226-0318-02_Wynn Lake-Antioch-Lake Forest-Hancock
Closed State & local contract opportunity Posted
- Solicitation number
- PE-77075-NONST-2026-000000016
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 74501 Aggregate, Precoated
- 74502 Asphalt, Ac (Asphalt/Cement)
- 74504 Asphalt, Ac (With Latex/Polymer)
- 74505 Asphalt, Aggregates
- 74506 Asphalt, Cutback
- 74507 Asphalt, Cutback (With Latex/Polymer)
- 74508 Asphalt, Emulsified
- 74510 Asphalt, Emulsified (With Latex/Polymer)
- 74511 Asphalt, Pervious Hot Mix
- 74512 Asphalt, Oil
- UNSPSC codes
- Point of contact
-
- Julie Wofford jwofford@co.banks.ga.us (706) 677-6902
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Barrow County, in conjunction with the Georgia Department of Transportation, is procuring road resurfacing and maintenance services for a multi-route project encompassing approximately 5.48 miles of roadway across Wynn Lake Road (from Hudson River Bridge to Old Highway 441), Antioch Road, Lake Forest Drive, and Hancock Way. The scope of work includes patching, recycled asphalt concrete resurfacing, striping, and shoulder filling designed to restore and extend the service life of these roadway segments. The contractor must ensure compliance with Georgia Department of Transportation standards and industry best practices for asphalt resurfacing operations, with specific responsibilities including traffic control, dust management, work area restoration, proper curing and compaction of asphalt materials, and accurate application of pavement markings and edge lines for visibility and safety. The project was posted on February 17, 2026, with a proposal due date of March 18, 2026. Evaluation criteria emphasize material quality, application methods, and workmanship standards to ensure durable and safe road conditions, with completion of all work required within the specified contract period.
The procurement documents provided do not specify set-aside designations, disadvantaged enterprise restrictions, incumbent vendors, or existing infrastructure integration requirements. Similarly, the available documentation does not indicate the award value or budget range for this project. Interested contractors should consult the complete bid documents and any supplemental procurement notices issued by Barrow County or the Georgia Department of Transportation for additional details regarding eligibility requirements, bonding and insurance obligations, and specific bid submission procedures.
Opportunity text
Approximately 5.48 miles of patching, recycled asphaltic concrete resurfacing, striping, and shoulder filling on WYNN LAKE RD (HUDSON RIVER BRIDGE TO OLD 441 HIGHWAY), ANTIOCH RD, LAKE FOREST DR, and HANCOCK WAY.
Files
| File | Type | Posted |
|---|---|---|
| 226_0318_02.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity