Martin Luther King Recreation Center Playground
Closed State & local contract opportunity
- Solicitation number
- 2025-PARKS & RECREATION-081
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 650 Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
- 65006 Benches, Park (Including Bus Stop Benches)
- 75056 Lightweight Aggregate, All Types
- 90672 Recreation Facilities (Parks, Marinas, Etc.) - Architectural Services
- 91244 Excavation Services
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91430 Concrete
- UNSPSC codes
- 49240000 Recreation and playground and swimming and spa equipment and supplies
- 46161535 Pedestrian walkway street boundary marker
- 72141105 Sidewalk construction and repair service
- 95111617 Footpath
- 72152902 Concrete reinforcement placing service
- 11111811 Haydite
- 72141505 Earthmoving service
- 73151802 Slitting services
- 72152705 Sidewalk or ramp construction service
- 95111608 Bike path
Show all 27
- 72152702 Grouting service
- 72152703 Gunite installation service
- 72154012 Concrete forms erection and dismantling service
- 72141503 Rock removal service
- 73151801 Sheeting services
- 72152700 Concrete installation and repair services
- 72152709 Concrete pumping service
- 72152711 Concrete patio construction service
- 72152908 Smoke stack installation service
- 72141504 Timber removal service
- 46161538 Vehicle height restriction bars
- 72152706 Driveway construction service
- 72152707 Retaining wall construction service
- 95111616 Pedestrian way
- 72152701 Exterior concrete stucco service
- 72152710 Foundation and footing construction service
- 72152907 Precast concrete structural framing panel placing service
- Point of contact
-
- Kari Kerstetter kkerstetter@cityofjackson.org (517) 768-6401
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Jackson is seeking bids for the Martin Luther King Recreation Center Playground Project, a comprehensive playground development initiative funded through a federal Spark Grant and involving the Department of Natural Resources. The project aims to construct a new playground targeting children aged 5-12, with a minimum requirement of seven ADA accessible play opportunities. Bidders must be pre-qualified as Certified Playground Installers and demonstrate experience in providing play equipment that meets National and State of Michigan industry standards. Two design packages are proposed: one with Engineered Wood Fibar surfacing and another with Poured-in-Place surfacing, both including playground equipment, swings, concrete walks, perimeter curbing, and site restoration. The Request for Proposal (RFP) was released on October 15, 2025, with a response deadline of October 30, 2025, at 10:00 am, and a mandatory pre-bid meeting scheduled for October 23, 2025, at 11:00 am at the MLK Rec Center. Contractors are required to submit five playground references, appropriate certifications, insurance, bonds, and liability coverage, along with a certified playground safety inspector's letter confirming compliance with industry standards.
The project appears to have provisions encouraging participation from diverse business enterprises, with specific emphasis on distributing bid opportunities to women-, veteran-, and minority-owned businesses. The total project budget is $663,300, with no contingencies, and the goal is to maximize available funds. Bidders must submit pricing on a lump sum basis for various components including earthwork, concrete walks, playground equipment, surfacing, and site restoration. The project is potentially funded through ARPA (American Rescue Plan Act) and requires comprehensive documentation of the bidding process. The City reserves the right to adjust the playground size, shape, or number of components based on unforeseen conditions. Contractors must comply with multiple federal requirements, including minority business participation, Section 3 hiring regulations targeting low-income individuals, and equal opportunity employment standards. The project is scheduled for completion by June 30, 2026, and involves multiple compliance documents including Labor and Material Payment Bonds, Performance Bonds, and adherence to Davis-Bacon wage determinations.
Opportunity text
The playground project at the MLK Recreation Center was funded through a federal Spark Grant, which brought together community leaders and the Department of Natural Resources to make this project possible. The importance of this playground is to provide new opportunities for all within walking distance from their homes or across the community. Parks represent growth and community presence in neighborhoods.
Files
Show all 30
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity