Cochran Airport - South Airport Apron and Stub Taxiway Rehabilitation Project
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66203-NONST-2024-000000004
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 25191500 Air transportation support systems and equipment
- 25191505 Aircraft cargo handling equipment
- 25191507 Aircraft deicing equipment
- 25191508 Jetways
- 25191511 Lavatory service equipment for aircraft
- 25191512 Airstairs or stair trucks
- 25191521 Retractable hook cable support system
- 25191526 Automatic terminal information service ATIS
- 25191541 Drone station
- 25191543 Aircraft and airborne equipment for fire fighting and rescue
Show all 26
- 25191544 Airport flight management system
- 25191545 Common use terminal equipment
- 25191546 Oxygen filling cart
- 25191547 Baggage and cargo handling system
- 25191548 Water servicing unit
- 25191549 Catering service unit
- 25191550 Servicing/maintenance platform
- 25191551 Ground vehicle/transportation tracking system
- 25191552 Flight information display system
- 25191553 Preconditioned air unit
- 25191554 Mobile ATA control tower
- 25191555 Cart, baggage - passenger
- 25191556 Baggage cart accessories
- 25191557 Airport/aviation billing system
- 46161501 Airport signaling systems
- 46161528 Airport warning light
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The state and local contract opportunity is for the rehabilitation of the south apron and stub taxiway at the Cochran Airport in Georgia. The project, which is being procured by the state of Georgia and the jurisdictions of Dade County and Colquitt City, involves milling the existing pavement, crack sealing, installing a crack relief interlayer, and placing a new 2-inch asphalt surface course. The scope of work includes pavement removal, earthwork, storm drainage improvements, new asphalt pavement construction, pavement markings, and lighting improvements. Bids are due by January 18, 2024, and a mandatory pre-bid conference may be held. The contract is expected to be a lump sum award, with the successful bidder required to provide a total bid price.
The procurement does not appear to have any set-aside designations or restrictions on the types of organizations that can respond. The government files do not identify any incumbent contractors or existing infrastructure that requires integration. The total estimated project cost is $1.2 million, with 90% of the funding coming from a federal Airport Improvement Program (AIP) grant and the remaining 10% from local matching funds.
Opportunity text
The project includes the pavement rehabilitation of the Cochran Airport south apron and stub taxiway connecting the apron to Runway 5-23. The project includes a proposed 3-inch milling of the existing pavement, crack seal, 1-inch open graded crack relief interlayer, and 2-inch asphalt surface course.
Files
| File | Type | Posted |
|---|---|---|
| Airport_ South Apron Stub Taxiway Rehabilita.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity