4-SSCP Drawings.pdf
PDF 70 MB Posted
- Solicitation number
- SLCDA-DCM-542703, 542704, 542705
- Issued by
- Utah
About this file
This file contains construction drawings for the Salt Lake City Airport's baggage storage office expansion and security checkpoint renovation project in Utah. The drawings document the architectural and engineering designs for three distinct phases of work: the Security Checkpoint Demo & Expansion, which involves demolishing existing restroom and baggage storage facilities and constructing new TSA queue lanes with associated MEP systems and finishes; the Baggage Storage Office Expansion, which requires constructing five new baggage storage offices at the southwest corner of the terminal building with reception and storage areas matching existing southeast corner offices; and the Escalator & Stairs Terminal Level 1to Level 2 project, which includes installing a second 32-inch escalator in place of existing stairs while relocating those stairs above the Sally Port and reconfiguring related MEP, fire protection, and lighting systems along with a major cable tray relocation.
The drawings serve as the technical specifications and design documentation necessary for bidders to understand the scope of construction work, building layouts, material specifications, and system requirements across all three project phases. These architectural and engineering drawings would be used in conjunction with the detailed scope of work documentation to establish the baseline for cost estimates, scheduling, and material procurement during the bidding process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-ESC STAIR ADD Drawings.pdf | ||
| 1-BSO Expansion, SSCP, ESC-STR Project Manual.pdf | ||
| 3-BSO Expansion Drawings.pdf | ||
| 5-Construction Safety Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .