00006485_Att D3_Performance Guarantee Requirements.docx

DOCX document 19 KB Posted

Attached to
RFP - Battery Backup Power Systems PA for Wireless Communication Sites
Solicitation number
S-73000-00006485
Issued by
Marion County, Oregon

About this file

This document is an Attachment D3: Performance Guarantee Requirements for a Price Agreement for battery backup power systems, resulting from a solicitation by the Oregon Department of Transportation (ODOT). The document provides an example of minimum performance criteria for a power storage system, and requires the Proposer to fill in a table with the parameters from the proposed battery bank. The Guaranteed Stack Capacity at timed intervals must be calculated based on specific parameters, with the 10-year (120-month) guarantee percentage used in the proposal scoring.

The related state and local contract opportunity is an RFP for Battery Backup Power Systems Price Agreement for ODOT's Wireless Communication sites, covering the jurisdictions of Marion County and the City of Salem. The Price Agreement will provide scalable battery backup power systems for ODOT's wireless microwave and two-way communication sites, on an as-needed basis.

View the file

Other files

File Type Posted
00006485_Att B_Disclosure exemption~1.docx DOCX document
00006485_Att D4_Exp Qual Cert Serv.docx DOCX document
00006485_Att A_Sample PA.docx DOCX document
00006485_RFP.docx DOCX document
00006485 Proposal Scores.xlsx XLSX spreadsheet
00006485_Att F_Scoring Criteria.docx DOCX document
Power System PA - Agenda.docx DOCX document
00006485_Att C_.Proposer Info and Certs.docx DOCX document
00006485_Att D1_Mandatory Technical Requirements.docx DOCX document
00006485_Att D2_System Solution Scenarios.docx DOCX document
00006485_Att E_Price Proposal.xlsx XLSX spreadsheet
Pre-proposal attendees.docx DOCX document
ad to bid powers.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment D3: Performance Guarantee Requirements The following Table A is an example of a minimum performance criteria for a power storage system of the type to be provided under a Price Agreement resulting from this solicitation.

Instructions: Proposer shall fill in Table B with the parameters from the proposed battery bank from Attachment D2 – Project Scenario 1: Power System Solution – Large, following the example of Table A. Calculate the Guaranteed Stack Capacity at the timed intervals with the following parameters: the power system’s battery will be sole source of power with a 48 amp continuous draw once a month for a 24 hour period. Include an explanation of how the capacity values were determined. The Time-Based Energy Capacity Guarantee table is intended to be included in the successful Proposer’s awarded Price Agreement, and will be binding on the proposed battery banks identified in the “Project Scenario 1: Power System Solution – Large” sample.

The percentage listed at the 10 year (120 month) mark in Table B will be used in Proposal scoring – see Attachment F – Power Systems RFP - Scoring Criteria.

Table A - Time-Based Energy Capacity Guarantee Example

A
B
Row#
Months After Commissioning
Guaranteed Stack Capacity (% of Contracted Capacity)
1
At Commissioning
100.0%
2
12
96.0%
3
24
93.6%
4
36
92.0%
5
48
90.5%
6
60
89.2%
7
72
88.0%
8
84
86.9%
9
96
85.9%
10
108
84.8%
11
120
83.8%
12
132
82.8%
13
144
81.8%
14
156
80.8%
15
168
79.8%
16
180
78.9%
17
192
77.9%
18
204
75.5%
19
216
73.1%
20
228
70.6%
21
240
68.0%

Table B – Time Based Energy Capacity Guarantee Fillable Table

A
B
Row#
Months After Commissioning
Guaranteed Stack Capacity (% of Contracted Capacity)
1
At Commissioning
2
12
3
24
4
36
5
48
6
60
7
72
8
84
9
96
10
108
11
120
12
132
13
144
14
156
15
168
16
180
17
192
18
204
19
216
20
228
21
240