This document is a technical specification section (Section 01 74 00) for Cleaning and Waste Management related to the Vaults 60, 87 & ET Structural Repair and Grating Replacement project by KUB (Knoxville Utilities Board). The specification outlines comprehensive requirements for maintaining a clean and orderly construction site during project activities. Contractors are mandated to remove waste materials and debris daily, with a mandatory weekly cleaning schedule that includes sweeping floors, entry drives, roadways, and walkways, and restoring all affected areas to their original condition.

The specification establishes strict cleaning protocols with potential financial consequences for non-compliance. If the contractor fails to meet the cleaning requirements, the Owner may withhold payments equivalent to Liquidated Damages, exercise the right to correct defective work, or refuse to make monthly progress payments. The contractor must provide approved waste containers, dispose of materials offsite weekly, and ensure all work areas are left in a condition satisfactory to the Owner. Weekly inspections will be conducted, with the contractor required to notify the Owner every Thursday about work areas that have been active during the week.

View the file

Other files for this state and local contract opportunity

Other files attached to Vaults 60, 87 & ET Structural Repair and Grating Replacement, newest first.
File Type Posted
00 01 01 Title Page.pdf PDF
00 52 13 Agreement - Construction Contract.pdf PDF
01 14 33 Work In Rights-of-Way.pdf PDF
00 01 10 Table of Contents.pdf PDF
00 41 11 Bid Cover Sheet.pdf PDF
00 45 40 Verification of Business Status Minority and Women-Owned Business Certification.pdf PDF
01 14 13 Access to Site.pdf PDF
01 31 13 Project Coordination.pdf PDF
01 41 00 Regulatory Requirements.pdf PDF
00 41 13 Bid Form.pdf PDF
00 43 13 Bid Security Form.pdf PDF
00 45 48 Drug-Free Affidavit.pdf PDF
00 61 13.16 Payment Bond.pdf PDF
00 73 16 Insurance Requirements.pdf PDF
01 35 23 Owner Safety Requirements.pdf PDF
01 45 00 Quality Control.pdf PDF
01 54 23 Temporary Scaffolding and Platforms.pdf PDF
01 55 26 Traffic Control.pdf PDF
01 77 00 Closeout Procedures.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
Drawings - Vaults 60, 87 & ET Structural Repair and Grating Replacement.pdf PDF
00 01 15 List of Drawing Sheets.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 45 13 Bidders Qualifications.pdf PDF
00 45 19 Non-Collusion Affidavit.pdf PDF
00 61 13.13 Performance Bond.pdf PDF
00 72 13 General Conditions - Construction Contract.pdf PDF
00 73 13 Supplementary Conditions - Construction Contract.pdf PDF
01 11 00 Summary of Work.pdf PDF
01 26 00 Contract Modification Procedures.pdf PDF
01 29 00 Payment Procedures.pdf PDF
01 57 13 Temporary Erosion and Sediment Control.pdf PDF
01 60 00 Common Product Requirements.pdf PDF
Appendix A - Structural Design Calculations.pdf PDF
Bid Invitation - 3930.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vaults 60, 87 & ET Structural Repair and Grating Replacement

3930 CLEANING AND WASTE MANAGMENT

REVISED 07/24/24 01 74 00 - 1

SECTION 01 74 00

CLEANING AND WASTE MANAGMENT

PART 1 – GENERAL

1.01 SUMMARY

A. Section Includes: Requirements for maintaining Site in clean and neat condition during construction.

B. Related Requirements:

1. Document 00 72 13, General Conditions – Construction Contract.

2. Document 00 73 13, Supplementary Conditions – Construction Contract.

3. Section 01 77 00, Closeout Procedures.

1.02 GENERAL

A. Contractor shall not unreasonably encumber the Work area with construction equipment or materials.

Work area shall be kept clean during construction activities and promptly restored to original condition after moving to next Work area.

1.03 SCHEDULING

A. Daily: Remove and dispose of waste materials, rubbish, and other debris.

B. Weekly: Each Friday, at the latest, remove and dispose of debris generated by construction activities and construction personnel, restore areas to original condition (such as, lawns, beds, sidewalks, driveways, and streets) with temporary or permanent surfaces as specified in these Specifications.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.01 CLEANING

A. In accordance with General Conditions, as may be specified in other specification sections, and as required herein.

B. Wet down exterior surfaces prior to sweeping to prevent blowing of dust and debris. At least weekly, sweep floors (including, basins, tunnels, platforms, walkways, and roof surfaces), and pick up and dispose of debris.

C. Weekly, brush sweep entry drive, roadways, and other streets and walkways affected by the Work and where adjacent to the Work.

Vaults 60, 87 & ET Structural Repair and Grating Replacement

CLEANING AND WASTE MANAGMENT 3930

01 74 00 - 2 REVISED 07/24/24

D. Provide approved containers for collection and disposal of waste materials, debris, and rubbish. Weekly, dispose of such waste materials, debris, and rubbish offsite.

E. Leave the Work and adjacent areas affected in a cleaned condition satisfactory to Owner.

1. Remove and dispose of debris generated by construction activities and construction personnel.

2. Repair and patch adjacent surfaces to original condition.

3. Clean sidewalks, driveways, and other areas to original or better condition.

4. Rake clean all other surfaces.

5. Leave water courses, gutters, and ditches open and clean.

3.02 INSPECTION

A. Contractor shall notify Owner on a weekly basis, on Thursday, of Work areas that construction crews have worked on during the week.

B. The Owner, with the Contractor, will make an inspection to verify the status of completion.

C. Owner will notify Contractor in writing when surface conditions do not meet the Contract Documents.

3.03 EVALUATION

A. Failure to perform, as determined by the Owner may result in all or one of the following:

1. Withholding payments in an amount equal to Liquidated Damages on a daily basis as designated in the Agreement for each day surface conditions do not meet requirements of the Contract Documents.

2. Owner exercising right to correct defective Work in accordance with the General Conditions.

3. Refusal of Owner to make monthly progress payments as requested by the Contractor.

3.04 FINAL CLEANING

A. In accordance with Section 01 77 00, Closeout Procedures.

END OF SECTION

1 PART 1 – GENERAL
1.01 SUMMARY
A. Section Includes: Requirements for maintaining Site in clean and neat condition during construction.
B. Related Requirements:
1. Document 00 72 13, General Conditions – Construction Contract.
2. Document 00 73 13, Supplementary Conditions – Construction Contract.
3. Section 01 77 00, Closeout Procedures.
1.02 general
A. Contractor shall not unreasonably encumber the Work area with construction equipment or materials. Work area shall be kept clean during construction activities and promptly restored to original condition after moving to next Work area.
1.03 SCHEDULING
A. Daily: Remove and dispose of waste materials, rubbish, and other debris.
B. Weekly: Each Friday, at the latest, remove and dispose of debris generated by construction activities and construction personnel, restore areas to original condition (such as, lawns, beds, sidewalks, driveways, and streets) with temporary or perman...
2 PART 2 - PRODUCTS (Not Used)
3 PART 3 - EXECUTION
3.01 CLEANING
A. In accordance with General Conditions, as may be specified in other specification sections, and as required herein.
B. Wet down exterior surfaces prior to sweeping to prevent blowing of dust and debris. At least weekly, sweep floors (including, basins, tunnels, platforms, walkways, and roof surfaces), and pick up and dispose of debris.
C. Weekly, brush sweep entry drive, roadways, and other streets and walkways affected by the Work and where adjacent to the Work.
D. Provide approved containers for collection and disposal of waste materials, debris, and rubbish. Weekly, dispose of such waste materials, debris, and rubbish offsite.
E. Leave the Work and adjacent areas affected in a cleaned condition satisfactory to Owner.
1. Remove and dispose of debris generated by construction activities and construction personnel.
2. Repair and patch adjacent surfaces to original condition.
3. Clean sidewalks, driveways, and other areas to original or better condition.
4. Rake clean all other surfaces.
5. Leave water courses, gutters, and ditches open and clean.
3.02 INSPECTION
A. Contractor shall notify Owner on a weekly basis, on Thursday, of Work areas that construction crews have worked on during the week.
B. The Owner, with the Contractor, will make an inspection to verify the status of completion.
C. Owner will notify Contractor in writing when surface conditions do not meet the Contract Documents.
3.03 EVALUATION
A. Failure to perform, as determined by the Owner may result in all or one of the following:
1. Withholding payments in an amount equal to Liquidated Damages on a daily basis as designated in the Agreement for each day surface conditions do not meet requirements of the Contract Documents.
2. Owner exercising right to correct defective Work in accordance with the General Conditions.
3. Refusal of Owner to make monthly progress payments as requested by the Contractor.
3.04 final cleaning
A. In accordance with Section 01 77 00, Closeout Procedures.