00 01 10 Table of Contents.pdf

PDF 106 KB Posted

Attached to
Vaults 60, 87 & ET Structural Repair and Grating Replacement State and local contract opportunity
Solicitation number
3930
Issued by
Knox County, Tennessee

About this file

This document is a Table of Contents for a construction contract for Vaults 60, 87 & ET Structural Repair and Grating Replacement, prepared by KUB (Knoxville Utilities Board). The document outlines the comprehensive set of procurement and contracting requirements, general requirements, and specifications for a structural repair and grating replacement project. The contract documents are dated with various revision dates in 2024 and 2025, indicating an upcoming or planned project. The table of contents includes sections covering bidding instructions, contract agreements, bonds, insurance requirements, project coordination, safety requirements, quality control, and closeout procedures.

The contract includes an Appendix A with 20 pages of Structural Design Calculations, suggesting a technical and detailed approach to the project. The document covers critical aspects such as site access, work in rights-of-way, traffic control, temporary erosion and sediment control, and operation and maintenance data. While specific financial details are not provided in this table of contents, the comprehensive nature of the document indicates a structured and thorough approach to project management, with multiple revision dates suggesting ongoing refinement of the contract specifications.

View the file

Other files for this state and local contract opportunity

Other files attached to Vaults 60, 87 & ET Structural Repair and Grating Replacement, newest first.
File Type Posted
00 01 01 Title Page.pdf PDF
00 52 13 Agreement - Construction Contract.pdf PDF
01 14 33 Work In Rights-of-Way.pdf PDF
00 41 11 Bid Cover Sheet.pdf PDF
00 45 40 Verification of Business Status Minority and Women-Owned Business Certification.pdf PDF
01 14 13 Access to Site.pdf PDF
01 31 13 Project Coordination.pdf PDF
01 41 00 Regulatory Requirements.pdf PDF
00 41 13 Bid Form.pdf PDF
00 43 13 Bid Security Form.pdf PDF
00 45 48 Drug-Free Affidavit.pdf PDF
00 61 13.16 Payment Bond.pdf PDF
00 73 16 Insurance Requirements.pdf PDF
01 35 23 Owner Safety Requirements.pdf PDF
01 45 00 Quality Control.pdf PDF
01 54 23 Temporary Scaffolding and Platforms.pdf PDF
01 55 26 Traffic Control.pdf PDF
01 74 00 Cleaning and Waste Management.pdf PDF
01 77 00 Closeout Procedures.pdf PDF
01 78 23 Operation and Maintenance Data.pdf PDF
Drawings - Vaults 60, 87 & ET Structural Repair and Grating Replacement.pdf PDF
00 01 15 List of Drawing Sheets.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 45 13 Bidders Qualifications.pdf PDF
00 45 19 Non-Collusion Affidavit.pdf PDF
00 61 13.13 Performance Bond.pdf PDF
00 72 13 General Conditions - Construction Contract.pdf PDF
00 73 13 Supplementary Conditions - Construction Contract.pdf PDF
01 11 00 Summary of Work.pdf PDF
01 26 00 Contract Modification Procedures.pdf PDF
01 29 00 Payment Procedures.pdf PDF
01 57 13 Temporary Erosion and Sediment Control.pdf PDF
01 60 00 Common Product Requirements.pdf PDF
Appendix A - Structural Design Calculations.pdf PDF
Bid Invitation - 3930.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vaults 60, 87 & ET Structural Repair and Grating Replacement

3930 TABLE OF CONTENTS

REVISED 05/05/25 00 01 10 - 1

DOCUMENT 00 01 10

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS REVISION

00 01 01 TITLE PAGE 05/01/23

00 01 10 TABLE OF CONTENTS 05/05/25

00 01 15 LIST OF DRAWING SHEETS 03/14/25

00 21 13 INSTRUCTIONS TO BIDDERS – CONSTRUCTION CONTRACT 08/15/25

00 41 11 BID COVER SHEET 08/15/25

00 41 13 BID FORM – CONSTRUCTION CONTRACT 03/06/25

00 43 13 BID SECURITY FORM 05/01/23

00 45 13 BIDDERS QUALIFICATIONS 05/01/23

00 45 19 NON-COLLUSION AFFIDAVIT 05/01/23

00 45 40 VERIFICATION OF BUSINESS STATUS MINORITY AND WOMEN-

OWNED BUSINESS CERTIFICATION 03/06/25

00 45 48 DRUG-FREE WORKPLACE AFFIDAVIT 05/01/23

00 52 13 AGREEMENT – CONSTRUCTION CONTRACT 05/02/25

00 61 13.13 PERFORMANCE BOND – CONSTRUCTION CONTRACT 07/24/24

00 61 13.16 PAYMENT BOND – CONSTRUCTION CONTRACT 07/24/24

00 72 13 GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT 07/24/24

00 73 13 SUPPLEMENTARY CONDITIONS OF THE CONSTRUCTION CONTRACT 05/01/25

00 73 16 INSURANCE REQUIREMENTS 05/01/23

SPECIFICATIONS GROUP

DIVISION 01 GENERAL REQUIREMENTS REVISION

01 11 00 SUMMARY OF WORK 05/01/23

01 14 13 ACCESS TO SITE 08/01/24

01 14 33 WORK IN RIGHTS-OF-WAY 07/24/24

01 26 00 CONTRACT MODIFICATION PROCEDURES 05/05/25

01 29 00 PAYMENT PROCEDURES 07/24/24

01 31 13 PROJECT COORDINATION 07/24/24

01 35 23 OWNER SAFETY REQUIREMENTS 10/16/24

01 41 00 REGULATORY REQUIREMENTS 12/02/24

Vaults 60, 87 & ET Structural Repair and Grating Replacement

TABLE OF CONTENTS 3930

00 01 10 - 2 REVISED 05/05/25

DIVISION 01 GENERAL REQUIREMENTS REVISION

01 45 00 QUALITY CONTROL 07/24/24

01 54 23 TEMPORARY SCAFFOLDING PLATFORMS 08/21/25

01 55 26 TRAFFIC CONTROL 07/24/24

01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL 07/24/24

01 60 00 COMMON PRODUCT REQUIREMENTS 07/24/24

01 74 00 CLEANING AND WASTE MANAGEMENT 07/24/24

01 77 00 CLOSEOUT PROCEDURES 07/24/24

01 78 23 OPERATION AND MAINTENANCE DATA 07/24/24

APPENDIX A STRUCTURAL DESIGN CALCULATIONS 20 PAGES

END OF DOCUMENT

Specifications Group

File details come from the government source that posted it. Updated .