Salt Lake City Airport Baggage Storage Office (BSO) Expansion, Security Checkpoint Demo & Expansion, Escalator & Stairs Terminal Level 1 to Level 2
Closed State & local contract opportunity Posted
- Solicitation number
- SLCDA-DCM-542703, 542704, 542705
- State
- Utah
- Responses due
Opportunity facts
- NIGP codes
- 910 Building Maintenance, Installation And Repair Services
- 67055 Plumbing Fixtures And Parts: Lavatories, Showers, Sinks,Toilets (Water Closets), Toilet Seats (Including Hygienic Type), Tubs, Etc.
- 287 Electronic Equipment, Components, Parts, And Accessories (See Class 730 For Testing Or Analyzing Type)
- 285 Electrical Equipment And Supplies, Except Cable And Wire
- 90922 Building Construction, Non-Residential (Office Bldg., Etc.)
- 36010 Carpets And Rugs: Cotton, Synthetic, Wool, Etc.
- 15049 Millwork: Counters, Custom-Made Cabinets, Shelves, Stairs, Etc.
- 20424 Controllers, Programmable: Industrial Control Devices, Robots, Etc.
- 20464 Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Firewall Devices, Hubs, Line Drivers, Msaus, Routers, Transceivers, Etc.
- 91468 Plumbing
Show all 20
- 91065 Remodeling And Alterations
- 91579 Telecommunication Services (Not Otherwise Classified)
- 54081 Sheetrock And Accessories: Cement, Corners, Floating Compound, Etc. (For Tape See Class 832) (Including Recycled Type)
- 15008 Cabinets, Counters, Shelves, Etc., Ready-Made
- 80360 Public Address Systems, Portable
- 84084 Video And Audio Systems, Accessories And Parts (Closed Circuit Tv) (Including Surveillance Type)
- 90910 Airport Facility Construction
- 91240 Demolition Services
- 91450 Heating, Ventilating And Air Conditioning (Hvac)
- 91020 Escalator And Moving Walkway, Installation, Maintenance And Repair
- UNSPSC codes
- 30161700 Flooring
- 30161900 Molding and millwork
- 43223300 Datacom and network connectivity installation devices and equipment
- 72120000 Nonresidential building construction services
- 72153600 Interior finishing and furnishing and remodeling services
- 32151800 Safety control devices
- 39110000 Lighting Fixtures and Accessories
- 45111705 Public address systems
- 72151201 HVAC mechanical construction service
- 30161503 Drywall
Show all 20
- 30161811 Construction interior fit-out
- 30180000 Plumbing fixtures
- 32130000 Electronic hardware and component parts and accessories
- 46171622 Closed circuit television CCTV system
- 72000000 Building and Facility Construction and Maintenance Services
- 72121410 Airport terminal and hanger construction
- 72141510 Demolition services
- 72151100 Plumbing construction services
- 72154046 Escalator installation service
- 83112300 Fiber telecommunications services
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
Salt Lake City Department of Airports is soliciting bids for three coordinated terminal renovation projects—Security Checkpoint Demo & Expansion, Baggage Storage Office (BSO) Expansion, and Escalator & Stairs Terminal Level 1 to Level 2—with proposals due August 27, 2026.
The scope spans demolition and eastward expansion of TSA queue lanes with new drywall, ceiling, fire alarm and suppression systems, terrazzo flooring, doors, MEP systems, security cameras, PA systems, and signage; construction of five new baggage storage offices at the southwest corner, each with reception and storage areas matching existing southeast-corner BSO offices; and installation of a second 32-inch escalator between Level 1 checkpoint and Level 2 in the location of existing stairs, with relocation of those stairs above the modified Sally Port, and associated demolition and new construction for flooring, ceiling, walls, MEP systems, fire systems, lighting, and relocation of a major cable tray. The escalator and stair work area encompasses approximately 1,240 square feet. Design follows the 2024 International Building Code, 2024 International Existing Building Code, and Utah state construction codes. Construction documents include comprehensive structural, architectural, mechanical, electrical, plumbing, fire protection, security, and telecommunications specifications; concrete materials must meet specified compressive strengths with a maximum embodied carbon (GWP) of 0.98 kg CO2e/kg; special inspections are required for structural work, welding, concrete placement, and reinforcement installation. Contractors must submit Construction Safety Phasing Plans and Safety Plan Compliance Documents for FAA and departmental approval, comply with 49 CFR Part 1542 airport security protocols, maintain mandatory Airport ID badging, and observe terminal work-hour restrictions (0600–1900 hours normal, disruptive activities 2300–0530 hours). No contract value, contract term, or evaluation criteria are specified in the source materials.
Opportunity text
This project consists of three different phases of work that include: a. Security Checkpoint Demo & Expansion: This project expands the TSA queue lanes eastward requiring demolition of existing restroom and baggage storage offices (BSO). Work includes the following new work items: drywall, ceiling, fire alarm and suppressions, terrazzo, doors, MEP, cameras, PA system, and signage. b. Baggage Storage Office (BSO) Expansion: This project includes construction of 5 new baggage storage offices (BSO) located at the southwest corner of the terminal building. Each office includes a reception area and storage area and would be built to closely match the BSO offices at the southeast corner. c. Escalator & Stairs Terminal Level 1 to Level 2: This project will install a second 32" escalator from the Level 1 checkpoint up to Level 2. This new escalator will be installed where the existing stairs are, adjacent to the existing escalator. The existing stairs will be relocated to be above the existing Sally Port, which will also be modified. Work includes demo and new construction for flooring, ceiling, walls, MEP, fire system, and lighting. The work also requires relocation of a major cable tray.
Files
| File | Type | Posted |
|---|---|---|
| 3-BSO Expansion Drawings.pdf | ||
| 1-BSO Expansion, SSCP, ESC-STR Project Manual.pdf | ||
| 5-Construction Safety Manual.pdf | ||
| 4-SSCP Drawings.pdf | ||
| 2-ESC STAIR ADD Drawings.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity