Chiller Replacement
Closed State & local contract opportunity
- Solicitation number
- 25-CR-050
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 03113 Chillers, Heat Exchangers And Receivers
- 12032 Chiller, Water, Large Flow Capacity (To Chill Hatchery Water)
- 91450 Heating, Ventilating And Air Conditioning (Hvac)
- 93648 Industrial Equipment (Not Construction And Repair, Or Hvac) Maintenance And Repair
- 94155 Hvac Systems Maintenance And Repair, Power Plant
- UNSPSC codes
- 40101711 Centrifugal liquid chiller
- 72152904 Exterior metal wall system installation service
- 73152107 Machining equipment rebuild and refurbishment service
- 40101817 One pass exchangers
- 72151003 Heating system maintenance and repair service
- 72151004 Hydronics heating system maintenance and repair service
- 72151203 HVAC solar energy construction service
- 72151205 HVAC refrigeration construction service
- 40101712 Screw chiller
- 40101813 Double split exchangers
Show all 25
- 40101823 Two pass exchangers
- 40101835 Plate heat exchanger
- 72151201 HVAC mechanical construction service
- 72151204 HVAC ventilation and duct work construction service
- 72151206 HVAC heating system construction service
- 40101710 Reciprocating chiller
- 40101713 Absorption chiller
- 40101714 Absorption chiller heater
- 40101812 Divided exchangers
- 40101816 Kettle exchangers
- 40101820 Split exchangers
- 40101836 Shell and tube heat exchanger
- 72151200 Heating and cooling and air conditioning HVAC construction and maintenance services
- 72151202 HVAC process piping construction service
- 73152100 Manufacturing equipment maintenance and repair services
- Point of contact
-
- Lindsey Bennett bennettlind@pcsb.org
Updated .
About this opportunity
Pinellas County School Board is seeking bids for ITB #25-CR-050, a comprehensive chiller replacement project at Bay Point Elementary School. The procurement involves removing and replacing one 460-ton water-cooled chiller, including reconnecting chilled and condenser water piping, DDC controls, and electrical connections. The scope extends to replacing two existing induced draft open cooling towers with three new induced draft cooling towers, replacing condenser water piping, and replacing two existing condenser water pumps. Two optional alternates are included: replacing Primary Chilled Water Pumps (PCHP-1 & 2) and Secondary Chilled Water Pumps (SCHP-1, 2 & 3). Bidders must be Florida Licensed Mechanical Contractors with documented experience in three major mechanical equipment replacement projects, including one chiller replacement within the last five years. A mandatory pre-bid conference is scheduled for May 2, 2025, at 10:00 am, with bids due by 3:00 pm on May 16, 2025, through the District's OpenGov Procurement portal. Evaluation criteria will focus on responsiveness, responsibility, and lowest bid meeting all specifications.
The procurement appears to be open to all qualified mechanical contractors without specific set-aside designations for disadvantaged enterprises. Contractors must provide evidence of business experience, comply with background screening requirements, and have valid E-Verify compliance. The project will require integration with existing building automation systems and minimal disruption to school operations. The estimated contract value is approximately $700,000, with a $10,000 contingency included and no markup. Contractors must provide comprehensive insurance coverage, including $1,000,000 per occurrence for General Liability, $300,000 Combined Single Limit for Automotive Liability, and statutory Workers' Compensation coverage. The contract period will commence upon Notice of Intent and end 365 days later, with liquidated damages of $500 per day for each calendar day beyond the specified completion date. The project includes a contingency fee intended to defray expenses for unforeseen circumstances, and the entire contract will be awarded to the lowest responsive and responsible bidder meeting all specifications.
Opportunity text
The Scope of Work to be performed under this project consists of furnishing all labor/materials necessary to complete the removal and replacement of one (1) 460-ton water cooled chiller. Work includes is connecting and reconnecting all chilled water and condenser water piping, DDC controls and associated electrical connections. Contractor shall install one (1) new owner-furnished water-cooled chiller and make all required, mechanical, electrical, and DDC connections. Update existing refrigerant leak detection and exhaust system to monitor refrigerant leakage of all refrigerants in use after the renovation work. Two existing induced draft open cooling towers shall be replaced with three new induced draft cooling towers. The condenser water piping serving the cooling towers shall be replaced with new. Two (2) existing condenser water pumps shall be replaced with new.
Files
Show all 19
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity