00015934 Exhibit 8 Description of Base Bid and Add Alternate.docx

DOCX document 15 KB Posted

Attached to
Enterprise Cold Storage Roof Repairs
Solicitation number
S-73000-00015934
Issued by
Union County, Oregon

About this file

This is an Exhibit document for an Oregon Department of Transportation (ODOT) construction project outlining the bidding structure for a roofing project. The base bid requires contractors to provide all labor, materials, equipment, and supervision to remove existing metal roofing, flashing, and trim for reinstallation after disposal of old insulation and installation of new roof sheathing and vapor barrier. Add Alternate 1, if selected for inclusion, requires contractors to perform all base bid work while also removing and disposing of existing metal roofing, flashing, and trim, and providing new metal panel roofing and trim according to project specifications. The contract award will be based on the lowest responsive bid combining totals from the base bid and add alternate 1.

ODOT has limited funding available for this project and may not have adequate resources to construct the entire scope. If funding permits, Add Alternate 1 will be selected for inclusion in the project award. Both the base bid and add alternate must comply with all contract specifications, plans, and statement of work requirements. This bidding structure allows ODOT to maximize the work completed within available funding constraints while maintaining flexibility in project scope.

View the file

Other files

File Type Posted
00015934 Pre Bid Sign In Sheet.docx DOCX document
00015934 Invitation To Bid PI.docx DOCX document
00015934 Addendum2.docx DOCX document
00015934 Exhibit 6 Plans.pdf PDF
00015934 Exhibit 6 Plans Revised.pdf PDF
00015934 Exhibit 5 Statement of Work.doc DOC document
00015934 Addendum1.docx DOCX document
00015934 Preliminary Results.xlsx XLSX spreadsheet
00015934 Exhibit 8 Description of Base Bid and And Alternate Revised.docx DOCX document
00015934 Prebid Meeting Agenda.doc DOC document
00015934 Exhibit 7 Photos.docx DOCX document
00015934 Sample Contract.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 8

DESCRIPTION OF BASE BID AND ADD ALTERNATE

ODOT has limited funding available for construction of this project and the funding may not be adequate to construct the entire project. One (1) additive alternate IS being used to maximize the work that can be completed within the available funding limits. If funding allows additive alternate 1 will be selected for inclusion in award.

The contract award will be based on the lowest responsive bid combining totals from the base bid, AND add alternate 1.

BASE BID: - Re Use Existing Materials:

Provide all labor, materials, equipment and supervision to remove the existing metal roofing, flashing, and trim to be re-installed after the old insulation is disposed of and new roof sheathing and vapor barrier is installed.

ADD ALTERNATE IF SELECTED FOR INCLUSION IN THE PROJECT WILL COMPLY WITH CONTRACT SPECIFICATIONS, PLANS AND STATEMENT OF WORK.

ADD ALTERNATE 1 – Provide New Materials:

Will include base bid work and removing and disposing of existing metal roofing, flashing, and trim. Contractor shall provide new metal panel roofing and trim per specifications below.