CCGA Main Campus Cooling Tower #1 Replacement
Awarded State & local contract opportunity Posted
- Solicitation number
- CCGA-2207
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 40101711 Centrifugal liquid chiller
- 40101837 Chimney
- 40101841 Air preheater
- 40101509 Ventilation spad
- 40101510 Ventilation tubing
- 40142705 Other metals forged pipe fitting
- 40101710 Reciprocating chiller
- 40101713 Absorption chiller
- 40101714 Absorption chiller heater
- 40101812 Divided exchangers
Show all 31
- 40101816 Kettle exchangers
- 40101820 Split exchangers
- 40101836 Shell and tube heat exchanger
- 40101838 Economizer
- 40101839 Baffle plate
- 40101506 Ventilation pipes
- 40101507 Spiral ventilation tubing
- 40101512 Ventilation tube fittings
- 40142702 Pipe fitting welded alloy/ss including clad
- 40142704 Pipe fitting welded other metals (eg.Cu,Ti)
- 40101712 Screw chiller
- 40101813 Double split exchangers
- 40101823 Two pass exchangers
- 40101835 Plate heat exchanger
- 40101840 Film heater
- 40101842 Ice melting device
- 40101606 Ventilation check
- 40142703 Pipe fitting welded carbon steel
- 40101817 One pass exchangers
- 40101508 Ventilation curtain
- 40101511 Ventilation tube hanger
- Point of contact
-
- Paul Melchor pmelchor@ccga.edu (912) 279-5833
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Board of Regents of the University System of Georgia (College of Coastal Georgia) solicited sealed bids for replacement of Cooling Tower #1 in the Central Energy Plant at the Brunswick main campus under project CCGA-2207, with bids due March 15, 2022. Addendum 1, issued March 1, 2022, restricted bidding to six pre-approved contractors: Air Conditioning Specialist, Air Management Systems, Comfort Systems USA, JM Clayton, Mock Plumbing & Mechanical, and Y-Delta. Bidders were required to acknowledge receipt of the addendum on their Bid Form or face disqualification.
The scope encompassed demolition of the existing Cooling Tower #1 and installation of a new cooling tower with associated HVAC equipment modifications, including modifications to the concrete basin, installation of isolation control valves, electrical disconnects, variable frequency drives, and circuit breaker upgrades. The work required reconnection of existing chilled water loops, heating water loops, and condenser water loops to the new tower, with new copper conductors and a 100-ampere, 3-phase non-fused disconnect switch on the line side of the new VFD.
The contractor was required to achieve Material Completion and Occupancy within 120 consecutive calendar days following issuance of a Proceed Order, with pre-commencement activities to be completed within 60 days of the contract's Effective Date. A bid bond of not less than five percent of the bid amount was required at submission; upon award, the contractor had to furnish both a Performance Bond and a Payment Bond, each equal to 100 percent of the Contract Sum.
Responsibility evaluation considered debarment status, prior terminations for cause, demonstrated cash flow with a Current Ratio of 1.0 or higher, Workers' Compensation Experience Modification Rate not exceeding an average of 1.2 over three years, and evidence of successful completion of prior public works projects. The mandatory pre-bid conference was held February 24, 2022. Air Management Systems was awarded the contract on July 5, 2022. The design professional was NBP Engineers, Inc.
Opportunity text
Replacement of #1 Cooling Tower in Central Plant at Brunswick campus.
Files
| File | Type | Posted |
|---|---|---|
| Bid Invitation | — | |
| Addendum 1 | — | |
| Award Information | — | |
| Bid Results | — | |
| Plans | — | |
| Project Manual | — | |
| Notice of Intent to Award | — |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity