Air conditioning replacement ¿ MCC room and administration building, pumpkinvine creek wpcp

Open State & local contract opportunity Posted

Solicitation number
PE-71050-NONST-2027-000000016
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Dallas, Georgia is soliciting competitive sealed bids from licensed mechanical contractors for design-build furnishing and installation of air conditioning equipment under Bid No. 2026-11, with a mandatory pre-bid site visit on December 3, 2026 and bids due January 7, 2027 at 11:00 a.m. Attendance at the site visit is a condition of bid responsiveness. Bidders must hold a current, valid Georgia Conditioned Air Contractor Class II (Non-restricted) license and EPA Section 608 certification for refrigerant work.

The project is divided into Part A, covering the MCC Room and Sludge Pump Building, and Part B, covering the Administration Building, and the City may award the parts together or separately. Part A furnishes two new Trane 10-ton units (one primary and one automatic-failover standby), one dehumidifier, and a positive-pressure filtered outside-air system. Part B furnishes two new Trane 5-ton rooftop heating/cooling units for Administration Building offices and laboratory as direct replacements, and each unit must return to service the same day it is taken out of service. Work at the Pumpkinvine Creek Water Pollution Control Plant, 1753 Old Cartersville Road, Dallas, Georgia, includes demolition and disposal, refrigerant recovery, building modifications, testing, balancing, training, and warranty.

The project is funded by the Enterprise Fund – Water/Sewer. The bid bond is 5% for bids exceeding $100,000, and the awardee furnishes a 100% performance bond and a 100% payment bond upon award. Before Notice to Proceed, the contractor must provide commercial general liability of $1 million per occurrence and $2 million aggregate, automobile liability of $1 million combined single limit, employer's liability of $500,000, and umbrella/excess liability of $1 million, naming the City as additional insured. Bids require a notarized Contractor Affidavit and Agreement demonstrating compliance with Georgia's Illegal Immigration Reform and Enforcement Act of 2011. Substantial Completion is due within 30 calendar days of Notice to Proceed and Final Completion within 45 calendar days, with liquidated damages of $500 per day for delays. Pricing must remain firm for the contract duration.

Award goes to the lowest responsive and responsible bidder. The City reserves the right to reject any or all bids, waive technicalities, split awards, and negotiate terms with the lowest responsive, responsible bidder. Questions go to Brandon Rakestraw, Public Works Director, at brakestraw@dallas-ga.gov or 770-443-8110 by December 31, 2026. Sealed bids in duplicate, marked with the Bid Number and Company Name, must be delivered to Dallas City Hall, 129 E. Memorial Drive, Dallas, Georgia 30132, and bids received late or at another location will not be considered.

Opportunity text

The City of Dallas is soliciting competitive sealed bids from qualified, licensed mechanical contractors for the design-build furnishing and installation of air conditioning equipment to complete the Air Conditioning Replacement ¿ MCC Room and Administration Building project at the Pumpkinvine Creek WPCP, funded by Enterprise Fund ¿ Water/Sewer. This solicitation is divided into Part A (MCC Room, Sludge Pump Building) and Part B (Administration Building); see Exhibit C, Section 2 for bidding and award structure. A mandatory pre-bid site visit will be held ¿ see Exhibit H, Section 6. Please visit Bids and RFPs | Dallas, GA (dallasga.gov). Bids should be typed or submitted in ink and returned in a sealed container marked on the outside with the Bid Number and Company Name. Bids will be received until 11:00am on Thursday, January 7, 2027, at the City of Dallas ¿ City Hall, 129 E. Memorial Dr., Dallas, Georgia 30132, at which time the bids will be publicly opened and read aloud. Bids received after the above date and time, or in any location other than Dallas City Hall, will not be considered. Attendance at the mandatory pre-bid site visit (Exhibit H, Section 6) is a condition of bid responsiveness. Questions regarding bids should be directed to Brandon Rakestraw, Public Works Director, at brakestraw@dallas-ga.gov or by calling 770-443-8110, no later than Thursday, December 31, 2026. Bids are legal and binding upon the bidder when submitted. All bids should be submitted in duplicate. The written bid documents supersede any prior verbal or written communications between the parties. An award will be made to the contractor submitting the lowest responsive and responsible bid.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors