00012859 Attachment E PEMB Parts Inventory List.pdf

PDF 391 KB Posted

Attached to
ITB - ODOT Hunter Creek Maintenance Station Sander Storage Building
Solicitation number
S-73000-00012859
Issued by
Crook County, Gladstone City, Oregon

About this file

This document is a Pre-engineered Metal Building (PEMB) parts inventory list from Pacific Building System in Woodburn, OR for ODOT project #21-8659. The inventory details all components that ODOT will provide for the project, including structural members like columns, rafters, beams, girts, purlins, bracing, and various connection hardware. The parts list is organized into several sections including fabrication components (main structural members), small parts (clips and braces), secondary members (purlins and girts), angles, and warehouse items (fasteners and connectors).

The document includes specific modifications and notes regarding certain components that need to be replaced or modified. For example, zinc plated 1/2" bolts and nuts must be replaced with hot dip galvanized versions, and finhead zinc bolts can only be used for erection where specifically shown. All structural members are specified as hot dip galvanized, with weights ranging from a few pounds for small connection pieces to over 1,900 pounds for some of the main columns. The total weight of the documented components across all sections is approximately 18,000 pounds (sum of the individual section weights: 7,536 + 1,657 + 5,856 + 528 + 566 = 18,143 pounds).

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fabrication r:J• l Job Number: 21-8659 -·paafic Building System

Date: 12-14-2021 2100 N Pacific Highway

Woodburn, OR 97071 Detailer: AK tel: {503) 981-9581 fax: {503)981-9584 WT: 7536 Checker: UK

Qty Mark Sh# Inventory Description Part Length Ga Color Wt

1 RFl-1 S0l 1000101000 RF Column BuiltUp 17'-11" Hot Dip Galvanized 476

2 RFl-2 S03 1000101000 RF Rafter BuiltUp 11'-6 5/8" Hot Dip Galvanized 517

1 RFl-3 S0l 1000101000 RF Column BuiltUp 17'-11" Hot Dip Galvanized 476

4 RF2-1 sos 1000101000 RF Column BuiltUp 17'-11" Hot Dip Galvanized 1912

4 RF2-2 S07 1000101000 RF Rafter BuiltUp 11'-6 5/8" Hot Dip Galvanized 1034

1 RF3-1 S09 1000101000 RF Column BuiltUp 17'-11" Hot Dip Galvanized 476

2 RF3-2 S03 1000101000 RF Rafter BuiltUp 11'-6 5/8" Hot Dip Galvanized 517

1 RF3-3 S09 1000101000 RF Column BuiltUp 17'-11" Hot Dip Galvanized 476

4 EB-1 SlO 1000101000 Ext Beam BuiltUp 6'-5 3/4" Hot Dip Galvanized 351

4 EB-2 S12 1000101000 Ext Beam BuiltUp 6'-5 1/2" Hot Dip Galvanized 366

2 G-1 S14 1000201000 EW Girt C8x18.75 24'-11" Hot Dip Galvanized 934

PEMB PARTS INVENTORY LIST

This file contains an inventory of components supplied with the Pre-engineered Metal Building Package that ODOT will provide for the project. Modifications to the inventory are noted in red.

Contractor shall provide additional and modified components as noted.

ATTACHMENT E - PEMB PARTS INVENTORY LIST

�b - -- Small Parts Job Number: 21-8659 Pac1t1c Building System

Date: 12/14/2021 2100 N Pacific Highway

Woodburn, OR 97071 Detailer: AG (rtel: (503) 981-9581 fax: (503)981-9584 WT: 1657 Checker:

Qty Mark Sh# Inventory Description Part Length Ga Color Wt

1 FB23A 1000301000 Flange Brace L2X2Xl/8 1'-11" Hot Dip Galvanized 7

16 FB30A 1000301000 Flange Brace L2X2Xl/8 2'-6" Hot Dip Galvanized 148

7 FB31A 1000301000 Flange Brace L2X2Xl/8 2'-7" Hot Dip Galvanized 67

12 TR-12 1000503000 Wall Sag Brace 1/2 All Th 1'-0" Hot Dip Galvanized 14

4 TR-18 1000503000 Wall Sag Brace 1/2 All Th 1'-6" Hot Dip Galvanized 7

20 Sl-1 1000401000 Roof Sag Angle(SI-) LlXlXl/8 2'-11 11/16" Hot Dip Galvanized 98

40 Sl-2 1000401000 Roof Sag Angle(SI-) LlXlXl/8 3'-11 11/16" Hot Dip Galvanized 262

5 SP-1 1000402000 Roof Sag Angle Peak(SP-) LlXlXl/8 1'-7" Hot Dip Galvanized 13

5 SP-2 1000402000 Roof Sag Angle Peak(SP-) LlXlXl/8 1'-10" Hot Dip Galvanized 15

4 SE4-1 1000403000 Roof Sag Angle Eave(SE-) LlXlXl/8 1'-7 1/16" Hot Dip Galvanized 10

4 SE4-2 1000403000 Roof Sag Angle Eave(SE-) LlXlXl/8 1'-8 7/16" Hot Dip Galvanized 11

10 SE4-3 1000403000 Roof Sag Angle Eave(SE-) LlXlXl/8 2'-8 7/16" Hot Dip Galvanized 45

10 SE4-4 1000403000 Roof Sag Angle Eave(SE-) LlXlXl/8 2'-9 1/8" Hot Dip Galvanized 46

10 SE4-5 1000403000 Roof Sag Angle Eave(SE-) LlXlXl/8 2'-7 1/8" Hot Dip Galvanized 43

10 SE4-6 1000403000 Roof Sag Angle Eave(SE-) LlXlXl/8 2'-10 7/16" Hot Dip Galvanized 47

16 JB-1 1000501000 Wall Sag Angle(JB-) LlXlXl/8 3'-11 11/16" Hot Dip Galvanized 105

2 JB-2 1000501000 Wall Sag Angle(JB-) LlXlXl/8 3'-11 3/16" Hot Dip Galvanized 13

6 JE-1 1000502000 Wall Sag Angle Eave(JE-) LlXlXl/8 1'-8 9/16" Hot Dip Galvanized 17

9 SM-1 1000302000 Support Angle L3X3X316 20'-0" 12 Hot Dip Galvanizedl 688

1:1 Bracing Job Number: 21-8659 Pac1tic Building System

Date: 12-14-2021 2100 N Pacific Highway

Woodburn, OR 97071 Detailer: AK tel: {503) 981-9581 fax: {503)981-9584 WT: 601 Checker: UK

Qty Mark Sh# Inventory Description Part Length Ga Color Wt

4 CB-2 1000706300 Rod Bracing 5/8 5/8 ROD 23'-8 1/2" Hot Dip Galvanized 99

8 6040600062 5/8 Hillside Washer 063HSW Galvanized 16

8 Note 1 6040900062 5/8 USS Flat Cut Washer 063BWB Black 1

16 Note 2 6041000062 5/8 Heavy Hex Nut 063BNB Black 1

4 Note 6 6040500062 5/8 Coupling Nut Zinc 063CNut Plated 9

4 CB-1 1000712500 Rod Bracing 1-1/4 1 1/4ROD 26'-9 1/2" Hot Dip Galvanized 448

8 Note 3 6040900120 1-1/4 USS Flat Cut Washer 125BWB Black 3

16 Note 4 6041000120 1-1/4 Heavy Hex Nut 125BNB Black 1

�3 Notes 5c K6 6040500125 1-1/4 Coupling Nut Zinc 125CNut Plated 0

8 6040600110 1 1/8-1 1/4 Hillside Washer 125HSW Galvanized 24

Modifications to Building Inventory Notes:

Note 1 : Existing 5/8 USS Flat Cut Washers are unsuitable. Supply eight (8) new 5/8 Flat Cut Washers, hot dip galvanized.

Note 2: Existing 5/8 Heavy Hex Nuts are unsuitable. Supply sixteen (16) new 5/8 Heavy Hex Nuts with hot dip galvanize coating or two coats of field applied "Cold Galvanizing" paint.

Note 3: Existing 1-1 /4 USS Flat Cut Washers are unsuitable. Supply eight (8) new 1-1 /4 Flat Cut Washers, hot dip galvanized.

Note 4: Existing 1-1/4 Heavy Hex Nuts are unsuitable. Supply sixteen (16) new 1-1/4 Heavy Hex Nuts with hot dip galvanize coating or two coats of field applied "Cold Galvanizing" paint.

Note 5: One (1) 1-1/4 Coupling Nut is missing from package. Contractor shall furnish missing coupling nut.

Note 6: Remove rust from coupling nuts and apply two coats of field applied "Cold Galvanizing" paint.

��tic Building System Secondary Job Number: 21-8659

2100 N Pacific Highway Date: 1-7-2022

Woodburn, OR 97071 Detailer: AG tel: {503) 981-9581 fax: {503)981-9584 WT: 5856 Checker: UK

Qty Mark Sh# Inventory Description Part Length Ga Color Wt 6 P-2 2010816000 Roof Purlin 8216 22'-10" 16 Galvanized PM 395 2 P-4 2010816000 Roof Purlin 8216 27'-7 1/2" 16 Galvanized PM 159 2 P-5 2010816000 Roof Purlin 8216 22'-2" 16 Galvanized PM 128 2 P-6 2010816000 Roof Purlin 8216 27'-7 1/2" 16 Galvanized PM 159 3 G-2 2010816000 Wall Girt 8216 24'-11" 16 Galvanized PM 215 2 G-4 2010816000 Wall Girt 8216 13'-0 15/16" 16 Galvanized PM 75 1 G-9 2010816000 Wall Girt 8216 8'-7 1/2" 16 Galvanized PM 25 1 G-11 2010816000 Wall Girt 8216 22'-0 1/2" 16 Galvanized PM 63 1 G-13 2010816000 Wall Girt 8216 3'-4" 16 Galvanized PM 10 2 G-14 2010816000 Wall Girt 8216 22'-2" 16 Galvanized PM 128 1 G-17 2010816000 Wall Girt 8216 8'-9" 16 Galvanized PM 25 4 G-19 2010816000 Wall Girt 8216 22'-0 1/2" 16 Galvanized PM 254 3 G-21 2010816000 Wall Girt 8216 22'-0 1/2" 16 Galvanized PM 190 2 G-23 2010816000 Wall Girt 8216 9'-8 1/2" 16 Galvanized PM 56 1 G-24 2010816000 Wall Girt 8216 22'-2" 16 Galvanized PM 64 2 G-25 2010816000 Wall Girt 8216 23'-9" 16 Galvanized PM 137

8 P-1 2010814000 Roof Purlin 8214 27'-11 1/2" 14 Galvanized PM 805 8 P-3 2010814000 Roof Purlin 8214 27'-11 1/2" 14 Galvanized PM 805 2 P-7 2010814000 Roof Purlin 8214 22'-10" 14 Galvanized PM 164 2 P-8 2010814000 Roof Purlin 8214 20'-6" 14 Galvanized PM 148 2 P-9 2010814000 Roof Purlin 8214 20'-6 1/2" 14 Galvanized PM 148 2 G-6 2010814000 Wall Girt 8214 24'-11" 14 Galvanized PM 179

1 G-10 2010812000 Wall Girt 8212 22'-0 1/2" 12 Galvanized PM 111

1 G-5 2020816000 Wall Girt 8C16 24'-11" 16 Galvanized PM 72 1 G-8 2020816000 Wall Girt 8C16 8'-7 1/2" 16 Galvanized PM 25 1 G-12 2020816000 Wall Girt 8C16 3'-4" 16 Galvanized PM 10 1 G-16 2020816000 Wall Girt 8C16 7'-7" 16 Galvanized PM 22 1 G-20 2020816000 Wall Girt 8C16 20'-10 1/2" 16 Galvanized PM 60 1 G-22 2020816000 Wall Girt 8C16 19'-10" 16 Galvanized PM 57 4 DJ-1 2020816000 Door Jamb 8C16 11'-9" 16 Galvanized PM 135 6 DJ-2 2020816000 Door Jamb 8C16 11'-8" 16 Galvanized PM 202 4 DJ-3 2020816000 Door Jamb 8C16 11'-8" 16 Galvanized PM 134 2 DJ-4 2020816000 Door Jamb 8C16 7'-8" 16 Galvanized PM 44 4 DJ-5 2020816000 Door Jamb 8C16 3'-4" 16 Galvanized PM 38

1 DH-1 2020816000 Door Header 8C16 9'-4" 16 Galvanized PM 27 7 DH-2 2020816000 Door Header 8C16 3'-4 1/2" 16 Galvanized PM 68 2 DH-3 2020816000 Door Header 8C16 10'-0" 16 Galvanized PM 58 1 DH-4 2020816000 Door Header 8C16 7'-11" 16 Galvanized PM 23 2 BC-1 2020816000 Base Channel 8C16 24'-11" 16 Galvanized PM 144 1 BC-2 2020816000 Base Channel 8C16 8'-7 1/2" 16 Galvanized PM 25 1 BC-3 2020816000 Base Channel 8C16 3'-4" 16 Galvanized PM 10 1 BC-4 2020816000 Base Channel 8C16 7'-7" 16 Galvanized PM 22 3 BC-5 2020816000 Base Channel 8C16 20'-10 1/2" 16 Galvanized PM 180 1 BC-6 2020816000 Base Channel 8C16 19'-10" 16 Galvanized PM 57

��tic Building System Secondary Job Number: 21-8659

2100 N Pacific Highway Date: 1-7-2022

Woodburn, OR 97071 Detailer: AG tel: {503) 981-9581 fax: {503)981-9584 WT: 2231 Checker: UK

Qty Mark Sh# Inventory Description Part Length Ga Color Wt

4 BL-1 2020816000 Blocking 8C16 3 '-8" 16 Galvanized PM 42

2 G-18 2020814000 Wall Girt 8C14 20'-10 1/2" 14 Galvanized PM 150

2 G-3 2020812000 Wall Girt 8C12 24'-11" 12 Galvanized PM 252

2 E-1 2030812041 Eave Strut 8GS12-4 26'-61/4" 12 Galvanized PM 325 2 E-2 2030812041 Eave Strut 8GS12-4 19'-11 1/2" 12 Galvanized PM 244 2 E-3 2030812041 Eave Strut 8GS12-4 26'-61/4" 12 Galvanized PM 325 2 E-4 2030812041 Eave Strut 8GS12-4 26'-61/4" 12 Galvanized PM 325 2 E-5 2030812041 Eave Strut 8GS12-4 19'-11 1/2" 12 Galvanized PM 244 2 E-6 2030812041 Eave Strut 8GS12-4 26'-61/4" 12 Galvanized PM 325

1:1 Angle Job Number: 21-8659 Pac1tic Building System Date: 12/14/20212100 N Pacific Highway Woodburn, OR 97071 Detailer: A

:rtel: (503) 981-9581 fax: (503)981-9584 WT: 528 Checker:

Qty Mark Sh# Inventory Description Part Length Ga Color Wt 12 WJA-11 3000705160 Window Jamb Angle 3 x 3 WJA- 0'-11" 16 Galvanized 15 12 WJA-15 3000705160 Window Jamb Angle 3 x 3 WJA- 1'-3" 16 Galvanized 20

4 BAG 3000402160 Base/Gable Angle BAG 20'-0" 16 Galvanized 213 8 BGA 3020624160 Base/Gable Angle BGA 20'-0" 16 Galvanized 213

20 GCA-18 3000508220 Girt Closure GCA-18 1'-6" 22 Galvanized 16

4 ESP-2 6070608000 (4) Bolt Eave Clip ESP-2 1'-2" 12 Galvanized 7

6 CL-1 3000000100 Special Girt Clip See Print 0'-6" Galvanized 7

3 DHC8L 3000714160 Door Header Channel 8" - Long DHC8L- 3'-4 1/2" 16 Galvanized 38

�b - -- Warehouse Job Number: 21-8659 PacItIc Building System

Date: 12-14-2021 2100 N Pacific Highway Woodburn, OR 97071 Detailer: AG tel: {503) 981-9581 fax: {503)981-9584 WT: 566 Checker: UK

Qty Mark Inventory Description Part Length Color Wt

250 ANGL 6010410001 10-16 x 1" Pancake Head PHlO0PL 0'-1" Plain 4

250 ANGL 6010120001 12-14 x 1" Tek3 Plain w/o Wash T3100PL 0'-1" Plain 4

� Note 7 6030705125 1/2 x 1-1/4 Finhead Zinc Bolt 050x125F 0'-1 1/4" Plated 37 l%Q- Note 8 6030105125 1/2 x 1-1/4 Gr5 Zinc Bolt 050x125P 0'-1 1/4" Plated 176

Hr4 Note 9 6030205000 1/2 Gr5 Zinc Nut 050NP Plated 52

22 6030806200 5/8 x 2" A325 Galv Bolt 063x200G 0'-2" Galvanized 5

22 6030906200 5/8 A563 Galv Nut 063NG Galvanized 2

90 6030807250 3/4 x 2-1/2 A325 Galv Bolt 075x250G 0'-2 1/2" Galvanized 43

40 6030807175 3/4 x 1-3/4 A325 Galv Bolt 075x175G 0'-1 3/4" Galvanized 13

130 6030907500 3/4 A563 Galv Nut 075NG Galvanized 23

96 AL-1 6070300001 AL-1 Girt Clip AL-1 0'-6" Galvanized 161

4 AL-8 6070615000 AL-8 Girt Clip AL-8 0'-10 7/8" Galvanized 10

16 PL-8G 6070617000 PL-8 Girt Clip PL-8G 0'-10" Galvanized 30

4 SAG-lG 6070619000 Sag Brace Plate SAG-lG 0'-11" Galvanized 5

Modifications to Building Inventory Notes:

Note 7: Finhead Zinc Bolts may be used for erection and only where specifically shown in final construction. Actual quantity does not match inventory shown. At least 130 are available, which are sufficient for project needs.

Note 8: Do not use zinc plated 1 /2" bolts. Provide new hot dip galvanized bolts as noted in project drawings. Actual quantity does not match inventory shown.

Note 9: Do not use zinc plated 1 /2" nuts. Provide new hot dip galvanized nuts as noted in project drawings. Actual quantity does not match inventory shown.

File details come from the government source that posted it. Updated .