Exhibit_C:_Table_C1.pdf

PDF 103 KB Posted

Attached to
102" Anacostia Trunk Sewer Rehabilitation Phase 2 - Progressive Design-Build
Solicitation number
106580
Issued by
Prince George's County, Maryland

About this file

This is a Salary Schedule exhibit (Exhibit C1) for the Washington Suburban Sanitary Commission (WSSC) in Maryland related to Contract No. CKMH8245A26 for the Rehabilitation of the 102-Inch Anacostia Trunk Sewer (Phase II). The document establishes the wage rates and labor categories applicable to contractors performing work on this Progressive Design-Build project located in Lower Anacostia, Prince George's County, Maryland. Sealed responses for the overall project were due via WSSC's eProcurement Portal by 2:00 pm on Tuesday, June 23, 2026. The salary schedule specifies minimum and maximum hourly rates for various labor categories and job classifications that will be binding throughout the project duration.

The exhibit requires authorized signature and certification that the wage rates presented are complete, current, and accurate as of the submission date, and that these rates are consistent with those charged to other clients for similar work. This salary schedule serves as a binding wage determination document for the contract, ensuring compliance with established prevailing wage requirements. The document does not include specific dollar amounts in the provided content, but establishes the framework for labor cost compensation across all job classifications utilized on the Anacostia Trunk Sewer rehabilitation project.

View the file

Other files

File Type Posted
102"_Anacostia_Trunk_Sewer_Rehabilitation_Phase_2_-_Progressive_Design-Build_(Addendum_#9_Revision).pdf PDF
106580_PreBid_Slidedeck_5.26.26.pdf PDF
102-Inch_Anacostia_Pre-Meeting_-_Attendance_report_5-26-26.pdf PDF
102_ATS_-_TM_-_Condition_Assessment.pdf PDF
Scope_of_Work.pdf PDF
Draft_Agreement.pdf PDF
WSSC_WW_Engineering_BOA_-_TO1_ATS_Condition_Assessment_Briefing.pdf PDF
Special_Conditions_Construction_Prevailing_Wage.pdf PDF
WSSC_Anacostia_Trunk_Sewer_CA_Report_Appendices_DRAFT.pdf PDF
Supplementary_Conditions.pdf PDF
General_Conditions.pdf PDF
WSSC_Anacostia_Trunk_Sewer_CA_Report_Appendices_DRAFT_2024-06-25.pdf PDF
102_ATS_-_TM_-_Condition_Assessment_040219.pdf PDF
Part4-Agreement-3.26.2026_(1).pdf PDF
PDB_Team_Qualifications_(2).pdf PDF
Part1-Addl_Instructions-WSSC-4.21.26_(2).pdf PDF
Pricing_Sheet_(2).pdf PDF
Part3-SupplementaryConditions-3.26.2026_(1).pdf PDF
Evaluation_Team_(1).pdf PDF
Table_C1-4.12.26_(1).pdf PDF
Part2-GeneralConditions-3.26.2026_(1).pdf PDF
Evaluation_Factors_(1).pdf PDF
Mid-Atlantic_Purchasing_Team_Intergovernmental_&_Cooperative_Purchasing_Clause.pdf PDF
#124841_102inch_Anacostia_Trunk_SR_PH2_Participation_Clark.pdf PDF
WSSC_WW_Engineering_BOA_-_TO1_ATS_Condition_Assessment_Briefing_2024-04-22_(1).pdf PDF
Part6-Scope_of_Work-3.26.2026.pdf PDF
01._RFP+Template_102in_ATS_II-4.01.2026_(3).pdf PDF
Decision_Matrix.v2_2026-4-17.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Confidential Name and Title

Exhibit C1

WSSC REHABILITATION OF THE 102-INCH ANACOSTIA TRUNK SEWER (PHASE II)

SALARY SCHEDULE - CONTRACT NO. CKMH8245A26

FIRM:

Labor Category/Job Classification Minimum Hourly Rate

Maximum Hourly Rate

I certify that the above wage rates are complete, current, and accurate as of the date submitted, and that the rates shown above are the same as the rates charged to other clients for similar work. These rates will be binding throughout the project.

Authorized Signature Date

Exhibit C1

File details come from the government source that posted it. Updated .