2025-4-10_BayPoint_ES_Chiller_Replacement_Plans_S&S.pdf
PDF 2 MB Posted
- Attached to
- Chiller Replacement State and local contract opportunity
- Solicitation number
- 25-CR-050
- Issued by
- Pinellas County, Florida
About this file
The document is a comprehensive set of engineering and construction plans for a chiller replacement project for the School Board of Pinellas County, specifically at Bay Point Elementary/Middle School located at 5800 22nd Street South in St. Petersburg, Florida. The project, identified as FDC Project No. 9509, involves replacing one 460-ton water-cooled chiller (Carrier 19MVR 460 model with R-513A refrigerant), two existing induced draft cooling towers with three new induced draft cooling towers (Evapco 312-4M42), and associated mechanical, electrical, and control systems. The plans are dated February 13, 2025, with a bid and permit set scheduled for April 8, 2025, and include detailed mechanical schematics, electrical diagrams, structural framing plans, and equipment schedules.
The project includes optional alternates for replacing primary and secondary chilled water pumps, with comprehensive documentation covering equipment specifications, electrical connections, system integration, and sequence of operations. The design emphasizes redundancy and system flexibility, with provisions for chiller, pump, and cooling tower rotation to ensure even wear and optimal performance. Electrical requirements include modifications to existing motor control centers, variable frequency drives, and control panels, with careful attention to maintaining existing building automation system interfaces. The plans specify detailed requirements for installation, including concrete pad preparations, piping connections, refrigerant monitoring, and compliance with Florida Building Code and other relevant standards. The project appears to be fully funded and is part of a planned infrastructure upgrade for the school district's mechanical systems.
View the file
Other files for this state and local contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© Copyright BCER Engineering ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.
SHEET NO:
SHEET TITLE:
ISSUE RECORD:
© BCER Engineering Inc.
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940 | 321.241.4142
CA# 9303
PROGRESS - NOT FOR
CONSTRUCTION
SCALE:
/7
/2
:3
:1
P M
C U s e rs \p k o s ia ra \D o c u m e n ts \1
-B a y P o in tE S
C h ill e rR e p la c e m e n t- E le c -R p k o s ia ra B
C E
R .r v t
C0.1
DATE: 02/13/25
COVER SHEET
B A
Y P
O
IN
T E
S /M
S C
H
IL
L E
R R
E P
L A
C E
M E
N T n d S tr e e t
S o u th S t.
P e te rs b u rg
F lo ri d a
BCER PROJECT 132324002
NO: DESCRIPTION: DATE:
100% CD 02/05/2025
Permit 04/08/2025 at
CHILLER REPLACEMENT
BAY POINT ELEMENTARY/MIDDLE SCHOOL
FDC PROJECT
for
PROJECT NO: 9509
PREPARED FOR
SCHOOL BOARD OF PINELLAS COUNTY
LAURA HINE - CHAIRPERSON
CAPRICE EDMOND - VICE CHAIRPERSON
KATIE BLAXBERG
LISA N. CANE
STEPHANIE MEYER
DAWN M. PETERS
SUPERINTENDENT OF SCHOOLS
KEVIN K.HENDRICK
E2.1 EXISTING CHILLER PLANT - POWER PLAN
ED2.1 EXISTING CHILLER PLANT - POWER DEMOLITION PLAN
E0.2 ELECTRICAL PROJECT NOTES
E0.1 ELECTRICAL GENERAL INFORMATION
M6.1 MECHANICAL DETAILS
M5.1 MECHANICAL SCHEMATICS
M2.1 CHILLER PLANT - NEW MECHANICAL PLAN
MD2.1 EXISTING CHILLER PLANT - MECHANICAL DEMOLITION...
M0.02 MECHANICAL SCHEDULES
M0.1 MECHANICAL GENERAL INFORMATION
S1.0 FRAMING PLAN
C0.1 COVER SHEET
SHEET NUMBER SHEET TITLE
PROJECT DRAWING LIST
EILEEN M.LONG
BID AND PERMIT SET APRIL 8, 2025
C
S1.0
4' - 10 3/4" 13' - 10" 4' - 8"
2' - 6" 2' - 4 3/4" 2' - 4" 2' - 4"
/4
/4
/4
/8
/4
W12X14 (E)
W12X14 (E)
W
X
E
W
X
E
W12X14 (E)
W12X14 (E)
W
X
E
W
X
E
13' - 10"
1' - 0" 11' - 10" 1' - 0"
W
X
W
X
/4
W
X
W
X
W
X
W
X
W12X26
W12X26
/4
/4
/4
R E
M O
V E
R E
M O
V E
R E
M O
V E
R E
M O
V E
REMOVE
REMOVE
ALL EXISTING PEDESTALS
TO REMAIN
REMOVEREMOVE
REMOVE
REMOVE
R E
M O
V E
R E
M O
V E
R E
M O
V E
R E
M O
V E
R E
M O
V E
R E
M O
V E
R E
M O
V E
R E
M O
V E
REMOVE
REMOVE
REMOVEREMOVE
REMOVE
REMOVE
R E
M O
V E
R E
M O
V E
R E
M O
V E
R E
M O
V E
/4
/4
/4
/8
/4
(U N
IT
O
V E
R A
L L
L E
N G
T H
(UNIT OVERALL WIDTH)
/4
S1.0
S1.0
S1.0
DENOTES BOLT
HOLE LOCATIONS
SEE MECH SHOP DWGS
EL. 0'-0"
0"
EL. +5'-4"
5' - 4"
PROPOSED COOLING TOWER,
OPERATING WEIGHT = 52 KIPS
EXISTING PEDESTALS AND
FOUNDATIONS TO REMAIN
EXISTING STEEL TO REMAIN
(SHOWN IN GRAY)
EXISTING TO BE REMOVED
(SHOWN IN PINK AND DASHED)
11' - 10"
DESIGN WIND
PRESSURE (ASD)
= +/- 38 PSF
EXISTING PEDESTALS AND
FOUNDATIONS TO REMAIN
EXISTING STEEL TO REMAIN
(SHOWN IN GRAY)
EXISTING TO BE REMOVED
(SHOWN IN PINK AND DASHED)
PROPOSED STEEL
(SHOWN IN RED)
COOLING TOWER NO SHOWN
FOR CLARITY
3/8"x6"x9" CONN PLATE
W/ (3)-3/4" DIA A325 BOLTS AND
2" HORIZ SLOTTED HOLES
6"
/2
/2
EXIST OR NEW STEEL
BEAM, SEE PLAN
EXIST OR NEW STEEL
BEAM, SEE PLAN
3/16
EXIST. CONC
PEDESTAL EXISTING
STEEL BEAM
EXISTING
STEEL BEAM
PROPOSED CONN.
SEE DETAIL
W12, SEE PLAN
FIELD VERIFY OR INSTALL
(2)-1/2" DIA EPOXY ANCHORS
AT EACH EXIST BEAM
(5" MIN EMBED)
ALL STRUCTURAL WORK FOR THIS PROJECT HAS BEEN ENGINEERED
IN ACCORDANCE WITH: THE FLORIDA BUILDING CODE, 2023 ASCE-7 22
"MINIMUM DESIGN LOADS FOR BUILDING AND OTHER STRUCTURES.
ALL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS AND
SPECIFICATIONS OF THESE CODES AND THEIR REFERENCED
STANDARDS, AND ALL OTHER APPLICABLE FEDERAL, STATE, AND
LOCAL CODES, STANDARDS, REGULATIONS AND LAWS.
THE GENERAL CONTRACTOR SHALL COORDINATE ALL
CONSTRUCTION SHOWN ON THE DRAWINGS WITH CIVIL,
ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING
DRAWINGS. ANY QUESTIONS OR DISCREPANCIES SHALL BE BROUGHT
TO THE ATTENTION OF THE ENGINEER OF RECORD BEFORE
STARTING CONSTRUCTION.
ALL STRUCTURAL WORK SHALL BE INSPECTED IN ACCORDANCE WITH
THE FLORIDA BUILDING CODE AND ALL LOCAL ORDINANCES. THE
OWNER SHALL ENGAGE AN EXPERIENCED, QUALIFIED INSPECTION
AGENCY, SUBJECT TO THE REVIEW BY THE ARCHITECT OR ENGINEER
TO PERFORM ALL INSPECTION WORK AS REQUIRED.
THE CONTRACTOR SHALL PROTECT ANY ADJACENT PROPERTY, HIS
OWN WORK AND THE PUBLIC FROM HARM. THE CONTRACTOR IS
SOLELY RESPONSIBLE FOR THE CONSTRUCTION MEANS AND
METHODS, AND JOB SITE SAFETY INCLUDING ALL OSHA
REQUIREMENTS.
DESIGN CRITERIA
DESIGN GRAVITY LOADS:
LOCATION LOAD
COOLING TOWER OPER. WT. 52,000 LBS
DESIGN WIND LOADS:
WIND SPEED: (3 SECOND GUST) V=160 MPH
RISK CATEGORY: CATEGORY III
EXPOSURE: C
MEAN ROOF HEIGHT: 23.5 FT.
INTERNAL PRESSURE COEFFICIENTS: N/A
ALL STRUCTURAL STEEL CONSTRUCTION, WORKMANSHIP AND
MATERIALS SHALL COMPLY WITH THE FOLLOWING CODES AND
STANDARDS:
AISC 360 (LATEST EDITION) "CODE OF STANDARD PRACTICE FOR STEEL
BUILDINGS & BRIDGES."
AISC "SPECIFICATIONS FOR THE DESIGN, FABRICATION AND ERECTION OF
STRUCTURAL STEEL FOR BUILDINGS" INCLUDING "COMMENTARY" AND
SUPPLEMENTS THERETO AS ISSUED.
AISC "SPECIFICATIONS FOR STRUCTURAL JOINTS USING ASTM A325 OR
A490 BOLTS."
AMERICAN WELDING SOCIETY (AWS) D1.1 "STRUCTURAL WELDING CODE"
ASTM A 6 "GENERAL REQUIREMENTS FOR DELIVERY OF ROLLED STEEL
PLATES, SHAPES, SHEET PILING AND BARS FOR STRUCTURAL USE."
ALL STRUCTURAL STEEL SHAPES AND FASTENERS SHALL CONFORM TO
THE FOLLOWING STANDARDS:
WIDE-FLANGE SHAPES ASTM A 992
CHANNELS, ANGLES ASTM A 36
MISCELLANEOUS, PLATES AND BARS ASTM A 36
ANCHOR BOLTS ASTM F 1554
HIGH-STRENGTH BOLTS ASTM A 325, 3/4" DIA.
ELECTRODES FOR WELDING SHALL COMPLY WITH AWS CODE
GALVANIZED STRUCTURAL STEEL:
STRUCTURAL SHAPES AND RODS ASTM A 123.
BOLTS, FASTENERS AND HARDWARE ASTM A 153.
ALL BOLTED CONNECTIONS SHALL USE ASTM A-325 BOLTS (N OR X).
ALL WELDING SHALL BE IN ACCORDANCE WITH THE WELDING CODE, AWS
D1.1 LATEST EDITION, OF THE AMERICAN WELDING SOCIETY.
ELECTRODES SHALL BE E70XX FOR MANUAL ARC WELDING AND F7X-EXXX
FOR SUBMERGED ARC WELDING.
ALL WELDING WORK MUST BE PERFORMED BY WELDERS WHO HAVE
SUCCESSFULLY PASSED AWS CERTIFICATION TESTS.
CUTS, HOLES AND COPING, ETC. REQUIRED FOR OTHER TRADES SHALL
BE SHOWN ON THE SHOP DRAWING AND MADE IN THE SHOP. CUTS OR
BURNING OF HOLES IN STRUCTURAL STEEL IN THE FIELD WILL NOT BE
PERMITTED.
ALL STEEL SHALL BE HOT DIPPED GALVANIZED (G60)
BOLT AND WELD TESTING:
ALL SHOP AND FIELD BOLTS SHALL BE TESTED PER AISC REQUIREMENTS.
SEE AISC DESIGN GUIDE 17 FOR ALL SNUG TIGHT CONNECTION REQMTS.
ALL WELDS SHOULD BE VISUALLY INSPECTED.
TEN PERCENT OF ALL WELDS AT BEAM AND GIRDER SHEAR
CONNECTIONS SHALL BE RANDOMLY INSPECTED BY MAGNETIC PARTICLE
METHOD, (ASTM E109) PERFORMED ON ROOT PASS AND ON FINISHED
WELD.
STRUCTURAL STEEL
THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE REVIEW OF
THE ARCHITECT AND ENGINEER.
SHOP DRAWINGS TO BE SUBMITTED FOR REVIEW ARE THE FOLLOWING:
(DO NOT SEND SHOP DRAWINGS NOT LISTED. THEY WILL BE RETURNED
UNREVIEWED).
FABRICATED STRUCTURAL STEEL
(FIELD MEASURE / VERIFY EXISTING CONDITIONS PRIOR TO SHOP DWGS)
SHOP DRAWINGS TO BE SUBMITTED SHALL PROVIDE COMPLETE
INFORMATION FOR THE PRODUCTS OR COMPONENTS TO BE SUPPLIED.
SUBMITTAL INFORMATION SHALL INCLUDE, BUT NOT BE LIMITED TO:
MEMBER SIZES AND DIMENSIONS;
GRADES OF MATERIAL FURNISHED;
MATERIAL PREPARATION REQUIRED;
MATERIAL FINISH AND MATERIAL COATINGS TO BE FURNISHED;
CUTS, COPES AND HOLES REQUIRED FOR OTHER TRADES;
END CONNECTIONS;
CAMBER AND OTHER DEVIATION FROM LINE;
SPECIAL ERECTION AND/OR INSTALLATION PROCEDURES INCLUDING
REQUIREMENTS FOR TEMPORARY STABILIZATION.
THE CONTRACTOR SHALL NOT DIRECTLY INCORPORATE THE
STRUCTURAL DRAWINGS, OR PORTIONS THEREOF, INTO SHOP DRAWINGS
OR ERECTION DRAWINGS TO BE SUBMITTED FOR THIS PROJECT.
THE REVIEW OF SHOP DRAWINGS AND OTHER SUBMITTALS FOR THIS
PROJECT IS FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT
AND FOR GENERAL COMPLIANCE WITH THE INFORMATION CONTAINED IN
THE CONTRACT DOCUMENTS. COMMENTS REGARDING THESE
SUBMITTALS DO NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
THE GENERAL CONTRACTOR SHALL REVIEW AND APPROVE SUBMITTALS
AND SHALL SIGN AND DATE EACH DRAWING PRIOR TO SUBMITTING TO
THE ARCHITECT.
SHOP DRAWINGS
THIS IS AND EXISTING BUILD AND MAJOR RENOVATION PROJECT.
ALL EXISTING STRUCTURAL CONDITIONS AND DETAILS WERE NOT
AVAILABLE OR VISIBLE DURING THE DESIGN PROCESS. THE
CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND DETAILS
SHOWN ON PLAN AND SHALL FIELD VERIFY WITH EXISTING CONDITIONS
AFTER DEMO IS COMPLETE.
ANY DIMENSIONS OR DETAILS DISCOVERED THAT DO NOT MATCH THOSE
SHOWN ON THESE PLANS SHALL BE BROUGHT TO THE ATTENTION OF
ADAMS ENGINEERING PRIOR TO STARTING WORK. REVISED DIMENSIONS
OR DETAILS TO MATCH THE EXISTING CONDITIONS WILL BE PROVIDED
AND INCORPORATED INTO THE CONTRACT DOCUMENTS.
IT IS RECOMMENDED THAT THE CONTRACTOR CARRY A LARGER THAN
NORMAL CONTINGENCY FOR THIS MAJOR RENOVATION . ADAMS
ENGINEERING IS NOT RESPONSIBLE FOR ADDITIONAL COSTS DUE TO
UNFORSEEN AND EXISTING CONDITIONS NOT KNOWN DURING THE
DESIGN PROCESS.
EXISTING CONDITIONS AND RENOVATIONS
ALL EPOXY ANCHORS SHALL BE "HILTI RE500 ADHESIVE SYSTEM WITH HAS
RODS" AS MANUFACTURED BY HILTI FASTENING SYSTEMS, INC. (OR
EQUAL).
THE SPACING, MINIMUM EMBEDMENT, AND INSTALLATION OF THE
ANCHORS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDED PROCEDURES.
CONCRETE ANCHORS (MECH. AND EPOXY)
T
HOMAS L . ADAM
S
P R
O F
E
S S
I ONA L ENG
I N E
E R
L I CENSE
F L O R I D A
STATE OF
No. 55343
CCOPYRIGHT STATEMENT
THESE DOCUMENTS AND THEIR CONTENTS ARE THE PROPERTY OF
ADAMS ENGINEERING INC. (AEI) AND ARE ISSUED ONLY FOR THE
SPECIFIC PROJECT NOTED ON THESE DOCUMENTS. ANY REVISIONS,
REPRODUCTIONS OR MODIFICATIONS OF THESE DOCUMENTS WITHOUT THE
EXPRESS WRITTEN CONSENT OF AEI IS PROHIBITED BY LAW.
R E
V
D A
T E
R E
V
IS
IO
N
D R
A W
IN
G
T
IT
L E
PROJ. NO. :
SCALE
DATE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ENGINEER OF RECORD
THOMAS L. ADAMS, PE
PE #55343
A D
A M
S E
N G
IN
E
E R
IN
G
I N
C
C O
N S
U L
T
IN
G S
T R
U C
T U
R A
L E
N G
IN
E
E R
S
S
P
A T
R
IC
K D
R
IV
E S
U
IT
E
I
N D
IA
N
H A
R B
O R
B E
A C
H
F L
O R
ID
A
C O
A
1-
-2
W W
W .A
S E
N G
R .C
O M
As indicated
P C
S B
B A
Y P
O
IN
T C
H
IL
L E
R R
E P
L A
C E
M E
N T
S T
P
E T
E R
S B
U R
G F
L O
R
ID
A
02-13-25
2024172
TA
JA
TA
S1.0
F R
A M
IN
G
P L A
N
1/4" = 1'-0" A
FRAMING PLAN
1/4" = 1'-0" C
DETAIL 1
B
STRUCTURAL 3D MODEL (STEEL)
3/4" = 1'-0"
DETAIL
3/4" = 1'-0"
DETAIL 2
MECHANICAL GENERAL NOTES
1. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. WHATEVER IS CALLED
FOR IN EITHER IS BINDING AS THOUGH CALLED FOR IN BOTH.
2. PIPE SIZE DIMENSIONS ARE IN INCHES UNLESS NOTED OTHERWISE.
3. THE EQUIPMENT SPECIFIED ON THE DRAWINGS HAVE BEEN SELECTED AS THE
BASIS OF DESIGN. THE USE OF REVIEWED OR SPECIFIED EQUALS SHALL BE
COORDINATED BY THE CONTRACTOR AS TO SPACE REQUIREMENTS, EQUIPMENT
DIMENSIONS AND PERFORMANCE. ANY ADDITIONAL COSTS EITHER DIRECTLY OR
INDIRECTLY CAUSED BY EQUALS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
4. DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL DESIGN INTENT,
ARRANGEMENT AND EXTENT OF SYSTEMS. DO NOT SCALE DRAWINGS NOR USE AS
SHOP DRAWINGS. WHERE ALTERNATE ROUTING, OFFSETS AND TRANSITIONS ARE
REQUIRED FOR FIELD COORDINATION OF ALL TRADES, THIS CONTRACTOR SHALL
MAKE CHANGES WITHOUT ADDITIONAL COSTS.
5. CONTRACTOR SHALL NOT SHUT-OFF/PUT OUT OF SERVICE ANY SYSTEMS/SERVICES
WITHOUT FIRST COORDINATING ALL DOWNTIME WITH OWNER'S PERSONNEL.
CONTRACTOR SHALL PROVIDE A DETAILED M.O.P. AS REQUIRED. DO NOT BEGIN
WORK WITHOUT WRITTEN APPROVAL.
6. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS UNLESS SPECIFICALLY DIRECTED OTHERWISE.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND INSTALLING SLEEVES,
INSERTS AND SUPPORTS AS REQUIRED FOR THIS SCOPE OF WORK AND/OR CORE
DRILL REQUIREMENTS. COORDINATE WITH GENERAL CONTRACTOR AND
STRUCTURAL ENGINEER.
8. CONTRACTOR SHALL CLOSELY COORDINATE NEW MECHANICAL WITH ALL NEW AND
EXISTING MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION,
ARCHITECTURAL AND STRUCTURAL MEMBERS. REFER TO DIVISION 23
SPECIFICATIONS FOR CEILING SPACE ALLOCATION PRIORITIES.
9. CONTRACTOR SHALL FIELD VERIFY ALL MECHANICAL ITEMS PRIOR TO SUBMITTING
A BID. NO ADDITIONAL COST WILL BE ALLOWED FOR CONTRACTOR'S FAILURE TO
BECOME FAMILIAR WITH ALL EXISTING CONDITIONS.
10. ALL MECHANICAL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE
CODES LISTED ON THIS SHEET AND THE ARCHITECTURAL CODE PLAN.
11. CONTRACTOR SHALL PROVIDE SUBMITTALS ON ITEMS LISTED IN THE MECHANICAL
SCHEDULES AND AS REQUIRED IN EACH SECTION OF SPECIFICATION TO THE
ENGINEER/OWNER FOR REVIEW PRIOR TO THE ORDER, PURCHASE OR
INSTALLATION OF THESE SAME ITEMS.
12. ALL EXISTING EQUIPMENT TO BE REMOVED SHALL HAVE ALL RELATED
HOUSEKEEPING PADS, PIPING, CONTROLS, GAUGES, ELECTRICAL SERVICE,
HANGERS, SUPPORTS AND ANY MISCELLANEOUS RELATED SERVICE OR PARTS
REMOVED COMPLETELY.
13. PROVIDE MANUAL AIR VENTS ON CLOSED SYSTEM WATER PIPING AT ALL CHANGES
IN ELEVATION DOWNWARD IN DIRECTION OF WATER FLOW.
14. CONTRACTOR SHALL CONSTRUCT AND INSTALL DUCTWORK ACCORDING TO
SMACNA STANDARDS AS A MINIMUM REQUIREMENT. REFER TO SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
15. PROVIDE REDLINE MARK-UPS FOR ANY FIELD CHANGES OR MODIFICATIONS ON THE
CONSTRUCTION DOCUMENTS. REDLINE DRAWINGS SHALL BE PROVIDED WHETHER
COORDINATION DRAWINGS ARE REQUIRED OR NOT.
16. EQUIPMENT E.E.R. AND/OR C.O.P. VALUES SHALL COMPLY WITH THE CURRENT
EDITION OF ASHRAE 90.1.
17. EXISTING EQUIPMENT AS NOTED ON THE DRAWINGS SHALL BE RETURNED TO THE
OWNER AT THEIR DESIGNATED LOCATION.
PROJECT NARRATIVE
THIS PROJECT INVOLVES REPLACING (1) CHILLER, (2) COOLING TOWER WITH (3)
COOLING TOWERS WITH THE SAME CAPACITY, (2) PRIMARY PUMPS, (2) CONDENSER
PUMPS, AND (3) SECONDARY PUMP ALONG WITH PROVIDING NEW VALVES AND
STRAINERS AT THE PUMPS. IT IS ALSO TASKED TO REPLACE THE EXISTING AIR
SEPERATOR AND EXPANSION TANK. A NEW REFRIGERANT DETECTION SYSTEM WILL BE
ADDED TO THE SPACE FOR THE NEW CHILLER THAT USES REFRIGERANT TYPE R-513A.
ALL SYMBOLS IN LEGEND MAY NOT NECESSARILY BE USED ON THIS PROJECT
H
T
TYP
(E)
(R)
(N)
DIA, D, Ø
EL.CL
AFF
AP
MANUAL VOLUME DAMPER
MOTORIZED DAMPER
MVD
MD
MIXED AIR
INVERT ELEVATION
MA
I.E.
EA
OUTSIDE AIR
RELIEF AIR
RETURN AIR
NIC
RA
REL
NORMALLY OPEN
NOT IN CONTRACT
NORMALLY CLOSED
OA
NC
NO
SUPPLY ROUND DUCT UP
AIR FLOW - POSITIVE
PRESSURE
AIR FLOW DIRECTION
RELOCATED
NEW
EXISTING
TYPICAL
UNIT MOUNTED THERMOSTAT
HUMIDISTAT
M
BD
VANED ELBOW
LINEAR SLOT DIFFUSER
WALL MOUNTED THERMOSTAT
N - INDICATES NIGHT
S - INDICATES SENSOR
FLEXIBLE DUCT
CONNECTION
MOTORIZED DAMPER
MOTOR
MANUAL VOLUME DAMPER
DOOR UNDERCUT
ACCESS PANEL
BACKDRAFT DAMPER
SUPPLY AIR DIFFUSER
RADIUS ELBOW
UC
TCOAD
TCEAD
VENT THROUGH ROOFVTR
S
FS
RETURN DUCT UP
EXHAUST DUCT UP
AIR FLOW DIRECTION ARROW
FLOW SWITCH
FLOW TRANSMITTER
FS
HUMIDITY SENSOR
PRESSURE DIFFERENTIAL
TRANSMITTER
POSITION INDICATOR
PRESSURE DIFFERENTIAL
SWITCH
PRESSURE SWITCH LOW
PRESSURE SWITCH HIGH
TEMPERATURE SWITCH LOW
TEMPERATURE SWITCH HIGH
TEMPERATURE SENSOR
MANUAL SWITCH
PRESSURE SENSOR
STATIC PRESSURE SENSOR
SENSOR
CO CARBON MONOXIDE SENSOR
N
AQUASTAT
PRESSURE SWITCH
PRESSURE INDICATOR
PS
INDICATOR LIGHT
CD
(F) FUTURE
SUPPLY ROUND DUCT DOWN
RETURN DUCT DOWN
EXHAUST DUCT DOWN
SUPPLY DUCT DOWN
BOD
BOP
UNO UNLESS NOTED OTHERWISE
UNIT HEATER
BASEBOARD HEATER
SOUND ATTENUATOR
ABOVE FINISHED FLOOR
ACCESS PANEL
BOTTOM OF DUCT
BOTTOM OF PIPE
CENTER LINE ELEVATION
DIAMETER
EXHAUST AIR
DIRECTION OF VIEW
SHEET ON WHICH
SECTION IS LOCATED
BOX ##__
HEATING COIL
CONTROL/COIL
ACCESS
INDICATES SUPPLY
AND RETURN
PIPING TO UNIT
EQUIPMENT
TERMINAL
OR VAV BOX
CFM
GPM
TB-103
1.2
POINT OF CONNECTION
NEW TO EXISTING
DUCT SMOKE DETECTORS
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
VFD
MOTOR STARTER
VARIABLE FREQUENCY DRIVE
DM DAMPER ACTUATOR
HUMIDIFIER
CURRENT SENSOR
HORN
FLOW SWITCH
DIRECTION OF CUT
SECTION
DESIGNATION
TCRAD
RETURN OR EXHAUST
REGISTER/GRILLE
UNSHADED AREAS
INDICATE DIRECTION OF
AIR FLOW (IF NO SHADING,
4-WAY OR ADJUSTABLE)
AIR FLOW - RETURN
OR EXHAUST
TEMPERATURE CONTROL
EXHAUST AIR DAMPER
TEMPERATURE CONTROL
OUTSIDE AIR DAMPER
TEMPERATURE CONTROL
RETURN AIR DAMPER
EQUIPMENT TYPE
FLOOR #__
IF MULTIPLE
TRANSITION TO
SIZE ON PLANS
CONTROL
ENCLOSURE
FIRE/SMOKE DAMPER (#
REFERS TO SCHEDULE)
FIRE DAMPER
SMOKE DAMPER
CEILING AIR DEVICE
WITH FIRE DAMPER
CARBON DIOXIDE SENSOR
WORK NOTE SYMBOL
REVISION SYMBOL
AND CLOUD
RETURN ROUND DUCT UP
RETURN ROUND DUCT DOWN
X#
X-##
SHEET ON WHICH
ELEVATION IS LOCATED
F
F
S DUCT SMOKE DETECTOR
H
ELEVATION
DESIGNATION
EXHAUST ROUND DUCT UP
EXHAUST ROUND DUCT DOWN
SUPPLY DUCT UP
STEAM TRAP
TEMPERATURE GAUGE
HOSE END BALL VALVE W/ CAP
VACUUM BREAKER
WELL
PRESSURE/TEMPERATURE TAP
AUTOMATIC AIR VENT
PRESSURE GAUGE W/ COCK
TEMPERATURE/PRESSURE
RELIEF VALVE
GAUGE W/ PIGTAIL
MANUAL AIR VENT
CONDENSATE DRAIN
CDW CONDENSER WATER
(COMMON)
CS CONDENSER WATER SUPPLY
CR CONDENSER WATER RETURN
CWS CHILLED WATER SUPPLY
CWR CHILLED WATER RETURN
D DRAIN
HWS HEATING WATER SUPPLY
HWR HEATING WATER RETURN
HRS HEAT RECOVERY SUPPLY
HRR HEAT RECOVERY RETURN
HPS HIGH PRESSURE STEAM
HPR HIGH PRESSURE STEAM
(CONDENSATE) RETURN
LPS LOW PRESSURE STEAM
LPR LOW PRESSURE STEAM
(CONDENSATE) RETURN
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE STEAM
(CONDENSATE) RETURN
PWS PRE-COOLING WATER SUPPLY
PWR PRE-COOLING WATER RETURN
NP NON-POTABLE WATER
CW POTABLE COLD WATER
SCW SOFT COLD WATER
ARROW PARALLEL TO LINE
INDICATES PITCH
ARROW IN LINE INDICATES
DIRCTION OF FLOW
ELBOW UP
ELBOW DOWN
TEE UP
TEE DOWN
RISE OR DROP
BRANCH SIDE CONNECTION
BRANCH TOP CONNECTION
BRANCH BOTTOM
CONNECTION
PIPE CAP OR PLUG
BALL VALVE
G GAS
CALIBRATED BALANCE VALVE
PLUG VALVE
NEEDLE VALVE
SOLENOID VALVE
PRESSURE REDUCING VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
CHECK VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALANCING VALVE
CIRCUIT SETTER
GATE VALVE FOR STEAM
UNION
PIPE ANCHOR
PIPE ALIGNMENT GUIDE
FLEXIBLE CONNECTION
EXPANSION JOINT
GAS PRESSURE REGULATOR
GAS COCK
IN-LINE PUMP
BASE MOUNTED PUMP
STRAINER
STRAINER W/BLOWOFF VALVE
2-WAY VALVE
PRESSURE INDEPENDENT
VALVE
VENTURI
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RHG REFRIGERANT HOT GAS
METER
BEVELED TAP OFF TOP
OF DUCT
FLEXIBLE DUCT
DUCT END CAP
ROUND 90° CONICAL TAKE OFF
FROM RECTANGLE TRUNK
RECTANGULAR 90° TAKEOFF
WITH BEVELED TAP
ROUND DUCT RISE/DROP
IN PLAN
RECTANGLE DUCT
RISE/DROP IN PLAN
ROUND DUCT TAP OFF
TOP OF DUCT
R
D
R
D
DETAIL NUMBER
SHEET ON WHICH
DETAIL IS LOCATED
EXISTING WORK IS
SHOWN AS LIGHT LINES
TO BE DEMOLISHED WORK
IS SHOWN WITH BOLD
DASHED LINES
NEW WORK IS SHOWN AS
BOLD SOLID LINES
BREAK LINENORTH ARROW
N
BBD
BAROMETRIC
BACKDRAFT DAMPER
SUPPLY AIRSA
TCP
TEMPERATURE CONTROL
PANEL
BURIED, UNDERFLOOR
OR UNDER DUCT
ROUND 90° CONICAL TAKE OFF
W/ MANUAL VOLUME DAMPER
RECTANGLE TO ROUND
TRANSITION
FAN
FAN
CONTROL WIRE
SMS SNOWMELT SUPPLY
SMR SNOWMELT RETURN
FOS FUEL OIL SUPPLY
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
PIPE REDUCER
PIPE ANCHOR
PIPE ALIGNMENT GUIDE
EXPANSION LOOP
PUMP
CONTROL POINT#
ROOM PRESSURE
MONITOR
CONTINUANCE LINE
FT
H
P
PDS
PDT
PI
PSH
PSL
T
TSH
TSL
S
SP FS
CO2
PI
T
T
MS
CS
H
X-#
DPM
X-###
M
CONTROL DEVICES
PIPING DESIGNATIONS, FITTINGS AND EQUIPMENT
SHEET METAL FITTINGS AND EQUIPMENT
ABBREVIATIONS AND DESCRIPTIONS
MECHANICAL LEGEND
© Copyright BCER Engineering ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.
SHEET NO:
SHEET TITLE:
ISSUE RECORD:
© BCER Engineering Inc.
SCALE: NOT TO SCALE
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940 | 321.241.4142
CA# 9303
/7
/2
:3
:1
P M
C U s e rs \p k o s ia ra \D o c u m e n ts \1
-B a y P o in tE S
C h ill e rR e p la c e m e n t- M e c h -R p k o s ia ra B
C E
R .r v t
M0.1
DATE: 2/6/2025
DRAWN BY: KAG
CHECKED BY: SDB
MECHANICAL GENERAL
INFORMATION
B A
Y P
O
IN
T E
S /M
S C
H
IL
LE
R
R E
P
LA
C E
M E
N T
2n d S tr ee t S ou th
S t.
P et er sb ur g, F lo rid a
BCER PROJECT 132324002
DENVER AND COLORADO SPRINGS OFFICES
14143 DENVER WEST PKWY, SUITE 550
GOLDEN, CO 80401
303.422.7400
TAMPA BAY AND MELBOURNE OFFICES
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940
321.241.4142
PROJECT ENGINEER / DESIGNER PROJECT MANAGER
KYLE GARRISON
KGARRISON@BCER.COM
813.453.7314
MIKE CORDERO
MCORDERO@BCER.COM
727.800.7315
CONTACT LIST
DRAWING LIST - MECHANICAL
M0.1 MECHANICAL GENERAL INFORMATION
M0.2 MECHANICAL SCHEDULES
MD2.1 EXISTING CHILLER PLANT - MECHANICAL DEMOLITION PLAN
M2.1 CHILLER PLANT - NEW MECHANICAL PLAN
M5.1 MECHANICAL SCHEMATICS
M6.1 MECHANICAL DETAILS
TOTAL # OF SHEETS: 6
NFPA 70-2023, NATIONAL ELECTRICAL CODE
FLORIDA FIRE PREVENTION CODE, 8TH EDITION (2023)
2023FLORIDA MECHANICAL CODE
2023 FLORIDA PLUMBING CODE
2023 FLORIDA EXISTING BUILDING CODE
2023 FLORIDA BUILDING CODE
ADOPTED/ENFORCED CODES REQUIRED
NO: DESCRIPTION: DATE:
100% CD 02/05/2025
Permit 04/08/2025
4/7/2025
This item has been electronically signed and sealed by Michael Schroeder on the date adjacent to the seal using a SHA authentication code.
Printed copies of this document are not considered signed and the SHA authentication code must be verified on any electronic copies.
© Copyright BCER Engineering ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.
SHEET NO:
SHEET TITLE:
ISSUE RECORD:
© BCER Engineering Inc.
SCALE: NOT TO SCALE
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940 | 321.241.4142
CA# 9303
/7
/2
:3
:1
P M
C U s e rs \p k o s ia ra \D o c u m e n ts \1
-B a y P o in tE S
C h ill e rR e p la c e m e n t- M e c h -R p k o s ia ra B
C E
R .r v t
M0.2
DATE: 2/6/2025
DRAWN BY: KAG
CHECKED BY: SDB
MECHANICAL
SCHEDULES
B A
Y P
O
IN
T E
S /M
S C
H
IL
LE
R
R E
P
LA
C E
M E
N T
2n d S tr ee t S ou th
S t.
P et er sb ur g, F lo rid a
BCER PROJECT 132324002
PUMP SCHEDULE
PLAN CODE MFR. MODEL
INSTALLED
SERVICE LOCATION PUMP TYPE GPM HEAD FT. EFF %
APPROX.
IMP. DIA.
SUCTION
DIA.
DISCHARGE
DIA.
% OF
PROPYLENE
GLYCOL
H.P. RPM
ELEC.
VOLT/PH.
NOTES
MFR. MODEL
CP-1 B & G E-1510 8GB
COOLING
TOWER
CHILLER
PLANT
CENTRIFUGAL 1380 44 76% 11.4 10 8 0 20 1749 460/3 (1) (2) (4)
CP-2 B & G E-1510 8GB
COOLING
TOWER
CHILLER
PLANT
CENTRIFUGAL 1380 44 76% 11.4 10 8 0 20 1749 460/3 (1) (2) (4)
PCHP-1 B & G E-1510 8GB CHILLERS
CHILLER
PLANT
CENTRIFUGAL 1105 38.9 70% 10.5 10 8 0 20 1180 460/3 (1) (2) (4) (5)
PCHP-2 B & G E-1510 8GB CHILLERS
CHILLER
PLANT
CENTRIFUGAL 1105 38.9 70% 10.5 10 8 0 20 1180 460/3 (1) (2) (4) (5)
SCHP-1 B & G E-1510 5E FACILITY
CHILLER
PLANT
CENTRIFUGAL 990 90 87% 11 6 5 0 40 1668 460/3 (2) (3) (4) (6)
SCHP-2 B & G E-1510 5E FACILITY
CHILLER
PLANT
CENTRIFUGAL 990 90 87% 11 6 5 0 40 1668 460/3 (2) (3) (4) (6)
SCHP-3 B & G E-1510 5E FACILITY
CHILLER
PLANT
CENTRIFUGAL 990 90 87% 11 6 5 0 40 1668 460/3 (2) (3) (4) (6)
6. ADD ALTERNATE #2: PROVIDE NEW PUMP. REFER TO M2.1 FOR MORE INFORMATION.
5. ADD ALTERNATE #1: PROVIDE NEW PUMP. REFER TO M2.1 FOR MORE INFORMATION.
4. PROVIDE PUMP WITH TEFC MOTOR.
3. PROVIDE INVERTER DUTY RATED MOTOR. PUMP SHALL BE VARIABLE SPEED AND POWERED BY EXISTING VFDs.
2. PUMP SHALL BE BASE MOUNT END SUCTION STYLE PUMPS.
1. PUMP SHALL OPERATE AT CONSTANT SPEED. RECONNECT PUMP TO EXISTING MOTOR STARTER
PUMP SCHEDULE PROJECT SPECIFIC NOTES
CENTRIFUGAL CHILLER SCHEDULE
PLAN CODE MFR. MODEL
INSTALLED DESIGN
CAP. TONS
OUTPUT
REFRIG.
TYPE
REFRIG.
CHARGE
(LBS)
C.O.P.
CHILLED WATER DATA CONDENSER WATER DATA
MAX.
KW/TON
ELEC. INFO OPERATING
WEIGHT
(LBS.)
NOTES
MFR. MODEL
EWT
(°F)
LWT
(°F)
GPM
MIN.
GPM
GLYCOL
P.D. FT.
W.C.
NO.
PASSES
EWT
(°F)
LWT
(°F)
GPM
MIN.
GPM
P.D. FT.
W.C.
NO.
PASSES
MCA MOCP VOLT/PH.
CH-3 CARRIER 19MVR 460 R-513A 1618 0.52 55 45 1080 630 0 16 2 95 85 1350 555 24 2 0.53 411 700 480/3 23300 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
10. CHILLER IS OWNER FURNISHED AND CONTRACTOR INSTALLED. CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL ACCESSORIES AND COMPONENTS NECESSARY TO PROVIDE A FULLY FUNCTIONING CHILLER PLANT.
9. THE EXISTING CHILLER TO BE REPLACED IS BLOCKED FROM ACCESS BY THE ADJACENT EXISTING CHILLER TO REMAIN. IF DISASSEMBLY AND REASSEMBLY IS REQUIRED TO INSTALL THE NEW CHILLER, INCLUDE PRICING FOR ALL NECESSARY HARDWARE AND MANUFACTURER SUPPORT.
8. THE DISCONNECT/CONTROL CABINET FOR THIS PIECE OF EQUIPMENT MUST HAVE A MINIMUM WITHSTAND RATING OF 100hh KAIC BASED ON THE AVAILABLE FAULT CURRENT.
7. THE INTERFACE BETWEEN THE FACTORY CHILLER CONTROLS AND THE BAS MUST USE THE PROTOCOL USED BY THE BUILDING'S BAS. M.C. TO COORDINATE WITH T.C. CONTRACTOR.
6. CHILLER SHALL HAVE MINIMUM CAPACITY OF 15% OF RATED FULL CAPACITY.
5. PROVIDE MARINE BOX PIPING CONNECTIONS ON CHILLER. PIPE CONNECTION LOCATIONS SHALL BE AS INDICATED IN ATTACHED DIAGRAM.
4. CONDENSER WATER SYSTEM IS FILLED WITH WATER ONLY AND DOES NOT INCLUDE GLYCOL. SCHEDULED FLOW IS CALCULATED BASED ON THE EXISTING FLUID COMPOSITION AND COMPRESSOR HEAT GENERATED AT THE FULL LOAD CHILLER EFFICIENCY (kW/TON).
3. CHILLED WATER SYSTEM IS FILLED WITH WATER ONLY AND DOES NOT INCLUDE GLYCOL. SCHEDULED FLOW IS CALCULATED BASED ON THE EXISTING FLUID COMPOSITION.
2. MAXIMUM ALLOWABLE NON-STANDARD PART LOAD EFFICIENCY (NPLV) TESTED IN ACCORDANCE WITH AHRI 550/560
1. MAXIMUM ALLOWABLE FULL-LOAD EFFICIENCY TESTED IN ACCORDANCE WITH AHRI 550/560
CENTRIFUGAL CHILLER SCHEDULE PROJECT SPECIFIC NOTES
COOLING TOWER SCHEDULE
PLAN CODE MFR. MODEL
INSTALLED CONDENSER WATER AMBIENT AIR FAN / CELL
APPROX.
OPERATING WEIGHT
NOTES
MFR. MODEL
NO.
CELLS
°F EWT °F LWT
GPM (PER
CELL)
°F DB °F WB
H.P. PER
FAN
ELEC.
VOLT/PH.
FAN DIA.
(FT.)
FAN CFM
CT-1,2,3 EVAPCO 312-4M42 3 95 85 1350 94 80 30 480/3 10 322,400 51870 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
11. ONE TOWER WITH THREE (3) INDEPENDENT CELLS.
10. INTERNAL PIPING HEADER FACTORY INSTALLED FROM EXTERNAL FLANGED PIPE CONNECTION TO BASIN CONNECTIONS ON TOP OF TOWER.
9. FAN MOTOR SHALL BE LOCATED OUTSIDE MOIST AIR STREAM AND UTILIZE GEAR DRIVE IN LIEU OF BELTS.
8. INTEGRAL OR STANDALONE DISCONNECT AIC/SCCR SHALL MATCH THE AIC RATING OF THE PANELBOARD FEEDING THE EQUIPMENT, UNLESS OTHERWISE SPECIFIED IN THE ELECTRICAL DRAWINGS. IF INFORMATION IS NOT AVAILABLE, THE INTEGRAL OR STANDALONE DISCONNECT AIC/SCCR SHALL BE 65KAIC. THE VENDOR/CONTRACTOR SHALL REVIEW THE ELECTRICAL DRAWINGS DURING BID TIME.
7. PROVIDE INTERIOR DESTRIBUTION CHAMBER PIPING AND CONNECTION TO FILL HEADER; 10" FLANGED EXTERIOR PIPE INLET CONNECTION.
6. PROVIDE MANUAL MAKE-UP WATER MECHANICAL CONTROL SYSTEM WITH FLOAT VALVE.
5. PROVIDE 10" EQUALIZATION OUTLET AT BOTTOM OF EACH TOWER.
4. PROVIDE WITH EXTERNAL LUBRICATION LINES / ZERKS; DEPRESSED SIDE OUTLET SUMP CONNECTION.
3. PROVIDE VIBRATION LIMIT SWITCH TO SHUT DOWN FAN UPON SENSING EXCESSIVE VIBRATION.
2. PROVIDE WITH REMOTE VARIABLE FREQUENCY DRIVE (VFD) FOR EACH CELL WITH UNIT MOUNTED DISCONNECT ON EACH COOLING TOWER CELL. REFER TO PLAN VIEW FOR REMOTE VFD LOCATION.
1. PROVIDE WITH HANDRAIL, LADDER & SIDE ACCESS DOOR PLATFORM, 48" LONG LADDER EXTENSION, FAN DECK EXTENSION FOR ACCESS AROUND FAN CYLINDER. REFER TO SPECIFICATIONS.
COOLING TOWER SCHEDULE PROJECT SPECIFIC NOTES
EXPANSION TANK SCHEDULE
PLAN CODE MFR. MODEL
INSTALLED
SYSTEM
CHARGE
PRESSURE
% GLYCOL
CAPACITY OPERATING
WEIGHT
(LBS.)
SYSTEM WATER
VOLUME (GAL.)
SYSTEM
GLYCOL
VOLUME (GAL.)
NOTES
MFR. MODEL
ACCEPT.
VOLUME
TOTAL
VOLUME
ET-1 AMTROL AX-120(V) HYDRONIC 13 PSIG 0 34 68 530 5000 0 (2)
2. FLOOR MOUNTED TYPE.
1. SUSPENDED TYPE MOUNTING.
EXPANSION TANK SCHEDULE PROJECT SPECIFIC NOTES
AIR SEPARATOR
PLAN CODE MFR. MODEL
INSTALLED
SERVICE GPM
PRESSURE DROP
(FT. OF HEAD)
PIPE
SIZE
NOTES
MFR. MODEL
AS-1 AMTROL 12-AS HYRDRONIC 2475 1.2 10"
NO: DESCRIPTION: DATE:
100% CD 02/05/2025
Permit 04/08/2025
4/7/2025
M M M
V F
D V
F D
V F
D
CH-2 CH-1
ET-1
PCHP-2
CH-3
PCHP-1
(E )8
"C S
(E )8
"C R
(E)8"CWS
CP-3
CP-1
CP-2
(E)8"CWS
PCHP-3
(E )8
"C W
R
(E)8"CR
(E)8"CR
(E )8
"C W
R
(E )8
"C S
(E )8
"C W
S
(E)8"CR
(E )8
"C W
R
(E)8"CS
(E)8"CR
AS-1
(E )1
"C
W R(E
)6 "C
W S
(E )8
"C W
S (E
)1 "C
W S
(E )6
"C W
S (E
)8 "C
W S
(E)10"CWR
4" REFRIGERANT
RELIEF PIPING
TO EXTERIOR
BCU-1
(E)CHEMICAL
TREATMENT
STORAGE
(E)REFRIGERANT
MONITOR
(TYPE-R123)
(E)CHEMICAL
TREATMENT
CABINET
(E)CONTROL
PANEL
(E)EMERGENCY
EXHAUST FAN
CT-2 CT-1
22x16
8" BELOW GRADE
8" BELOW GRADE
8" BELOW GRADE
8" BELOW GRADE8" BELOW GRADE
4" OVERFLOW
2" DRAIN
2" MAKEUP
4" OVERFLOW
2" DRAIN
2" MAKEUP
SCHP-1
SCHP-2
SCHP-3
M1M1
M2
M2
M2
M3
M3
M7
M5
M6
M8
M8
M4
M4
GENERAL NOTES
1. CONTRACTOR SHALL COORDINATE ALL SHUTDOWNS WITH OWNER AND RECEIVE
APPROVAL PRIOR TO EXECUTION.
© Copyright BCER Engineering ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.
SHEET NO:
SHEET TITLE:
ISSUE RECORD:
© BCER Engineering Inc.
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940 | 321.241.4142
CA# 9303
SCALE: As indicated
/7
/2
:3
:2
P M
C U s e rs \p k o s ia ra \D o c u m e n ts \1
-B a y P o in tE S
C h ill e rR e p la c e m e n t- M e c h -R p k o s ia ra B
C E
R .r v t
MD2.1
DATE: 2/6/2025
DRAWN BY: KAG
CHECKED BY: SDB
EXISTING CHILLER
PLANT - MECHANICAL
DEMOLITION PLAN
B A
Y P
O
IN
T E
S /M
S C
H
IL
LE
R
R E
P
LA
C E
M E
N T
2n d S tr ee t S ou th
S t.
P et er sb ur g, F lo rid a
BCER PROJECT 132324002
N
0 4'4' 2' 1/4" = 1'-0"
1 EXISTING CHILLER PLANT - MECHANICAL DEMOLITION PLAN
NO: DESCRIPTION: DATE:
100% CD 02/05/2025
Permit 04/08/2025
WORK NOTES
M1 BASE BID: EXISTING END SUCTION PUMP, VALVES, AND ACCESSORIES TO
REMAIN. ADD ALTERNATE #1: REMOVE EXISTING PRIMARY CHILLER PUMPS FOR
REPLACEMENT WITH NEW. REMOVE EXISTING VALVES, CHECK VALVES, AND
Y-STRAINERS.
M2 BASE BID: EXISTING END SUCTION PUMP, VALVES, AND ACCESSORIES TO
REMAIN. ADD ALTERNATE #2: REMOVE EXISTING SECONDARY CHILLER PUMPS
FOR REPLACEMENT WITH NEW. REMOVE EXISTING VALVES, CHECK VALVES,
AND Y-STRAINERS.
M3 REMOVE EXISTING END SUCTION CONDENSER WATER PUMPS FOR
REPLACEMENT WITH NEW.
M4 REMOVE EXISTING VALVES, CHECK VALVES, AND Y-STRAINERS.
M5 REMOVE EXISTING EXPANSION TANK, ET-1.
M6 REMOVE EXISTING AIR SEPARATOR, AS-1.
M7 REMOVE EXISTING CHILLER, CH-3.
M8 REMOVE EXISTING COOLING TOWER, FOR REPLACEMENT.
M M M
V F
D V
F D
V F
D
CH-3
VFDVFDVFD
GENERAL NOTES
1. 1. CONTRACTOR SHALL BE RESPONSIBLE FOR BECOMING FAMILIAR WITH THE
SPACE PRIOR TO ISSUING A BID.
2. TEST AND BALANCE SERVICES FOR THE CHILLER PRIMARY PUMPS AND THE
REFRIGERANT PURGE EXHAUST FAN ARE OWNER PROVIDED. CONTRACTOR SHALL
EXCLUDE THESE SERVICES.
3. NEW CHILLERS SHALL BE MOVED FROM THE PARKING AREA NORTH OF THE
CHILLER ROOM ALONG THE COVERED PEDESTRIAN PATHWAY TO THE WEST OF
THE CHILLER ROOM AND THROUGH THE MAN DOORS ON THE WEST SIDE.
4" REFRIGERANT
RELIEF PIPING
TO EXTERIOR
(E)CHEMICAL
TREATMENT
STORAGE
(E)REFRIGERANT
MONITOR
(TYPE-R123)
(E)CHEMICAL
TREATMENT
CABINET
(E)CONTROL
PANEL
(E)EMERGENCY
EXHAUST FAN
CH-2 CH-1
BCU-1 (E
)8
"C S
(E )8
"C R
(E)8"CWS(E)8"CWS
(E )8
"C W
R
(E)8"CR
(E)8"CR
(E )8
"C W
R
(E )8
"C S
(E )8
"C W
S
(E)8"CR
(E )8
"C W
R
(E)8"CS
(E)8"CR
(E )1
"C
W R(E
)6 "C
W S
(E )8
"C W
S (E
)1 "C
W S
(E )6
"C W
S (E
)8 "C
W S
(E)10"CWR
SCHP-1
SCHP-2
SCHP-3
PCHP-3
PCHP-1 PCHP-2
CP-3
CP-1
CP-2
AS-1
ET-1
CT-2 CT-3
16"CR 10"CR14"CR
16"CS 14"CS 10"CS
"C
S
8"CS
8"CS
8"CS
"C
R
M14
M16
M11
EXISTING 4" REFRIGERANT
RELIEF PIPING FOR CH-1 &
CH-2 TO EXTERIOR
"C
W R 8 "C
S
(E)8"CS
M13M13
10"CR10"CR
10" EQUILIZER PIPE
UNDER COOLING M18
M19 M19
ISOLATION VALVE
AND CONTROL VALVE
ON CR PIPE RISER
(TYP)
M20
M21
CT-1
M22
S
M12
M12
M23 M23 ISOLATION VALVE ON
CS PIPE RISER (TYP)
M9M9M9
M10
M10
M24
M25
M26
M27
M15
M15
M15
© Copyright BCER Engineering ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.
SHEET NO:
SHEET TITLE:
ISSUE RECORD:
© BCER Engineering Inc.
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940 | 321.241.4142
CA# 9303
SCALE: As indicated
/7
/2
:3
:2
P M
C U s e rs \p k o s ia ra \D o c u m e n ts \1
-B a y P o in tE S
C h ill e rR e p la c e m e n t- M e c h -R p k o s ia ra B
C E
R .r v t
M2.1
DATE: 2/6/2025
DRAWN BY: KAG
CHECKED BY: SDB
CHILLER PLANT - NEW
MECHANICAL PLAN
B A
Y P
O
IN
T E
S /M
S C
H
IL
LE
R
R E
P
LA
C E
M E
N T
2n d S tr ee t S ou th
S t.
P et er sb ur g, F lo rid a
BCER PROJECT 132324002
NO: DESCRIPTION: DATE:
100% CD 02/05/2025
Permit 04/08/2025
WORK NOTES
M9 PROVIDE NEW VFD MOUNTED IN ACCESSIBLE LOCATION ON WALL TO SERVE
NEW COOLING TOWER CELL. COORDINATE MANUFACTURER REQUIRED
CLEARANCES.
M10 PROVIDE NEW BASE MOUNTED CONDENSER WATER PUMPS TO REPLACE
REMOVED PUMPS. PROVIDE NEW VALVES, CHECK VALVES, AND Y-STRAINERS.
M11 COMPLETELY REMOVE EXISTING CONCRETE CHILLER HOUSEKEEPING
FOOTPADS. POUR NEW CONCRETE PADS TO ACCOMMODATE NEW CHILLER
MOUNTING DIMENSIONS. EACH PAD SHALL BE 4IN. TALL AND BE SIZED SUCH
THAT THE SIZE EXCEEDS THE FOOTPRINT OF THE CHILLER MOUNTING FLANGE
BY NOT LESS THAN 6IN. ON ALL SIDES. TYPICAL OF ALL CHILLER FOOTPADS.
M12 PROVIDE NEW REFRIGERANT 513A (PART#60-0542) SENSOR ON THE WALL NEAR
CH-3. ROUTE CONTROL WIRE FROM SENSOR TO THE EXISTING REFRIGERANT
MONITOR PANEL.
M13 BASE BID: EXISTING BASE MOUNTED PUMP TO REMAIN. ADD ALTERNATE #1:
PROVIDE NEW HORIZONTAL BASE MOUNTED PRIMARY PUMPS (PCHP-1 AND
PCHP-2) TO REPLACE THE EXISTING PUMPS.
M14 INSTALL NEW CENTRIFUGAL CHILLER, CH-3, ON EXISTING CONCRETE PAD.
CONNECT EXISTING CHILLED WATER SUPPLY PIPING AND EXISTING CHILLED
WATER RETURN PIPING TO NEW CHILLER. CONFIRM ALL REQUIRED
CLEARANCES PRIOR TO INSTALLATION.
M15 BASE BID: EXISTING BASE MOUNTED PUMP TO REMAIN. ADD ALTERNATE #2:
PROVIDE NEW HORIZONTAL BASE MOUNTED SECONDARY CHILLED WATER
PUMP (SCHP-1, SCHP-2, AND SCHP-3) TO REPLACE THE EXISTING PUMPS.
M16 EXISTING BUILDING AUTOMATION SYSTEM CONTROL PANEL TO REMAIN.
CONTRACTOR SHALL PROVIDE ALL CONTROLS NECESSARY TO INTEGRATE NEW
CHILLERS AND PUMPS INTO THE EXISTING BUILDING AUTOMATION SYSTEM
CONTROLS.
M18 NEW COOLING TOWERS SHALL REUSE EXISTING CONCRETE COOLING TOWER
SUPPORTS. NEW STRUCTURE SHALL BE PROVIDED TO SPAN THE EXISTING
PIERS TO ACCOMMODATE THE NEW COOLING TOWER FOOTPRINT. REFER TO
STRUCTURAL DRAWINGS FOR STRUCTURAL
M19 ROUTE NEW 2" CW PIPE, 3" OVERFLOW PIPE AND 3" DRAIN PIPE TO THE
EXISTING CW PIPE AND DRAIN PIPE UNDERNEATH THE NEW COOLING TOWER
M20 CONNECT NEW ET-1 TO EXISTING HYDRONIC PIPING.
M21 CONNECT NEW AS-1 TO EXISTING HYDRONIC PIPING.
M22 CHECK AND BALANCE THE EXISTING EXHAUST FAN TO OBTAIN THE NEW
AIRFLOW OF 4025 CFM. SHEAVE THE BELT DRIVE MOTOR IF NECESSARY TO
OBTAIN NECESSARY AIRFLOW.
M23 WATER LEVEL CONTROL IN COOLING TOWER IS CONTROLLED BY MANUAL
MECHANICAL BY FLOAT VALVE.
M24 PROVIDE CONDENSER WATER RETURN PIPING 10'-0" ABOVE GRADE, SUCH THAT
PIPING CAN BE SAFELY WALKED UNDER.
M25 PROVIDE NEW COOLING TOWER CONTROL PANEL IN ACCESSIBLE LOCATION ON
WALL TO SERVE NEW COOLING TOWER. PROVIDE MANUFACTURER REQUIRED
CLEARANCES.
M26 PROVIDE NEW 2"CW FROM EXISTING TO SERVE NEW CENTRAL COOLING
TOWER CELL. PROVIDE CONNECTION UPSTREAM OF EXISTING BACKFLOW
PREVENTION AND PRV DEVICES. PROVIDE NEW 2" BACKFLOW PREVENTER AND
PRV.
M27 PROVIDE NEW 4" DRAIN TO SERVE NEW COOLING TOWER CELL. CONNECT TO
EXISTING DRAIN UNDER ADJACENT CELL.
N
0 4'4' 2' 1/4" = 1'-0"
1 EXISTING CHILLER PLANT - MECHANICAL PLAN
(E) CH-1CH-3(E) CH-2
CP-3
CP-1
CP-2
CT-1 CT-2
CT-3
8" CR 8" CR
16" CR
8" CR
8" CR
8" CR
8" CR
14" CR 10" CR
16" CS
C S
8" CS
8" CS
C S
C S
C S
8" CS
8" CS
8" CS
8" CS
PCHP-1
PCHP-3
PCHP-2
C S
C S
C S
12" CWR
C W
R
10" CWR 10" CWR
C W
R
C W
R
C W
R
SCHP-1
SCHP-2
SCHP-3
10" CWS
8" CWS
8" CWS
8" CWS
C W
R
C W
S
C W
S
C W
S
C W
S
10" CWS 10" CWS
14" CS 10" CS
AS-1
ET-1
2" CW
C W
2" CW
C W
C W
2" CW
TO ELEMENTARY AND MIDDLE SCHOOL FACILITIES
C R
C R
C R
10" CS 10" CS
C O
N D
E N
S E
R
E V
A P
O R
A T
O R
10" CWR
C O
N D
E N
S E
R
E V
A P
O R
A T
O R
C O
N D
E N
S E
R
E V
A P
O R
A T
O R
4" D 4" D4" D
D
D
D
TO DRAINAGE
MAKE-UP
WATER
BUTTERFLY VALVE
CS AND CR PIPE
RISER (TYP)
(E) VFD
MSCS
1 2 3 4
5 6 7 8
9 10 11 12
(E) VFD
(E) VFD
PUMP SHALL UTILIZE
EXISTING STARTER.
EXISTING CONTROLS
TO REMAIN.
PUMP SHALL UTILIZE
EXISTING STARTER.
EXISTING CONTROLS
TO REMAIN.
13 14
MSCS
15 16
MSCS
17 18
10" EQUALIZING LINE 10" EQUALIZING LINE
CONTROL VALVE ON
CR PIPE RISER (TYP)
19 20 21 22
VFD
23 24 25 26
VFD
27 28 29 30
VFD
T 31
T 32
33 34 35
SEQUENCE OF OPERATION
Components Cooling Tower Cells: Three induced draft cells, each with a fan controlled by a variable frequency drive (VFD).
Condenser Water Pumps: Three centrifugal pumps, each piped in parallel with isolation valves and controlled by VFDs.
Temperature Sensors: Condenser water supply (CWS) and return (CWR) temperature sensors.
Flow Sensors: Flow meters on each pump and combined condenser water supply header.
Level Sensors: Basin water level sensors for each cooling tower cell.
Bypass Valve: A modulating valve used for low flow conditions or freeze protection.
Control Panel: BMS (Building Management System) providing automatic control and monitoring of the cooling tower and pump operation.
Note: The chiller condensers, cooling towers, and condenser water pumps all share a common condenser water pipe such that any combination of one chiller, one condenser water pump, and one cooling tower cell may run together. For simplicity, the following shall be the default interlocks:
CH-1, CWP-1, and CT-1 CH-2, CWP-2, and CT-2 CH-3, CWP-3, and CT-3 This interlock schedule may be automatically overridden due to equipment failure or manually by owner control.
Operating Modes
1. Standby Mode (No Cooling Demand) All cooling tower fans and pumps are off. All cooling tower cell control valves are closed.
Basin water level is maintained via mechanical make-up valves as needed.
2. Cooling Demand Mode (Normal Operation) Upon call for a chiller to start, the following operations shall be executed in sequence:
Open the cooling tower control valve.
Start one condenser water pump Upon proof of condenser water flow at chiller condenser, start the chiller.
The cooling tower fan shall initially be stopped. If the condenser water supply temperature setpoint cannot be satisfied with the cooling tower fan stopped, the cooling tower fan speed shall modulate to maintain the condenser water supply setpoint, 85°F (adj.).
3. Chiller Rotation and Lead/Lag Control If not already included in the existing BMS logic, the lead chiller shall be rotated periodically (weekly, or as defined by the owner) to ensure even wear.
During rotation, the next available chiller becomes the lead, and the previous lead chiller moves to lag position.
Chiller failure results in automatic switchover to the next available chiller and an alarm sent to the BMS.
4. Pump Rotation & Lead/Lag Control The lead pump shall be rotated periodically with the lead chiller.
During rotation, the default interlocks noted above shall dictate the lag pump (unless the pump is failed or locked out).
Pump failure or lockout results in automatic switchover to the next available pump (overriding the default interlock schedule) and an alarm sent to the BMS.
5. Cooling Tower Cell Rotation & Lead/Lag Control The lead cooling tower shall be rotated periodically with the lead chiller.
During rotation, the default interlocks noted above shall dictate the lag cooling tower (unless the cooling tower is failed or locked out).
Cooling tower failure or lockout results in automatic switchover to the next available cooling tower (overriding the default interlock schedule) and an alarm sent to the BMS.
6. Emergency Shutdown Upon activation of a chiller plant emergency stop signal (refrigerant monitor alarm or e-stop signal), all pumps and fans are stopped, and isolation valves are closed. Alarms are triggered, and manual reset is required to resume normal operation.
Alarming & Monitoring High and low temperature alarms for CWS and CWR.
Low flow alarm.
Pump failure and fan failure alarms.
Communication failure alarms.
Control Points Summary VFD Speed Control (Pumps & Fans) CT Control Valve Position Temperature Setpoints Pump and Fan Status Feedback
NOTE: THE EXISTING REFRIGERANT MONITOR SEQUENCE AND EXISTING EXHAUST FAN SEQUENCE SHALL REMAIN.
© Copyright BCER Engineering ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.
SHEET NO:
SHEET TITLE:
ISSUE RECORD:
© BCER Engineering Inc.
SCALE: NOT TO SCALE
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940 | 321.241.4142
CA# 9303
/7
/2
:3
:2
P M
C U s e rs \p k o s ia ra \D o c u m e n ts \1
-B a y P o in tE S
C h ill e rR e p la c e m e n t- M e c h -R p k o s ia ra B
C E
R .r v t
M5.1
DATE: 2/6/2025
DRAWN BY: KAG
CHECKED BY: SDB
MECHANICAL
SCHEMATICS
B A
Y P
O
IN
T E
S /M
S C
H
IL
LE
R
R E
P
LA
C E
M E
N T
2n d S tr ee t S ou th
S t.
P et er sb ur g, F lo rid a
BCER PROJECT 132324002
NOT TO SCALE
1 MECHANICAL FLOW DIAGRAM
COOLING TOWER SYSTEM POINTS LIST
P O
IN
T
I D
E N
T
IF
IE
R
N U
M B
E R
SYSTEM POINT DESCRIPTION P
O
IN
T
T Y
P E
B
I, A
I, B
O A
O
S H
O W
O N
S Y
S T
E M
G R
A F
H
IC
IN
C
L U
D E
D A
T A
I N
T R
E N
D L
O G
IN
C
L U
D E
D A
T A
I N
T R
E N
D G
R A
P H
A L A
R M
C O
N D
IT
IO
N S
NOTES
1 SCHP-1 STATUS - HOA/ALARM BI X X VIA BACNET
2 SCHP-1 STOP/START BO X VIA BACNET
3 SCHP-1 VFD SPEED AO X X X VIA BAS
4 SCHP-1 VFD POSITION FEEDBACK AI X X X VIA BACNET
5 SCHP-2 STATUS - HOA/ALARM BI X X VIA BACNET
6 SCHP-2 STOP/START BO X VIA BACNET
7 SCHP-2 VFD SPEED AO X X X VIA BAS
8 SCHP-2 VFD POSITION FEEDBACK AI X X X VIA BACNET
9 SCHP-3 STATUS - HOA/ALARM BI X X VIA BACNET
10 SCHP-3 STOP/START BO X VIA BACNET
11 SCHP-3 VFD SPEED AO X X X VIA BAS
12 SCHP-3 VFD POSITION FEEDBACK AI X X X VIA BACNET
13 CP-3 STATUS-CURRENT SENSOR BI X X
14 CP-3 STOP/START BO X
15 CP-1 STATUS-CURRENT SENSOR BI X X
16 CP-1 STOP/START BO X
17 CP-2 STATUS-CURRENT SENSOR BI X X
18 CP-2 STOP/START BO X
19 CT-1 FAN STATUS - HOA/ALARM BI X X VIA BACNET
20 CT-1 FAN STOP/START BO X VIA BACNET
21 CT-1 FAN VFD SPEED AO X X X VIA BAS
22 CT-1 FAN VFD POSITION FEEDBACK AI X X X VIA BACNET
23 CT-2 FAN STATUS - HOA/ALARM BI X X VIA BACNET
24 CT-2 FAN STOP/START BO X VIA BACNET
25 CT-2 FAN VFD SPEED AO X X X VIA BAS
26 CT-2 FAN VFD POSITION FEEDBACK AI X X X VIA BACNET
27 CT-3 FAN STATUS - HOA/ALARM BI X X VIA BACNET
28 CT-3 FAN STOP/START BO X VIA BACNET
29 CT-3 FAN VFD SPEED AO X X X VIA BAS
30 CT-3 FAN VFD POSITION FEEDBACK AI X X X VIA BACNET
31 CS TEMPERATURE AI X X X X
32 CR TEMPERATURE AI X X X X
33 CH-2 CONTROL VALVE BO X X
34 CH-3 CONTROL VALVE BO X X
35 CH-1 CONTROL VALVE BO X X
NO: DESCRIPTION: DATE:
100% CD 02/05/2025
DP
6" MIN.
BUTTERFLY VALVE (TYP.)
(ISOLATION DUTY)
CHECK VALVE
FILL PUMP BASE WITH
NON-SHRINK GROUT
LEVEL TO TOP
BASE MOUNTED
CENTRIFUGAL PUMP
SHIM PUMP BASE 1" ABOVE
PAD; BOLT PUMP BASE TO
PAD WHEN LEVEL
GUARD
FLEXIBLE PUMP
CONNECTION (TYP.)
DIFFERENTIAL PRESSURE
SWITCH FLOW INDICATOR
P&T (TYP.)CHEMICAL FEED
CONNECTION
(TYP. 2)
STRAINER WITH
BLOW OFF VALVE
SUPPORT PIPE FROM
HOUSEKEEPING PAD
EXISTING CONCRETE PAD TO BE
REUSED.
5 PIPE
DIA'S MIN.
VENTURI BALANCING
VALVE ASSEMBLY
EXISTING INLET
PIPING TO BE
REUSED.
EXISTING DISCHARGE
PIPING TO BE REUSED.
E X
IS
T
IN
G
W O
R K
N E
W
W
O R
K
E X
IS
T
IN
G
W O
R K
N E
W
W
O R
K
C W
S
C W
R
CONCRETE PAD
FLOOR
P/T (TYP.)
EVAPORATOR
CONDENSER
FLEX CONNECTION
(TYP)
(2)1" RELIEF VALVES
1" RELIEF VALVE
4"
ELEC.
PNL
ELEC.
PNL
VFD
TRANSFER VALVE
MAGNETIC
COMP & DRIVE
CONTROL PANEL
EXISTING 4" REFRIGERANT
RELIEF PIPING UP THRU
BUILDING WALL.
DRAIN
VALVE
C S
C R
3/4" DRAIN VALVE
W/ HOSE END
MARINE BOX (TYP)
FACTORY SUPPLIED
VIBRATION ISOLATOR
(TYP)
REFER TO PLAN VIEW
FOR CONNECTION TO
EXISTING
REFER TO PLAN VIEW
FOR CONNECTION TO
EXISTING
CONTROL
VALVE
REUSE EXISTING REFRIGERANT MONITOR PANEL. GENESIS INTERNATIONAL,
INC. SHERLOCK 204 SYSTEM. THE MONITOR SHALL BE INFRARED NON-
DISPERSIVE DETECTION TYPE FACTORY CALIBRATED FOR ALL SELECTED
REFRIGERANTS. THE MONITOR SHALL HAVE A SENSITIVITY OF +/1 PPM AT 77°F.
SAMPLING SHALL BE CONTINUOUS. MONITOR SHALL BE EQUIPPED WITH (2)
RELAYS, INDICATOR LIGHTS (FOR POWER, STATUS AND ALARM) AND A DIGITAL
READOUT.
PROVIDE CONTROL WIRING TO IR REFRIGERANT GAS DETECTION SENSOR.
REFER TO PLANS FOR IR SENSOR LOCATIONS.
PROVIDE KEYED SWITCHES FOR SILENCING THE ALARM. THE SWITCH SHALL
SILENCE THE AUDIBLE ALARM ONLY AND SHALL NOT HALT REFRIGERANT
EXHAUST FAN OPERATION. SWITCHES SHALL BE LABELED "REFRIGERANT
ALARM SILENCE". TWO SWITCHES SHALL BE PROVIDED. THE FIRST SHALL BE
LOCATED OUTSIDE THE CHILLER ROOM ON THE WEST EXTERIOR WALL
BETWEEN THE MAN DOORS. THE SECOND SHALL BE LOCATED IN THE
CORRIDOR OUTSIDE THE CHILLER ROOM ON THE EAST CHILLER ROOM WALL
DIRECTLY ADJACENT TO THE MAN DOOR.
WALL MOUNTED SIGN BELOW HORN/STROBE. PROVIDE PLASTIC MELAMINE
LAMINATE WHITE SIGN WITH RED LETTERING (MINIMUM 2" HIGH).
PROVIDE IDENTICAL SETUP (HORN/LIGHT/SIGN) INSIDE OF CHILLER ROOM AND
OUTSIDE OF EACH CHILLER ROOM DOOR.
PROVIDE SIGN ON DOOR: "DO NOT ENTER WHEN ALARM IS SOUNDING AND
STROBE IS LIT."
ALARM
REFRIGERANT R
E
F R
IG
E
R A
N T
A L A
R M
T O
B A
S
S P
IL
L A
L A
R M
T O
B A
S
M O
N
IT
O R
F A
U L T
T O
B A
S
DOORS
ROOMCHILLER
DOORS TO CHILLER ROOM
WALL
MOUNTED
ALARM LIGHT
AND
HORN(24VDC)
FROM BAS
WORK NOTES:
A. THE REFRIGERANT MONITOR SHALL BE SET TO ALARM AT A LEVEL OF
650 (ADJ.) PPM. THE LIGHTS AND HORNS SHALL ACTIVATE AND THE
VENTILATION SYSTEM SHALL GO TO HIGH SPEED UNTIL THE SYSTEM IS
MANUALLY RESET.
MONITOR ALARM SEQUENCE
2" CW UNDER
PLATFORM.
CT-1
LADDER
"C
S
"C
R
10" EQUALIZATION
PIPE WITH BFV
EXISTING TOWER
SUPPORTS TO BE
MODIFIED BY
STRUCTURAL;
REFER TO
STRUCTURAL
DRAWINGS
RAILING (TYP.)
DD
CT-2 CT-3
2" CW.
Ø C
S
16"Ø CS
Ø C
S
Ø C
S
Ø C
R
16"Ø CR
Ø C
R
Ø C
R
14"Ø CR 10"Ø CR
14"Ø CS 10"Ø CR
4" D ROUTED
UNDER CT
10" EQUALIZATION
PIPE WITH BFV
ISOLATION
VALVES
(TYP)
CONTROL
VALVE (TYP)
DP
WORK NOTES:
PROVIDE 1/2" DIA. ANCHOR BOLTS FOR PUMP BASE CONNECTION. EXTEND TO
FLOOR (THROUGH BASE PAD) TO ALLOW FOR SIESMIC CONSIDERATIONS.
PROVIDE 1/2" DIA. STEEL
ANCHOR RODS BETWEEN
BASE AND FLOOR
FILL PUMP BASE WITH NON-
SHRINK GROUT LEVEL TO TOP
BASE MOUNTED
CENTRIFUGAL PUMP
SHIM PUMP BASE 1" ABOVE
CONCRETE PAD; BOLT PUMP
BASE TO PAD WHEN LEVEL
GUARD
1/2" (TYP.)
BALL VALVE (TYP.)
P&T (TYP.)
DIFFERENTIAL PRESSURE
SWITCH FLOW INDICATOR
FLEXIBLE PUMP
CONNECTION (TYP.)
CHECK VALVE
BUTTERFLY VALVE (TYP.)
(ISOLATION DUTY)
6" MIN.
USE CONCENTRIC
REDUCER TO TRANSITION
FROM BRANCH PIPE SIZE
TO PUMP SUCTION SIZE
CHEMICAL FEED
CONNECTION (TYP. 2)
PRESSURE GAUGE WITH BALL
COCKS AT INLET AND
DISCHARGE OF PUMP AND
INLET TO SUCTION DIFFUSER
SUCTION DIFFUSER
SIZED TO MATCH PUMP
SUCTION DIAMETER
SUPPORT PIPE FROM
HOUSEKEEPING PAD
4" CONCRETE PAD BY G.C., M.C.
TO COORDINATE SIZE WITH G.C.
VENTURI BALANCING
VALVE ASSEMBLY
1 1
E X
IS
T
IN
G
W O
R K
N E
W
W
O R
K
E X
IS
T
IN
G
W O
R K
N E
W
W
O R
K
EXISTING DISCHARGE
PIPING TO BE REUSED
EXISTING INLET PIPING
TO BE REUSED
© Copyright BCER Engineering ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.
SHEET NO:
SHEET TITLE:
ISSUE RECORD:
© BCER Engineering Inc.
SCALE: NOT TO SCALE
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940 | 321.241.4142
CA# 9303
/7
/2
:3
:3
P M
C U s e rs \p k o s ia ra \D o c u m e n ts \1
-B a y P o in tE S
C h ill e rR e p la c e m e n t- M e c h -R p k o s ia ra B
C E
R .r v t
M6.1
DATE: 2/6/2025
DRAWN BY: KAG
CHECKED BY: SDB
MECHANICAL DETAILS
B A
Y P
O
IN
T E
S /M
S C
H
IL
LE
R
R E
P
LA
C E
M E
N T
2n d S tr ee t S ou th
S t.
P et er sb ur g, F lo rid a
BCER PROJECT 132324002
NOT TO SCALE
5 END SUCTION PUMP DETAIL > 2-1/2" W/O SUCTION DIFFUSER, FOR CT-1, CT-2, & CT-3
NOT TO SCALE
4 CENTRIFUGAL HIGH PRESSURE CHILLER
NOT TO SCALE
1 REFRIGERANT MONITOR DETAIL
NOT TO SCALE
3 COOLING TOWER ELEVATION/PLAN DETAIL
NOT TO SCALE
2 END SUCTION PUMP DETAIL > 2-1/2" W/ SUCTION DIFFUSER
NO: DESCRIPTION: DATE:
100% CD 02/05/2025
T
J
M A
X
P E
R N
E C
.8
(A
TOP OF OPERABLE DEVICE/HANDLE
TOP OF OPERABLE DEVICE/HANDLE
FINISHED FLOOR
NOTES:
1. DEVICES ABOVE DOORS SHALL BE CENTERED BETWEEN TOP OF DOOR
TRIM AND CEILING LINE.
2. MOUNTING HEIGHTS SHOWN ON ARCHITECTURAL ELEVATIONS SHALL
GOVERN OVER THOSE SHOWN ABOVE.
3. MOUNTING HEIGHTS SHALL BE COORDINATED WITH OTHER DEVICES,
ARCHITECT, AND BE COMPLIANT WITH ADA AND CODE REQUIREMENTS.
CENTER OF DEVICE
CENTER OF DEVICE
VFD
LC
ALL SYMBOLS IN LEGEND MAY NOT NECESSARILY BE USED ON THIS PROJECT
TO
60/3 40A
UP/DOWN SINGLE-POLE SWITCH
P LINE VOLTAGE PHOTOCELL
C
DUPLEX RECEPTACLE/
SWITCH COMBINATION
SIMPLEX RECEPTACLE
TC
TPUSH BUTTON
TIME CLOCK
THERMOSTAT (LINE VOLTAGE)
VFD
PB
CBJ JUNCTION BOX (WALL)
METER
VARIABLE-FREQUENCY
DRIVE
M
THERMAL OVERLOAD SWITCH
LP
EXOTHERMIC CONNECTION
VS
AS
V
A
AMMETER SELECTOR
SWITCH
VOLTMETER SELECTOR
SWITCH
AMMETER
FUSE AND SWITCH < 600V
FUSE < 600V
CIRCUIT BREAKER < 600V CAPACITOR
FUSE > 600V
CABLE TERMINATION
XX
OVERHEAD LINE
WORK NOTE SYMBOL
ROOM NUMBER
REVISION SYMBOL
E-5
M
L1
J
BATTERY
PAD MOUNTED
TRANSFORMER
#M*
T
GFP
J
4WG100
GROUNDING CONDUCTORG
EXTERNAL GROUNDING
BUS BAR
GROUND ROD
GROUNDING ELECTRODE
PATIENT GROUNDING
POINT
G
QUADPLEX RECEPTACLE
(CEILING)
DUPLEX RECEPTACLE SPLIT WIRED
DETAIL NUMBER
CURRENT
TRANSFORMER W/RATIO
POTENTIAL
TRANSFORMER W/RATIO
VOLTMETER
AUTOMATIC TRANSFER
SWITCH, # OF POLES
CONTACT NORMALLY OPEN
(N.O.)
CONTACT NORMALLY
CLOSED (N.C.)
APPROXIMATEAPPROX
MAXIMUM OVERCURRENT
PROTECTION
MOCP
JUNCTION BOXJB
NON-METALLICNM
ATS AUTOMATIC TRANSFER SWITCH
EC
(E)
C
AWG
ELECTRICAL CONTRACTOR
EXISTING
CONDUIT OR /C=CONDUCTOR
AMERICAN WIRE GAUGE
ARCH
AIC
AL
AFG
AHJ
AFF
+4'-6"
A/AMP
AMPERE INTERRUPTING CAPACITY
ALUMINUM
ARCHITECT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTHORITY HAVING JURISDICTION
MOUNTING HEIGHT AFF
AMPERE
GEN
IES
GC
FLA
G
GENERATOR
GROUND
GENERAL CONTRACTOR
FULL LOAD AMPS
(F)
FC
FF
F
EPO
EVSE
EOR
ENCL
ELEC
FUTURE
FOOTCANDLE
FUSE
FURNITURE FEED
ENGINEER OF RECORD
ELECTRIC VEHICLE
SUPPLY EQUIPMENT
EMERGENCY POWER OFF
ENCLOSURE
ELECTRICAL
LOH
MIN
LRA
LF
MLO
LED
LOCK ON HANDLE
LOCKED ROTOR AMPS
MINIMUM
LINEAR FOOT
LIGHT EMITTING DIODE
MAIN LUG ONLY
KVAR
KW
KVA
KCMIL
KV
K
IG
KILOVOLT-AMPERE REACTIVE
KILOVOLT-AMPERE
KILO (ONE-THOUSAND)
KILOVOLT
KILO CIRCULAR MILS
ISOLATED GROUND
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
RGS
NTS
OCPD
NIC
RIGID GALVANIZED STEEL
NOT IN CONTACT
NOT TO SCALE
OVERCURRENT PROTECTIVE
DEVICE
NEC
ø
NL
NA
MTS
N
MTD
NATIONAL ELECTRICAL CODE
NIGHT LIGHT
PHASE MANUAL TRANSFER SWITCH
NOT APPLICABLE
NEUTRAL
MOUNTED
SYM
TBD
SWBD
TO BE DETERMINED
SWITCHBOARD
SS
SPEC
SEC
SPD
RNC
SCA
RM
STAINLESS STEEL
SPECIFICATION
RIGID NONMETALLIC CONDUIT
SURGE-PROTECTIVE DEVICE
SECONDARY
SHORT CIRCUIT CURRENT
AVAILABLE
W
VFD
VDC
VAC
TECH
WATT OR WIRE
VARIABLE FREQUENCY DRIVE
VOLTS DIRECT CURRENT
VOLTS ALTERNATING CURRENT
AC ALTERNATING CURRENT
AT AMP TRIP
CB CIRCUIT BREAKER
EMT ELECTRIC METALLIC TUBING
GEC
GD
GROUNDING ELECTRODE
CONDUCTOR
GARBAGE DISPOSAL
LIGHTING CONTROL DEVICE
KILOWATT-HOURS
LCD
KWH
LIGHTING CONTROL PANELLCP
NORMALLY CLOSEDNC
AF AMP FRAME OR AMP FUSE
NORMALLY OPENNO
CENTER LINECL
STD STANDARD
SW SWITCH
ARC FAULT CIRCUIT INTERRUPTERAFCI
SWGR SWITCHGEAR
SEAL OFF
FEEDER BUS DUCT
6(C)18
UG
EXTENSION WHIP
OH
ILLUMINATING ENGINEERING
SOCIETY
INTERMEDIATE METAL CONDUIT
KILOWATT
ROOM
TECHNOLOGY
SYMMETRICAL
FEEDER SCHEDULE
SHEET ON WHICH DETAIL IS LOCATED
LIGHTING CONTACTOR
W/ NUMBER OF POLES
# = DEVICE TYPE
2 = DOUBLE-POLE SWITCH
3 = THREE-WAY SWITCH
4 = FOUR-WAY SWITCH
D = DIMMER SWITCH
K = KEY OPERATED SWITCH
P = PILOT LIGHT
T = TIMER
CC = CONTRACTOR CONTROL
GROUND FAULT CIRCUIT
INTERRUPTER RECEPTACLE
SPECIAL PURPOSE
RECEPTACLE (CEILING)
DUPLEX RECEPTACLE (CEILING)
DUPLEX RECEPTACLE (FLOOR)
MULTI-OUTLET ASSEMBLY
OR SURFACE RACEWAY
# = QUANTITY OF REC
* = SPACING IN INCHES OC
JUNCTION BOX (FLOOR)
PULL BOX
MANUAL MOTOR STARTER
DISCONNECT CIRCUIT BREAKER
AMP SIZE / #POLES
DISCONNECT SWITCH FUSED
AMP SIZE / #POLES
FUSE AMP SIZE
MOTOR STARTER OR
CONTACTOR
MOTOR STARTER/DISCONNECT
SWITCH COMBINATION
BRANCH CIRCUIT
PANELBOARD OR LCP
MDP, MCC, UPS OR OTHER
EQUIPMENT ENCLOSURE
CABLE TRAY WITH
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .