219995C001 Addendum 3 final for posting.pdf

PDF 139 KB Posted

Attached to
Enlisted Barracks 1, 2, 3, and 4
Solicitation number
S-24800-00000397
Issued by
Multnomah County, Oregon

About this file

This document is an Addendum to the Invitation to Bid (ITB) for Project Number 219995C001, CUTC Enlisted Barracks i, ii, iii, iv, issued by the Oregon Military Department Joint Force Headquarters, Oregon National Guard Installations Division. The addendum outlines changes and clarifications to the ITB, including the addition of new zip files to the Technical Specifications and Plans and Drawings, and the removal of certain previously provided files. Bidders must acknowledge receipt of this Addendum and incorporate the changes into their bids. The overall project involves the new construction of four complete and usable Enlisted Barracks buildings to be built concurrently in Umatilla County, Oregon.

The document does not provide specific details on pricing terms, set asides, incumbents, funding requirements, or other salient financial information. It focuses solely on the administrative changes to the ITB and the overall scope of the construction project.

View the file

Other files

File Type Posted
219995C001 preliminary results from opening.pdf PDF
EB1_Addendum A_8-13-2021~1.zip ZIP file
EB1_Addendum C_09-07-21.zip ZIP file
EB1_Permit and Bid_Drawings_8-2-2021.pdf PDF
EB2_Addendum B_08-27-21.zip ZIP file
EB2_Permit and Bid_Drawings_8-2-2021.pdf PDF
EB3_Permit and Bid_Drawings_8-2-2021.pdf PDF
EB4_Addendum B_08-27-21.zip ZIP file
EB4_Addendum C_09-07-21.zip ZIP file
Exhibit 1 to addendum 2 Camp Umatilla Barracks - RFI Log With Responses 8-30-21.pdf PDF
Exhibit 1 to addendum 4 Camp Umatilla Barracks - RFI Log With Responses FINAL 9-13-21.pdf PDF
RFQ - Mandatory Bid Proposal Form Umatilla Hatchery Forklift.gov - Copy - Copy.docx DOCX document
219995C001 Addendum 1 final.pdf PDF
219995C001 Addendum 2 final for posting.pdf PDF
CUTC Contractor and Visitor Safety In briefing FINAL 03262021.pdf PDF
EB1_Addendum B_08-27-21.zip ZIP file
EB1_Permit and Bid_Project Manual_8-2-2021.pdf PDF
EB2 and EB4_Permit and Bid_Project Manual_8-2-2021.pdf PDF
EB2_Addendum A_8-13-2021~1.zip ZIP file
EB3_Addendum B_08-27-21.zip ZIP file
EB3_Addendum C_09-07-21.zip ZIP file
ITB 219995C001 DOJ Approved Final AS POSTED.pdf PDF
219995C001 Responsiveness Check FINAL BID RESULTS.pdf PDF
EB2_ADDENDUM C_09-13-21.zip ZIP file
EB3_Permit and Bid_Project Manual_8-2-2021.pdf PDF
PreBid Attendees list.pdf PDF
EB4_Permit and Bid_Drawings_8-2-2021.pdf PDF
EB4_ADDENDUM C_09-13-21.zip ZIP file
219995C001 Addendum 4 final for posting.pdf PDF
EB1_ADDENDUM C_09-13-21.zip ZIP file
EB3_ADDENDUM C_09-13-21.zip ZIP file
EB3_Addendum A_8-13-2021.zip ZIP file
EB4_Addendum A_8-13-2021.zip ZIP file
ITA 219995C001.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OREGON MILITARY DEPARTMENT

JOINT FORCE HEADQUARTERS, OREGON NATIONAL GUARD

INSTALLATIONS DIVISION

1776 MILITIA WAY SE

P.O. BOX 14350

SALEM, OREGON 97309-5047

Addendum 3 -219995C001 1

August 31, 2021

SUBJECT: Addendum Number 3 to Project Number 219995C001, CUTC Enlisted Barracks i, ii, iii, iv.

Project number 219995C001 (oregonbuys number S-24800-00000397)

TO ALL PROSPECTIVE BIDDERS AND ALL OTHERS CONCERNED

1. The changes, clarifications, omissions, additions, and alterations in, on, and to the bidding information and specifications shall apply to the bids made for and to the project indicated above. Except as modified by this Addendum Number 3, all of the terms and provisions of the Invitation to Bid (ITB) for the above listed project remain in full force and effect. This Addendum Number 3 supersedes all previous instructions pertaining to the items listed:

CHANGES TO ITB

2. Changes to ITB: The following revisions are made to the ITB. (Where applicable, deleted language is indicated in strikethrough new language is indicated in bold underline).

A. Attachment B Technical Specifications and Attachment C Plans and Drawings

The following files are hereby by added to Attachment B Technical Specifications and Attachment C Plans and Drawings.

EB1 Addendum C_09-07-2021 zip file EB3 Addendum C_09-07-2021 zip file EB4 Addendum C_09-07-2021 zip file

B. The following files are hereby by removed from Attachment B Technical Specifications and Attachment C Plans and Drawings.

EB1 Addendum A_8-13-2021.zip 00 01 10 – TABLE OF CONTENTS.pdf EB3 Addendum A 8-13-2021.zip 00 01 10 – TABLE OF CONTENTS.pdf EB4 Addendum B 8-27-2021.zip M201 - MECHANICAL - LEVEL 01 - HVAC.pdf EB4 Addendum B 8-27-2021.zip M202 - MECHANICAL - LEVEL 02 – HVAC.pdf EB4 Addendum B 8-27-2021.zip M301 - MECHANICAL - LEVEL 01 - HVAC PIPING.pdf EB4 Addendum B 8-27-2021.zip M302 - MECHANICAL - LEVEL 02 - HVAC PIPING.pdf

NO ITEMS FOLLOW

3. This addendum must be acknowledged and submitted for this project. By acknowledging this addendum on Section H, (2), (a) of the ITB, the bidder agrees they have read and understood the above mentioned changes, and have incorporated those changes into their bid.

PROTEST OF ANY CHANGES TO THE ITB MADE BY THIS ADDENDUM MUST BE SUBMITTED IN

WRITTEN FORM TO SAM GOFF, CONTRACT SPECIALIST, OREGON MILITARY DEPARTMENT-

AGI, 1776 MILITIA WAY SE, SALEM, OREGON BY 3:00 PM ON SEPTEMBER 9, 2021.

File details come from the government source that posted it. Updated .