Lambdin Hall chiller replacement
Open State & local contract opportunity Posted
- Solicitation number
- PE-57600-RFQ-2027-000000016
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- Point of contact
-
- Cindy McCard cindym@gordonstate.edu (678) 359-5054
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Board of Regents of the University System of Georgia is soliciting sealed bids on behalf of Gordon State College for replacement of the Lambdin Hall chiller in Barnesville, Georgia. A mandatory pre-bid meeting is set for November 12, 2026 at 10:00 a.m., and bids are due December 3, 2026 at 2:00 p.m. Eastern Time. Every contractor intending to bid must send a representative to the pre-bid, held in the Facilities conference room at 419 College Drive. Specifications call for use of Georgia-manufactured materials and Georgia citizens "when feasible" and compliance with the Georgia Security and Immigration Compliance Act.
Work replaces an existing air-cooled chiller with a Carrier 30RC air-cooled unit rated at 120 tons nominal. Scope includes demolition and new mechanical work in the first-floor mechanical yard and third-floor mechanical room, two redundant 70 GPM end-suction pumps with variable frequency drive controls, piping modifications, an expansion tank, and controls that interface with the existing Building Management System. Electrical work includes an 800-amp fused disconnect, an 800-amp three-phase breaker, and conduit routing. Testing and balancing of the modified chilled water system is required. Gordon State will occupy portions of the building throughout construction, so the contractor must coordinate to minimize operational conflicts. Alternate No. 1 prices one to two months of temporary chiller service. NBP Engineers, Inc. prepared the 100% construction documents dated October 29, 2026.
Award is lump sum to the lowest responsive and responsible bidder within budget. If all responsive bids exceed budget, the owner may reject them or negotiate with the lowest responsive and responsible bidder for cost reductions through project modifications. Responsibility review covers debarment status, termination history on public works contracts, a current ratio of 1.0 or higher, an Experience Modification Rate not exceeding an average of 1.2 over three years, and prior successful public works completion. Bids require a bid bond of not less than 5% of the bid amount, and performance and payment bonds at 100% of the contract sum are due before execution. Completion is required within 180 consecutive calendar days from the Proceed Order. Bids must remain open 35 days after opening. Written questions are due November 19, 2026, with responses and addenda posted by November 24, 2026. The contracting contact is Dale Heiring of NBP Engineers, Inc., at dheiring@nbpengineers.com or (478) 745-1691.
Opportunity text
Gordon State College is seeking bids from qualified contractors for the Chiller replacement at Lambdin Hall on GSC campus. Please see attached Invitation to Bid for more information. A mandatory pre-bid meeting will be held at the Facilities conference room, 419 College Dr. Barnesvillle, GA on Thursday, November 12, 2026, at 10:00 am. All contractors interested in submitting a bid must have a representative at this meeting. GSC Facilities building conference room is located in building number 5 on the attached campus map.
Files
| File | Type | Posted |
|---|---|---|
| Gordon State Map.pdf | ||
| GSC_Lambdin_Chiller_100_CD_NBP.pdf | ||
| Gordon State Lambdin Hall Chiller_Project Man.pdf | ||
| Invitation to Bid.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity