102" Anacostia Trunk Sewer Rehabilitation Phase 2 - Progressive Design-Build

Closed State & local contract opportunity

Solicitation number
106580
State
Maryland
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The Washington Suburban Sanitary Commission (WSSC Water) is soliciting sealed proposals for Progressive Design-Build services to design and construct rehabilitation of the 102-Inch Anacostia Trunk Sewer Phase 2, with responses due June 23, 2026, at 2:00 p.m. via WSSC's eProcurement Portal. A 24.00% subcontracting goal for MBE and SLBE participation applies.

The scope encompasses approximately 6,620 linear feet of reinforced concrete sewer pipe extending from manhole 09012018J at WSSC's Anacostia Depot downstream to manhole 09012013J at the Anacostia Wastewater Pumping Station in Lower Anacostia, Prince George's County, Maryland. The work is structured in two stages: a Preliminary Stage (Study and Report Phase and Preliminary Technical Documents Phase to 70% design completion within 325 working days) and a Completion Stage (construction within 390 working days after owner approval of the binding Completion Stage Price). The Design-Builder must achieve a minimum 50-year life expectancy for the rehabilitated sewer while maintaining system capacity during construction. Deliverables include a Quality Assurance/Quality Control Plan, Risk Register, Safety Plan, Basis of Design Report with field investigation results and alternatives evaluation, 30% and 70% design plans with specifications and cost estimates, and permit documentation. The Design-Builder must develop a Guaranteed Maximum Price using open-book methods with detailed cost breakdowns by CSI Division and critical path method scheduling.

Minimum qualifications require both contractor and design firm to demonstrate five years of experience in large-diameter pipeline design, construction, and rehabilitation; completion of at least three sewer rehabilitation projects for 60-inch or larger pipes within the past ten years, with at least two in environmentally sensitive areas; and completion of at least one Progressive Design-Build project. The prime contractor must provide evidence of a maximum OSHA Recordable Incident Rate of 2.8 for each of the last three years. Key personnel must include a Design-Build Principal-in-Charge with ten years managing municipal utility contracts valued at $50 million or greater, and a Progressive Design Build Project Manager with five years of large-diameter sewer experience. All firms must be licensed to conduct business in Maryland.

The estimated contract value is $47,734,793.42 over a five-year base term; the Preliminary Stage Price comprises stipulated amounts plus $1 million in allowances for additional engineering services and preliminary field work. Liquidated damages are $2,390 per day for delays in achieving Substantial Completion or final completion during the Completion Stage. Performance and payment bonds are required at 100 percent of contract price, along with a prevailing wage bond equal to 100 percent of contract value. Insurance includes workers' compensation, commercial general liability with $2 million general aggregate, automobile liability of $1 million combined single limit, and professional liability of $1 million per claim and aggregate. Five percent retainage applies to Completion Stage progress payments under the Maryland Little Miller Act. Maryland prevailing wage requirements apply, with wage rates ranging from $25.25 hourly base (Laborer Group II) to $59.50 hourly base (Cement Mason) plus fringe benefits.

Evaluation criteria weight project approach at 35 percent, design-build team experience at 25 percent, key project team members' experience at 20 percent, project management at 15 percent, and price at 5 percent. A pre-bid meeting was held May 26, 2026, with 88 participants representing engineering firms and construction companies. Questions were due June 3, 2026. Technical proposals are limited to 100 single-sided pages, excluding resumes and exhibits. All vendors must register in WSSC's Supplier Portal System prior to proposal submission. The project is subject to Maryland Buy American Steel Act requirements and requires coordination with the U.S. Army Corps of Engineers, National Park Service, U.S. Fish and Wildlife Service, Maryland Department of the Environment, and local authorities for permitting.

Opportunity text

The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for 102" Anacostia Trunk Sewer Rehabilitation Phase 2 - Progressive Design-Build. Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Tuesday, June 23, 2026. Late responses will not be accepted.

The Washington Suburban Sanitary Commission (WSSC Water, WSSC, or the Commission) requests proposals from qualified Respondents (Firm, Design-Builder, or Progressive Design-Build (PDB) Team) for the performance of PDB services pertaining to the design and construction for the Rehabilitation of the 102-Inch Anacostia Trunk Sewer (ATS) (Phase II) located in Lower Anacostia, Prince George's County, Maryland. (Project)

Files

File Type Posted
102"_Anacostia_Trunk_Sewer_Rehabilitation_Phase_2_-_Progressive_Design-Build_(Addendum_#9_Revision).pdf PDF
106580_PreBid_Slidedeck_5.26.26.pdf PDF
102-Inch_Anacostia_Pre-Meeting_-_Attendance_report_5-26-26.pdf PDF
Draft_Agreement.pdf PDF
Special_Conditions_Construction_Prevailing_Wage.pdf PDF
WSSC_WW_Engineering_BOA_-_TO1_ATS_Condition_Assessment_Briefing.pdf PDF
WSSC_Anacostia_Trunk_Sewer_CA_Report_Appendices_DRAFT.pdf PDF
102_ATS_-_TM_-_Condition_Assessment.pdf PDF
Exhibit_C:_Table_C1.pdf PDF
Scope_of_Work.pdf PDF
Supplementary_Conditions.pdf PDF
General_Conditions.pdf PDF
WSSC_Anacostia_Trunk_Sewer_CA_Report_Appendices_DRAFT_2024-06-25.pdf PDF
102_ATS_-_TM_-_Condition_Assessment_040219.pdf PDF
01._RFP Template_102in_ATS_II-4.01.2026_(3).pdf PDF
Decision_Matrix.v2_2026-4-17.pdf PDF
Mid-Atlantic_Purchasing_Team_Intergovernmental_&_Cooperative_Purchasing_Clause.pdf PDF
PDB_Team_Qualifications_(2).pdf PDF
Part3-SupplementaryConditions-3.26.2026_(1).pdf PDF
Evaluation_Factors_(1).pdf PDF
Part6-Scope_of_Work-3.26.2026.pdf PDF
Pricing_Sheet_(2).pdf PDF
WSSC_WW_Engineering_BOA_-_TO1_ATS_Condition_Assessment_Briefing_2024-04-22_(1).pdf PDF
Evaluation_Team_(1).pdf PDF
Part1-Addl_Instructions-WSSC-4.21.26_(2).pdf PDF
Part2-GeneralConditions-3.26.2026_(1).pdf PDF
Part4-Agreement-3.26.2026_(1).pdf PDF
Table_C1-4.12.26_(1).pdf PDF
Show all 28

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors