1-2025.09.11 Real Vista Drive Final Drawings signed.pdf
PDF 76 MB Posted
- Attached to
- Real Vista Drive
- Solicitation number
- HERR11172025
- Issued by
- Utah
About this file
Real Vista Drive Final Drawings Summary
This document comprises final construction drawings for a state and local infrastructure project in Utah involving the widening of the existing intersection at Real Vista Drive and Mountain Corridor. The project scope includes new full-depth pavement, pavement milling and overlay, curb and gutter installation, ADA-compliant ramps, and asphalt sidewalk. Additional infrastructure work encompasses jack and bore operations for 70 linear feet of 36-inch steel casing, installation of 54 linear feet of 18-inch HP pipe, 348 linear feet of 24-inch HP pipe, and 115 linear feet of 30-inch HP pipe. The project also includes installation of a traffic signal system, signing, and striping. A mandatory pre-bid meeting is scheduled for December 3, 2025 at 11:00 AM, with bid opening scheduled for December 17, 2025 at 11:00 AM.
The final drawings document provides comprehensive design specifications and construction details necessary for contractors to prepare accurate bids for this infrastructure improvement project. These signed drawings serve as the authoritative technical reference for all construction activities and establish the baseline requirements for project execution, material specifications, and quality standards that bidders must incorporate into their proposals and contractors must follow during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-RealVistaContractBook.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .