This is a preliminary bid tabulation for an Invitation to Bid (ITB) issued by Wasco County on behalf of the Oregon Department of Transportation (ODOT) for roofing replacement services at the Enterprise Maintenance Station located at 715 Golf Course Road, Enterprise, Oregon. The project scope involves the complete replacement of the original 1992 building roof with Insulated Metal Panels (IMPs), including removal and disposal of existing rain gutters, downspouts, gable trim, eave trim, ridge cap, roof metal, and roof insulation, while the 2013 wash bay addition roof remains unchanged. The contractor must install All Weather Insulated Panels Standing Seam SR2 with 5-inch panel thickness, 40-inch panel width, R41 minimum insulation value, and white Silicone Modified Polyester Two-Coat System paint finish, along with commercial-grade gutters. A mandatory pre-bid conference was held on April 6, 2026, at 11:00 AM PST at the project site. Bids were due on April 15, 2026, at 10:00 AM through the OregonBuys electronic procurement system, with substantial completion required by August 31, 2026, and final completion by September 30, 2026. Liquidated damages of $600 per calendar day apply for delays beyond the substantial completion date.
Three contractors submitted bids for the single lump sum line item: C & C Construction Services Inc at $189,500.00, Eagle Cap Construction LLC at $205,000.00, and G. Gordon Construction Company LLC at $228,534.00. The estimated project cost range for bonding purposes is $100,000 to $250,000, with bid security required at 10% of the total bid amount. Contractors must provide proof of insurance with combined single limits of $2,000,000 per occurrence and $4,000,000 annual aggregate for commercial general liability and $1,000,000 combined single limits for commercial automobile liability, along with performance and payment bonds each equal to 100% of the contract amount. All bidders must hold an Oregon State Construction Contractors Board license prior to bidding and comply with Oregon Bureau of Labor and Industries prevailing wage rates for BOLI Region 13 (Wallowa County). The project is funded with State funds, with award contingent upon receipt of sufficient funding. No set-aside designations, disadvantaged enterprise restrictions, or incumbent vendors are identified in the procurement documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00015915 Intent To Award.xlsx | XLSX spreadsheet | |
| 00015915 Exhibit 6 Plans Revised.pdf | ||
| 00015915 Exhibit 9 2013 As Builts.pdf | ||
| 00015915 Exhibit 6 Plans.pdf | ||
| 00015915 Prebid Meeting Agenda.doc | DOC document | |
| 00015915 Prebid Sign In Sheet.docx | DOCX document | |
| 00015915 Kingspan KingSeam Product Data.pdf | ||
| 00015915 PI Invitation To Bid.docx | DOCX document | |
| 00015915 Sample Contract.docx | DOCX document | |
| 00015915 Exhibit 5 Statement of Work.doc | DOC document | |
| 00015915 Exhibit 8 1992 As Builts.pdf | ||
| 00015915 Exhibit 7 Photos.docx | DOCX document | |
| 00015915 Addendum1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 4/15/26 | ||||
| ITB No. | S-73000-00015915 | BIDDER | |||
| NAME: | C & C Construction Services Inc | Eagle Cap Construction LLC | G. Gordon Construction Company LLC | ||
| Bid Closing: | 04/15/2026 @ 10:00 AM | ||||
| Description: | Enterprise Maintenance Station Roof Replacement | ||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Roof replacement of the Enterprise Maintenance Station; does not include roof above wash bay. See attachments for specifications. | 1 | Lump Sum | $ 189,500.00 | $ 189,500.00 | $ 205,000.00 | $ 205,000.00 | $ 228,534.00 | $ 228,534.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| TOTAL | $ 189,500.00 | $ 205,000.00 | $ 228,534.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |