This Statement of Work from the Oregon Department of Transportation (ODOT) details the construction requirements for the Hunter Creek Maintenance Station Sander Storage Building project. The project involves constructing a new Pre-engineered Metal Building (PEMB), including clearing and excavation, storm drainage, concrete foundations, aggregate fill and grading. ODOT will provide the PEMB metal frame, roofing panels and related components for erection from a cancelled project, along with original construction drawings and an inventory of metal frame components. The contractor must validate ODOT's inventory list and note any missing pieces within two weeks of Notice to Proceed (NTP).
The project is structured with a Base Bid and Add Alternate #1 due to limited funding availability. The Base Bid includes foundations, building erection, below-grade utilities, utility trenching, and site grading. Add Alternate #1, if awarded, requires the contractor to furnish and install pre-finished metal siding and trim at south and west walls as detailed in the plans and specifications. ODOT notes that available funding may not be adequate to construct the entire project, and the additive alternate is being used to maximize work within funding constraints.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
STATEMENT OF WORK
ODOT HUNTER CREEK MAINTENANCE STATION SANDER STORAGE BUILDING
The project consists of construction of a new Pre-engineered Metal Building (PEMB), including clearing and excavation, storm drainage, concrete foundations, aggregate fill and grading.
ODOT will provide the PEMB metal frame, roofing panels and related components for erection. The PEMB was intended for installation on a ODOT site and the initial project has since been cancelled.
ODOT will provide the original construction drawings as well as an inventory of metal frame and components to include steel frames, girts, purlins, cross bracing and related building components.
Contractor shall validate ODOT’s inventory list and provide their confirmation and note any missing pieces two weeks following NTP.
If ODOT awards ADD ALTERNATE #1 Contractor shall provide metal wall panels and miscellaneous components for a complete installation as noted in the Contract Documents.
DESCRIPTION OF BASE BID AND ADD ALTERNATE
Agency has limited funding available for construction of this project and the funding may not be adequate to construct the entire project. An additive alternate is being used to maximize the work that can be completed within the available funding limits.
BASE BID includes: Foundations, erection of the pre-engineered building, below grade utilities, utility trenching and site grading and all work included in the construction documents excluding the work described in the additive alternate below.
ADD ALTERNATE #1 includes: Furnish and install pre-finished metal siding and trim at south and west walls as detailed in the plans and specifications.