Salt Lake City Airport Rental Car Overflow Storage Lot Improvements

Closed State & local contract opportunity Posted

Solicitation number
SLCDA-DCM-542610
State
Utah
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

Salt Lake City Department of Airports is conducting an Invitation for Bid (IFB) for the Rental Car Overflow Storage Lot Improvements project (Project No. 542610, Contract No. CA-007522) located in Salt Lake County, Utah. The project scope encompasses expanding and constructing a new rental car overflow storage area through full depth reclamation (FDR) of existing pavement and base course, with reclaimed material extended into adjacent unpaved areas and finished with asphalt millings to create a uniform storage surface. Additional work includes demolition of existing fencing and installation of new interior fencing to create four separate rental car storage zones, installation of new perimeter fencing for overall area security, upsizing the existing onsite detention pond with a new outlet structure for stormwater control, installation of new overhead light poles and electrical infrastructure, extension of water line service, and installation of a new fire hydrant within the storage area. The successful bidder must hold a valid Utah General Contractor license, maintain comprehensive general liability insurance of $5,000,000 per occurrence and business auto coverage of $5,000,000 per occurrence, and comply with all Airport security requirements and Construction Safety and Security Compliance standards. The mandatory pre-bid meeting is scheduled for March 19, 2026, at 11:00 a.m., with sealed bids due on April 2, 2026, at 1:00 p.m. Substantial completion is required within 60 calendar days from the Construction Notice to Proceed (anticipated May 1, 2026), with final acceptance required within 15 calendar days following completion of punch list items and liquidated damages of $1,000 per day assessed for failure to achieve substantial completion by June 29, 2026. Payment is structured using unit pricing and lump sum methods for various work items, with bid security required at five percent of the total bid amount, and performance and payment bonds each equal to the total contract price.

The project is subject to Salt Lake City's Value-Based Procurement Program, which may provide beneficial consideration to bidders demonstrating specific workplace practices including nondiscrimination policies, apprenticeship programs, drug testing programs, and small business status, thereby offering potential advantages to qualified small business enterprises and disadvantaged vendors. No specific incumbent vendors or current contractors are identified in the procurement documents. All contractors and personnel must comply with comprehensive security and safety protocols established by the Salt Lake City Department of Airports, including security badging procedures through the SLCDA Access Control Office with associated background check fees of $30.00 and training course fees of $9.00-$30.00 depending on access level, as well as submission of an Environmental Protection Plan prior to work commencement and compliance with Utah Division of Water Quality permits. Environmental compliance is mandatory, including implementation of dust and emissions control measures. No specific budget range or award value is disclosed in the available procurement documents; interested bidders must review the complete IFB project manual and associated construction plans to develop comprehensive proposals based on the detailed specifications and site-specific requirements provided.

Opportunity text

The work includes expanding and constructing a new rental car overflow storage area by recycling the existing pavement and base course through full depth reclamation (FDR) and installing asphalt millings to create a uniform overflow storage surface. The reclaimed material will be used to extend the storage area into the adjacent unpaved areas. The project includes demolition of existing fencing and installation of new interior fencing to create four separate rental car storage zones, followed by the installation of new perimeter fencing to secure the overall storage area. Additional work includes upsizing the existing onsite detention pond and installing a new outlet structure for storm water control. The project also includes electrical work including installation of new overhead light poles. A new section of water line and a fire hydrant will also be installed within the rental car overflow storage area.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors