Asphalt Roadway Resurfacing and Rehabilitation
Open State & local contract opportunity Posted
- Solicitation number
- RFP 26-097
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 36075 Tile, Asphalt
- 37034 Milling Machines, Food
- 63012 Coatings, Protective, Asphalt Based (Also See Class 770-26)
- 63112 Coatings, Protective, Asphalt Based (Also See Class 770-26), Environmentally Certified Products
- 91319 Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal)
- 91327 Construction, Highway And Road
- 91336 Construction, Parking Lot And Alley
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 94065 Railroad Construction At Street Intersection (Including Maintenance And Repair)
- Point of contact
-
- Cathy Scott cscott@fortmyers.gov (239) 321-7235
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Fort Myers is requesting proposals for asphalt roadway resurfacing and rehabilitation services at multiple street locations throughout the city under RFP 26-097, with electronic submittals due November 2, 2026 at 2:00 p.m. EST. The City has established local vendor preference and Minority Business Enterprise policies applicable to this solicitation.
The scope encompasses five components: Package 1 (mill and replace asphalt resurfacing at six streets), Package 2 (mill and replace asphalt resurfacing at six streets), Package 3 (mill and replace asphalt resurfacing at six streets), an alternate bid for Package 3 using full depth reclamation (FDR) methodology, and a striping bid for roadway restriping at various locations. Restriping work must comply with FDOT standard plans and specifications, utilize FDOT-approved thermoplastic pavement markings with anti-slip mix and glass beads, and be performed between 9:00 p.m. and 6:00 a.m. All contractors must submit maintenance of traffic plans for City approval. All authorized work must be completed within four calendar months of the established start date.
Contractors must meet mandatory minimum qualifications: five years of continuous business operation, no arrears with the City, and disclosure of material litigation or disciplinary actions from the preceding five years. Insurance requirements include Commercial General Liability, Comprehensive Auto Liability, and Workers' Compensation. Contractors must comply with all applicable federal, state, and local laws, including background screening requirements and equal employment opportunity statutes.
Pricing is submitted on a lump sum basis for each package. The City establishes owner contingency fees of $75,000 for Package 1 and $62,500 for Packages 2, 3, and the FDR alternative. Evaluation criteria weight price at 45 points (38.1%), technical approach at 20 points (16.9%), project schedule and capacity at 25 points (21.2%), experience and past performance at 10 points (8.5%), Minority Business Enterprise policy compliance at 13 points (11%), and local vendor preference at 5 points (4.2%). A non-mandatory selection committee meeting is scheduled for November 6, 2026 at 10:00 a.m. at City Hall. The City reserves the right to award multiple contracts, reject all submittals, or cancel the solicitation at any time.
Opportunity text
The City of Fort Myers is seeking proposals from qualified contractors to provide roadway resurfacing and rehabilitation services at various locations throughout the City. The selected Contractor shall provide all labor, materials, equipment, supervision, coordination, and other resources necessary to successfully complete the required roadway improvements.
The work generally consists of the following:
Package 1 - Mill and Replace Asphalt Resurfacing
Package 2 - Mill and Replace Asphalt Paving Package 3 - Mill and Replace Asphalt Paving
Alternate - Full Depth Reclamation (FDR) Method Striping Bid - Repair Road Striping - Various Location (Attachment D)
Work is anticipated to begin following City Council approval and issuance of a Purchase Order or Notice to Proceed, as applicable. All authorized work shall be completed within four (4) months of the date established by the City.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity