Addendum 1 BDC25-24/25 Ichetucknee Springs State Park - Road Repair

Closed State & local contract opportunity Posted

Solicitation number
ITB-10752
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from vendor.myfloridamarketplace.com. Updated .

About this opportunity

The State of Florida, specifically the Department of Environmental Protection (DEP) through Leon County, is seeking a contractor for road repair work at Ichetucknee Springs State Park via Bid No. BDC25-24/25. The procurement encompasses comprehensive road and parking lot repair across multiple park sections, with a base bid focusing on the North-side drainage, parking lot, and pavement repair, and three additional alternates for repairs on the South, West, and East side roads and parking areas. Key deliverables include 1.5" asphalt milling, base and subgrade work, parking lot restriping, bumper stop replacement, and associated drainage improvements. Contractors must perform density testing in accordance with FDOT Standard Specifications sections 120, 200, and 300, and adhere to the project's geotechnical report guidelines. The bid was posted on October 25, 2024, with proposals due by November 5, 2024, and must be submitted to Laurinda Micheels, Contracts Specialist, at the Bureau of Design and Construction in Tallahassee.

The solicitation does not explicitly mention set-aside designations or specific restrictions for disadvantaged enterprises. Potential bidders will need to demonstrate technical capability in road repair, asphalt milling, base reconstruction, and drainage infrastructure work. While specific budget ranges are not disclosed in the addendum, the multi-phase approach with base bid and three alternates suggests potential project scalability and flexibility in funding. The project requires contractors to have expertise in state park infrastructure rehabilitation, familiarity with FDOT specifications, and the ability to perform precise road and parking lot reconstruction. Bidders must also be prepared to conduct comprehensive density testing and work within the parameters of the provided geotechnical report. Interested contractors will need to carefully review the full contract documents and submit a signed acknowledgment of the addendum with their bid package.

Opportunity text

October 25, 2024

NOTICE TO APPLICANTS

ADDENDUM NO. ONE (1)

Ichetucknee Springs State Park - Road Repair

DEP BID NO. BDC25-24/25

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________

Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

1. Question: How much of the asphalt needs to be removed?

Answer: 1.5" thickness across all areas indicated in the plans

2. Question: Is the intention to have the asphalt milled? If so, what is the asphalt thickness to be milled?

Answer: Yes, 1.5"

3. Question: If we are not re-working the base, why do we have to compact it?

Answer: It is not compacted on areas of milling.

4. Question: In detail 3, would the existing base need to be re-compacted if it is not disturbed?

Answer: No

5. Question: Is the base bid just for the North side entrance & parking area?

Answer: Yes

6. Question: Does the parking lot need to be restriped after paving?

Answer: Yes

7. Question: Do the bumper stops need to be replaced after paving?

Answer: Yes, new bumpers are required.

8. Question: Where are the pipe and headwall located?

Answer: Sheet C113, on the North side

9. Question: Which phase is this for?

Answer: There are no phases; there are base bid and alternates, as follows:

Base Bid: to repair the North-side drainage, associated parking lot, existing pavement, associated repair impacts from erosion, and improve aesthetics per the contract documents.

Alternate #1: to repair the South-side entrance road per the contract documents.

Alternate #2: to repair the West-side tram road and associated parking lot per the contract documents.

Alternate #3: to repair the East-side tram road and associated parking lot per the contract documents.

10. Question: Is this for paving the entire park or only some sections?

Answer: The base bid does call for paving of the North side. The alternates, if chosen, will dictate the other sections of the park's road to be paved.

11. Question: Is there any Drainage or pipe work associated with this?

Answer: Yes, see plans sheet C113.

12. Question: Will the broken asphalt at the North Station be required to be replaced?

Answer: Yes, see plans.

13. Question: How deep must the base work be replaced and will density be required to be achieved prior to paving?

Answer: Edge rebuild and pothole full depth will require base and subbase replacement. Yes, density testing is required - see note sheet G102, #55:

Contractor is responsible for all density testing. Base, subgrades, and asphalt shall be tested in accordance with FDOT Standard specifications sections 120, 200, and 300.

14. Question: What kind of base is there now?

Answer: See Geotech report.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Files

File Type Posted
Addendum 1 BDC25-24-25.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity