or method is specified using name of proprietary product manufacturer, vendor, or method followed by phrase "or equal," specific item mentioned establishes basis upon which bids are to be prepared.

1. Other manufacturers' materials, articles, and methods not named will be considered as substitutions provided required information is submitted on “FORM FOR SUBSTITUTIONS FOR SPECIFIED ITEMS” and will not require substantial revisions of Contract Documents.

2. This applies to specific construction methods when required by Contract Documents.

B. Whenever material, article, or method is specified or described without phrase "or equal," no substitutions will be allowed.

C. Cost for redesigns due to substituted items are responsibility of Contractor.

D. Contractor certifies the following in making their request for substitution(s).

1. Has personally investigated proposed product or method and determined it is equal in all respects to that specified.

2. Will furnish same guarantee for substitution as for product or method specified.

3. Will coordinate installation of accepted substitution into Work, making design and construction changes to complete Work in all respects following Contract requirements without additional cost to the Commission.

E. Requests for substitutions will not be considered except as stated below:

1. Specified material or method is unavailable, due to cause(s) stated in General Conditions, Article 15.5.1.

a. Submit data to permit complete analysis of the proposed substitution.

1.3 SUBMITTAL OF DATA FOR PROPOSED SUBSTITUTIONS

A. In order for substitutions that do not change design intent to be considered, submit no later than 30 days after date of Notice to Proceed, 3 copies of complete data set forth

01630-2 2026 herein to permit complete analysis of proposed substitutions listed on submitted “FORM

FOR SUBSTITUTIONS FOR SPECIFIED ITEMS”.

1. For Products.

a. Identification including manufacturer's name and address.

b. Manufacturer's literature, including but not necessarily limited to:

1) Product description, performance, and test data.

2) Reference standards.

c. Samples where appropriate.

d. Name and address of similar projects on which product was used and dates of installation with contact name and telephone number.

2. For Construction Methods.

a. Detailed description of proposed method.

b. Drawings illustrating methods.

c. Name and address of similar projects on which method was used and dates of use with contact name and telephone number.

3. Comparison of proposed substitution with product or method specified.

4. Data relating to impact on construction schedule by proposed substitution.

5. Impact on other contracts.

1.4 APPROVAL OF SUBSTITUTION

A. Engineer's decision regarding evaluation of substitutions will be final and binding.

B. Request for time extensions and additional costs based on submission, acceptance, or rejection of substitutions will be evaluated following Contract Documents.

C. All approved substitutions will be incorporated into Contract by Change Order.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

NOT USED

PART 4 MEASUREMENT AND PAYMENT

4.1 Providing for and complying with requirements in this Section will not be measured for payment, but cost will be considered incidental to Contract.

**WSSC**

STANDARD SPECIFICATIONS
SECTION 01630
SUBSTITUTION PROCEDURES
1.1 DESCRIPTION
1.2 SUBSTITUTION REQUIREMENTS
1.3 SUBMITTAL OF DATA FOR PROPOSED SUBSTITUTIONS
1.4 APPROVAL OF SUBSTITUTION
4.1 Providing for and complying with requirements in this Section will not be measured for payment, but cost will be considered incidental to Contract.