Real Vista Drive

Closed State & local contract opportunity Posted

Solicitation number
HERR11172025
State
Utah
Responses due

Opportunity facts

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

Herriman City, Utah is seeking a construction contractor for the Real Vista Drive infrastructure improvement project, which involves widening the existing intersection at Real Vista Drive and Mountain Corridor. The comprehensive project scope includes new full-depth pavement, pavement milling and overlay, curb and gutter installation, ADA-compliant ramps, and asphalt sidewalk construction. Additional technical requirements include jack and bore operations for 70 linear feet of 36-inch steel casing, installation of pipe systems (54 linear feet of 18-inch HP pipe, 348 linear feet of 24-inch HP pipe, and 115 linear feet of 30-inch HP pipe), as well as a new traffic signal system with associated signing and striping. Bidder qualifications mandate that contractors must have completed five similar projects since 2015 and provide project references with contact information. A mandatory pre-bid meeting is scheduled for December 3, 2025, at 11:00 AM, with sealed bids due by 11:00 AM on December 17, 2025, at Herriman City Hall. Bid security of 5 percent of the bid amount is required, and bids will remain valid for 45 days after opening, with the contract time for substantial completion set for September 15, 2026.

The procurement does not specify any specific set-aside designations or restrictions for disadvantaged enterprises. The project is not federally funded, which eliminates certain compliance requirements typically associated with federal contracts. Contractors must provide Performance and Payment Bonds equal to the contract price and maintain comprehensive general and automobile liability insurance with minimum limits of $2,000,000 per occurrence for personal injury and $1,000,000 per occurrence for property damage. Worker's compensation insurance consistent with Utah statute is also mandatory. The contract includes liquidated damages of $1,000 per calendar day for late completion and allows the owner to retain up to 5 percent of work value, with potential reduction as the project progresses. While a specific budget range is not explicitly stated, the comprehensive infrastructure improvements and technical specifications suggest a significant capital investment. All work must comply with UDOT 2026 Standard Specifications and Herriman City Standards and Specifications, ensuring high-quality construction and adherence to local infrastructure development guidelines.

Opportunity text

Widen the existing intersection at Real Vista Drive and Mountain Corridor, including new full-depth pavement, pavement milling and overlay, curb, gutter, ADA ramps, and asphalt sidewalk. Jack and bore 70 linear feet 36" steel casing. Install 54 linear feet 18" HP Pipe. Install 348 linear feet 24" HP Pipe. Install 115 linear feet 30" HP Pipe. Install a traffic signal system. Install signing and striping. There will be a mandatory Pre-Bid Meeting held on December 3, 2025 at 11:00 AM, and the Bid Opening will be on December 17, 2025 at 11:00 AM.