About this opportunity

Salt Lake City Department of Airports is soliciting bids for three coordinated terminal renovation projects—Security Checkpoint Demo & Expansion, Baggage Storage Office (BSO) Expansion, and Escalator & Stairs Terminal Level 1 to Level 2—with proposals due August 27, 2026.

The scope spans demolition and eastward expansion of TSA queue lanes with new drywall, ceiling, fire alarm and suppression systems, terrazzo flooring, doors, MEP systems, security cameras, PA systems, and signage; construction of five new baggage storage offices at the southwest corner, each with reception and storage areas matching existing southeast-corner BSO offices; and installation of a second 32-inch escalator between Level 1 checkpoint and Level 2 in the location of existing stairs, with relocation of those stairs above the modified Sally Port, and associated demolition and new construction for flooring, ceiling, walls, MEP systems, fire systems, lighting, and relocation of a major cable tray. The escalator and stair work area encompasses approximately 1,240 square feet. Design follows the 2024 International Building Code, 2024 International Existing Building Code, and Utah state construction codes. Construction documents include comprehensive structural, architectural, mechanical, electrical, plumbing, fire protection, security, and telecommunications specifications; concrete materials must meet specified compressive strengths with a maximum embodied carbon (GWP) of 0.98 kg CO2e/kg; special inspections are required for structural work, welding, concrete placement, and reinforcement installation. Contractors must submit Construction Safety Phasing Plans and Safety Plan Compliance Documents for FAA and departmental approval, comply with 49 CFR Part 1542 airport security protocols, maintain mandatory Airport ID badging, and observe terminal work-hour restrictions (0600–1900 hours normal, disruptive activities 2300–0530 hours). No contract value, contract term, or evaluation criteria are specified in the source materials.

Opportunity text

This project consists of three different phases of work that include: a. Security Checkpoint Demo & Expansion: This project expands the TSA queue lanes eastward requiring demolition of existing restroom and baggage storage offices (BSO). Work includes the following new work items: drywall, ceiling, fire alarm and suppressions, terrazzo, doors, MEP, cameras, PA system, and signage. b. Baggage Storage Office (BSO) Expansion: This project includes construction of 5 new baggage storage offices (BSO) located at the southwest corner of the terminal building. Each office includes a reception area and storage area and would be built to closely match the BSO offices at the southeast corner. c. Escalator & Stairs Terminal Level 1 to Level 2: This project will install a second 32" escalator from the Level 1 checkpoint up to Level 2. This new escalator will be installed where the existing stairs are, adjacent to the existing escalator. The existing stairs will be relocated to be above the existing Sally Port, which will also be modified. Work includes demo and new construction for flooring, ceiling, walls, MEP, fire system, and lighting. The work also requires relocation of a major cable tray.