Enlisted Barracks 1, 2, 3, and 4

Closed State & local contract opportunity Posted

Solicitation number
S-24800-00000397
State
Oregon
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 30

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Military Department Joint Force Headquarters, Oregon National Guard Installations Division issued an Invitation to Bid (ITB) for Project Number 219995C001, seeking the construction of four complete and usable Enlisted Barracks buildings at the Camp Umatilla Training Center in Umatilla County, Oregon. The comprehensive project scope includes excavation, site utilities, landscaping, structural and foundations, exterior envelope and waterproofing, roofing, interior and exterior framing, and mechanical, plumbing, electrical, and low voltage systems for all four barracks. A mandatory pre-bid conference was held on August 17, 2021, and bids were due by September 23, 2021. The project requires substantial completion within 580 calendar days and final completion within 610 calendar days from the notice to proceed. Bidders were required to meet Construction Contractors Board registration requirements, provide bid security, performance bonds, and payment bonds, and comply with prevailing wage rates. Bidders were instructed to submit lump sum pricing for the base bid of each barracks building, including owner-controlled contingency amounts, and the project included several additive bid alternates that the owner may elect to include.

The ITB documents did not indicate any specific set-aside designations or restrictions on respondent types. Five responsive bidders were identified: Deacon Construction, Chervenell Construction, Fowler General Construction, Fortis Construction, and Griffin Construction. The total project estimate was between $25 million to $27 million, with bid amounts for the base bids ranging from $18,900,000 to $23,888,883. Ultimately, Fowler General Construction was selected to receive four separate contracts for the barracks, with a total combined contract price of $19,433,000.00. The contract prices were broken down individually: EB1 at $7,463,000.00, EB2 at $2,000,000.00, EB3 at $7,970,000.00, and EB4 at $2,000,000.00. The awarded contracts include base bids, various alternates, and an owner-controlled allowance for each contract. Fowler General Construction was required to provide performance and payment bonds, a certificate of pay equity training, and evidence of insurance coverage prior to receiving the Notice to Proceed.

Opportunity text

SEE ITB DOCUMENTS The Project includes the new construction of four (4) complete and usable Enlisted Barracks buildings to be built concurrently. The Project scope includes, but is not limited to, all excavation, site utilities, landscaping, structural and foundations, exterior envelope and waterproofing, roofing, interior and exterior fram

Files

File Type Posted
219995C001 preliminary results from opening.pdf PDF
EB1_Addendum A_8-13-2021~1.zip ZIP file
EB1_Addendum C_09-07-21.zip ZIP file
EB1_Permit and Bid_Drawings_8-2-2021.pdf PDF
EB2_Addendum B_08-27-21.zip ZIP file
EB2_Permit and Bid_Drawings_8-2-2021.pdf PDF
EB3_Permit and Bid_Drawings_8-2-2021.pdf PDF
EB4_Addendum B_08-27-21.zip ZIP file
EB4_Addendum C_09-07-21.zip ZIP file
Exhibit 1 to addendum 2 Camp Umatilla Barracks - RFI Log With Responses 8-30-21.pdf PDF
Exhibit 1 to addendum 4 Camp Umatilla Barracks - RFI Log With Responses FINAL 9-13-21.pdf PDF
RFQ - Mandatory Bid Proposal Form Umatilla Hatchery Forklift.gov - Copy - Copy.docx DOCX document
219995C001 Addendum 4 final for posting.pdf PDF
EB1_ADDENDUM C_09-13-21.zip ZIP file
EB3_ADDENDUM C_09-13-21.zip ZIP file
EB3_Addendum A_8-13-2021.zip ZIP file
EB4_Addendum A_8-13-2021.zip ZIP file
ITA 219995C001.pdf PDF
219995C001 Addendum 1 final.pdf PDF
219995C001 Addendum 2 final for posting.pdf PDF
219995C001 Addendum 3 final for posting.pdf PDF
CUTC Contractor and Visitor Safety In briefing FINAL 03262021.pdf PDF
EB1_Addendum B_08-27-21.zip ZIP file
EB1_Permit and Bid_Project Manual_8-2-2021.pdf PDF
EB2 and EB4_Permit and Bid_Project Manual_8-2-2021.pdf PDF
EB2_Addendum A_8-13-2021~1.zip ZIP file
EB3_Addendum B_08-27-21.zip ZIP file
EB3_Addendum C_09-07-21.zip ZIP file
ITB 219995C001 DOJ Approved Final AS POSTED.pdf PDF
219995C001 Responsiveness Check FINAL BID RESULTS.pdf PDF
EB2_ADDENDUM C_09-13-21.zip ZIP file
EB3_Permit and Bid_Project Manual_8-2-2021.pdf PDF
PreBid Attendees list.pdf PDF
EB4_Permit and Bid_Drawings_8-2-2021.pdf PDF
EB4_ADDENDUM C_09-13-21.zip ZIP file
Show all 35

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity