01.Section F.pdf
PDF 212 KB Posted
- Solicitation number
- S-K12730-00015199
- Issued by
- Multnomah County, Oregon
About this file
This is a First-Tier Subcontractor Disclosure form for the City of Independence related to the Corvallis Road Waterline Improvements project (PN: 2023-13, Project 223055-007). The form must be submitted at the bid closing location within two working hours after the advertised bid closing time. Bidders are required to disclose all first-tier subcontractors that will furnish labor or labor and materials, along with the category of work and dollar value for each subcontract. The disclosure requirement applies to subcontractors meeting specific thresholds: those with contract values equal to or greater than five percent of the total project bid or $15,000 (whichever is greater), or any subcontractor with a contract value of $350,000 regardless of percentage. Failure to submit this form by the disclosure deadline will result in a non-responsive bid that will not be considered for award.
The disclosure requirement applies only to public improvement contracts estimated to exceed $100,000 in value and does not apply to contracts exempted from competitive bidding requirements. The form provides spaces to list up to nine subcontractors with their respective dollar values and work categories, with additional sheets available if needed. After bids are opened, subcontractor disclosures must be made available for public inspection. Contractors may substitute first-tier subcontractors under ORS 279C.585, and subcontractors may file complaints based on disclosure requirements under ORS 279C.590. The contracting agency is not required to verify the accuracy or completeness of the subcontractor disclosure information submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10.Exhibit 13.pdf | ||
| 2025-12-08 Indy CRWL Bid Documents.pdf | ||
| 11.Exhibit 14.pdf | ||
| 08.Exhibit 5.pdf | ||
| 07.Exhibit 1.pdf | ||
| ADD 04 R1.pdf | ||
| Signed Notice of Intent.pdf | ||
| 2025-12-08 Indy CRWL Project Manual.pdf | ||
| 2026JAN07 CRWL ADD03.pdf | ||
| CORV RD WATERLINE 2025-12-08 BID SET.pdf | ||
| 2026JAN06 CRWL ADD02~1.pdf | ||
| 02.Section G.pdf | ||
| 09.Exhibit 12.pdf | ||
| 2025DEC19 CRWL ADDENDUM 01.pdf | ||
| 06.Section P.pdf | ||
| 03.Section H.pdf | ||
| Independence-3-01 GTES Report 013024.pdf | ||
| 04.Section I.pdf | ||
| 05.Section K.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Corvallis Road Waterline Improvements
PN: 2023-13
Keller Project: 223055-007
CITY OF INDEPENDENCE PAGE 18 OF 26 INVITATION TO BID
First-Tier Subcontractor Disclosure
PROJECT NAME: CORVALLIS ROAD WATERLINE
BID #:
BID CLOSING: Date: Time:
This form must be submitted at the location specified in the Invitation to Bid on the advertised bid closing date and within two working hours after the advertised bid closing time.
List below the name of each subcontractor that will be furnishing labor or will be furnishing labor and materials and that is required to be disclosed, the category of work that the subcontractor will be performing and the dollar value of the subcontract. Enter “NONE” if there are no subcontractors that need to be disclosed. (ATTACH
ADDITIONAL SHEETS IF NEEDED.)
NAME DOLLAR VALUE CATEGORY OF WORK
(1) $
(2) $
(3) $
(4) $
(5) $
(6) $
(7) $
(8) $
(9) $
Failure to submit this form by the disclosure deadline will result in a non-responsive bid. A non-responsive bid will not be considered for award.
Form submitted by (bidder name):
Contact name: Phone no.: ( )
ORS 279C.370 First-tier subcontractor disclosure. (1)(a) Within two working hours after the date and time of the deadline when bids are due to a contracting agency for a public improvement contract, a bidder shall submit to the contracting agency a disclosure of the first-tier subcontractors that:
(A) Will be furnishing labor or will be furnishing labor and materials in connection with the public improvement contract; and
(B) Will have a contract value that is equal to or greater than five percent of the total project bid or $15,000, whichever is greater, or
$350,000 regardless of the percentage of the total project bid.
(b) For each contract to which this subsection applies, the contracting agency shall designate a deadline for submission of bids that has a date on a Tuesday, Wednesday or Thursday and a time between 2 p.m. and 5 p.m., except that this paragraph does not apply to public contracts for maintenance or construction of highways, bridges, or other transportation facilities.
(c) This subsection applies only to public improvement contracts (“projects”) with a value, estimated by the contracting agency, of more than $100,000.
(d) This subsection does not apply to public improvement contracts that have been exempted from competitive bidding requirements under ORS 279C.335 (2).
(2) The disclosure of first-tier subcontractors under subsection (1) of this section must include the name of each subcontractor, the category of work that each subcontractor will perform and the dollar value of each subcontract. The information shall be disclosed in substantially the following [above] form:
(3) A contracting agency shall accept the subcontractor disclosure. The contracting agency shall consider the bid of any contractor that does not submit a subcontractor disclosure to the contracting agency to be a non-responsive bid and may not award the contract to the contractor. A contracting agency is not required to determine the accuracy or the completeness of the subcontractor disclosure.
(4) After the bids are opened, the subcontractor disclosures must be made available for public inspection.
(5) A contractor may substitute a first-tier subcontractor under the provisions of ORS 279C.585.
(6) A subcontractor may file a complaint under ORS 279C.590 based on the disclosure requirements of subsection (1) of this section.