About this file
This is a Pricing Sheet (Exhibit C1) for a Progressive Design-Build (PDB) contract issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland for the Rehabilitation of the 102-Inch Anacostia Trunk Sewer (Phase II) located in Lower Anacostia, Prince George's County. The project requires design and construction services for the sewer rehabilitation. Sealed responses for this PDB project are due by 2:00 pm on Tuesday, June 23, 2026, via WSSC's eProcurement Portal. Late responses will not be accepted.
The pricing sheet establishes hourly fully loaded rates for a comprehensive range of labor categories and job classifications required for the design-build team, including design and engineering positions (Design-Build Principal-In-Charge, Design Build Project Manager, Project Engineer, Designer, Senior CADD Technician, CADD Operator, and Survey positions), construction management and field positions (Construction Manager, Preconstruction Manager, Onsite Field Superintendent, Construction Crew Foreman, Heavy Equipment Operator, and General Laborer), and support positions (Quality Control/Quality Assurance Manager, Safety Officer, Environmental Manager, Environmental Scientist, Permit Manager, Permit Coordinator, and Administrative Assistant). The sheet provides budgeted hours for each position along with a line item for direct costs covering 10,000 miles of mileage. A certification statement confirms that the wage rates are complete, current, and accurate as of submission date and consistent with rates charged to other clients for similar work, with rates binding throughout the project subject to escalation with approval.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Confidential
Exhibit C1 WSSC REHABILITATION OF THE 102-INCH Exhibit C1
ANACOSTIA TRUNK SEWER (PHASE II)
CATEGORY RATE SCHEDULE - CONTRACT NO. CKMH8245A26
Labor Category/Job Classification Number of Hours
Hourly Fully Loaded Rate Total Cost
Design-Build Principal – In-Charge 2,000 $
Design Build Project Manager 10,000 $
Construction Manager 8,000 $
Preconstruction Manager 2,500 $
Onsite Field Superintendent 8,000 $
Construction Crew Foreman 8,000 $
Heavy Equipment Operator 5,000 $
General Laborer 8,000 $
Quality Control/Quality Assurance Manager
3,000 $
Safety Officer 2,000 $
Design Manager 4,000 $
Project Engineer 2,500 $
Engineer 2,500 $
Environmental Manager 2,000 $
Environmental Scientist 2,000 $
Permit Manager 2,000 $
Permit Coordinator 2,000 $
Designer 2,500 $
Senior CADD Technician 1,500 $
CADD Operator 1,000 $
Survey Manager/Registered Surveyor 500 $
Survey Technician 500 $
Administrative Assistant 2,000 $
DIRECT COSTS
Mileage 10,000 miles $
PDB TEAM TOTAL EVALUATION COST $
I certify that the above wage rates are complete, current, and accurate as of the date submitted, and that the rates shown above are the same as the rates charged to other clients for similar work. These rates will be binding throughout the project, subject to escalation with approval, for all cost negotiations.
| Exhibit C1 |
| WSSC REHABILITATION OF THE 102-INCH Exhibit C1 |
File details come from the government source that posted it. Updated .