Z2DA--657-19-110JC, FCA Replace Windows Building 1
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C25521R0023
- Agency
- Veterans Integrated Service Network 15 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Saint Louis MO 63106 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks construction services to replace approximately 1,100 exterior windows in Building 1 at the John Cochran Veterans Affairs Medical Center in St. Louis, Missouri. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is procuring these services and will evaluate proposals based on relevant past performance, technical construction experience, qualifications of key staff, and safety and quality control plans. The contractor must complete a pre-construction risk assessment, provide a definitive project schedule, protect surfaces and items, coordinate with the VA resident engineer, and perform the work in accordance with all construction documents, applicable design standards and building codes. The period of performance is 730 calendar days from receipt of the notice to proceed. Proposals were due by January 14, 2021.
This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The primary NAICS code is 238140 with a PSC code of S206. The construction services have an estimated value between $5-10 million. Key requirements include demolishing the existing 1,100 windows, conducting hazardous material abatement, and installing a new energy efficient window system, while keeping the occupied medical facility in full operation throughout the project duration. The place of performance is the John Cochran Veterans Affairs Medical Center located at 915 North Grand Boulevard in St. Louis, Missouri 63106.
Notice text
5 versions
Update #5 · Latest ·
Amendment to Solicitation to provide EVALUATION FACTORS CRITERIA when submitting proposals. This portion did not upload during initial solicitation posting. Please read the submittal instructions and the evaluation factor criteria uploaded in this amendment. All proposals shall be hand delivered to our office in 3450 S. 4th St. Leavenworth, Ks 66048 and also emailed to timothy.fitzgerald@va.gov
PROPOSAL DUE DATE TO 01/14/2021.
For Full project description, see attached documents.
The Construction Firm shall provide construction services to fabricate new windows, remove existing window systems, install new window systems in Buildings 1. The Contractor shall abide by Construction Documents to meet applicable design standards and building codes. The Scope of Work for this project shall include, but not limited to, the following items and the necessary disciplines to accomplish these tasks:
- • The Contractor shall complete a Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient safety, public safety, security controls for physical and logical access, and environmental controls and limitations on vibrations, noise, and disruptions to operations and utilities.
- • The Contactor shall provide to the VA resident engineer a definitive project schedule consistent with information contained within the construction documents. The VA reserves the right to define work zone availability and the Contractor’s schedule will work in a collaborative fashion to ensure that the on-going operational needs of Building 1 within the work scope are not negatively affected in any way. The building will remain occupied during the duration of this project.
- • The Contractor remains responsible throughout the project life for protecting all surfaces and items, either VA owned or personal, from damage or destruction. The movement of items will not be allowed outside of the room of origin unless the Contractor accepts responsibility for storing said material at an offsite location at their cost.
- • The VA will perform Construction period services including periodic construction progress inspections, hazardous material abatement monitoring, final inspections and submittals.
- • The Contractor shall replace existing exterior windows with a new, energy efficient window system in Building 1. Coordination shall be made with the VA resident engineer to identify project schedule, logistics, physical security, confirmation of hours of operations and method of construction. The construction includes demolition, hazardous material abatement (Industrial Hygiene) and safety and infection control measures as required in the documents.
- • The project period of performance is 730 calendar days from receipt of Notice to Proceed.
Update #4 ·
Amendment to Solicitation to provide RFI answers and inlcude updated Wage Determination.
PROPOSAL DUE DATE TO 01/14/2021.
For Full project description, see attached documents.
The Construction Firm shall provide construction services to fabricate new windows, remove existing window systems, install new window systems in Buildings 1. The Contractor shall abide by Construction Documents to meet applicable design standards and building codes. The Scope of Work for this project shall include, but not limited to, the following items and the necessary disciplines to accomplish these tasks:
- • The Contractor shall complete a Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient safety, public safety, security controls for physical and logical access, and environmental controls and limitations on vibrations, noise, and disruptions to operations and utilities.
- • The Contactor shall provide to the VA resident engineer a definitive project schedule consistent with information contained within the construction documents. The VA reserves the right to define work zone availability and the Contractor’s schedule will work in a collaborative fashion to ensure that the on-going operational needs of Building 1 within the work scope are not negatively affected in any way. The building will remain occupied during the duration of this project.
- • The Contractor remains responsible throughout the project life for protecting all surfaces and items, either VA owned or personal, from damage or destruction. The movement of items will not be allowed outside of the room of origin unless the Contractor accepts responsibility for storing said material at an offsite location at their cost.
- • The VA will perform Construction period services including periodic construction progress inspections, hazardous material abatement monitoring, final inspections and submittals.
- • The Contractor shall replace existing exterior windows with a new, energy efficient window system in Building 1. Coordination shall be made with the VA resident engineer to identify project schedule, logistics, physical security, confirmation of hours of operations and method of construction. The construction includes demolition, hazardous material abatement (Industrial Hygiene) and safety and infection control measures as required in the documents.
- • The project period of performance is 730 calendar days from receipt of Notice to Proceed.
Update #3 ·
Amendment to solicitation to CHANGE PROPOSAL DUE DATE TO 01/14/2021.
For Full project description, see attached documents.
The Construction Firm shall provide construction services to fabricate new windows, remove existing window systems, install new window systems in Buildings 1. The Contractor shall abide by Construction Documents to meet applicable design standards and building codes. The Scope of Work for this project shall include, but not limited to, the following items and the necessary disciplines to accomplish these tasks:
- • The Contractor shall complete a Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient safety, public safety, security controls for physical and logical access, and environmental controls and limitations on vibrations, noise, and disruptions to operations and utilities.
- • The Contactor shall provide to the VA resident engineer a definitive project schedule consistent with information contained within the construction documents. The VA reserves the right to define work zone availability and the Contractor’s schedule will work in a collaborative fashion to ensure that the on-going operational needs of Building 1 within the work scope are not negatively affected in any way. The building will remain occupied during the duration of this project.
- • The Contractor remains responsible throughout the project life for protecting all surfaces and items, either VA owned or personal, from damage or destruction. The movement of items will not be allowed outside of the room of origin unless the Contractor accepts responsibility for storing said material at an offsite location at their cost.
- • The VA will perform Construction period services including periodic construction progress inspections, hazardous material abatement monitoring, final inspections and submittals.
- • The Contractor shall replace existing exterior windows with a new, energy efficient window system in Building 1. Coordination shall be made with the VA resident engineer to identify project schedule, logistics, physical security, confirmation of hours of operations and method of construction. The construction includes demolition, hazardous material abatement (Industrial Hygiene) and safety and infection control measures as required in the documents.
- • The project period of performance is 730 calendar days from receipt of Notice to Proceed.
Update #2 ·
Amendment to solicitation to include Pre-Bid attendance roster and include updated Wage Determination.
For Full project description, see attached documents.
The Construction Firm shall provide construction services to fabricate new windows, remove existing window systems, install new window systems in Buildings 1. The Contractor shall abide by Construction Documents to meet applicable design standards and building codes. The Scope of Work for this project shall include, but not limited to, the following items and the necessary disciplines to accomplish these tasks:
- • The Contractor shall complete a Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient safety, public safety, security controls for physical and logical access, and environmental controls and limitations on vibrations, noise, and disruptions to operations and utilities.
- • The Contactor shall provide to the VA resident engineer a definitive project schedule consistent with information contained within the construction documents. The VA reserves the right to define work zone availability and the Contractor’s schedule will work in a collaborative fashion to ensure that the on-going operational needs of Building 1 within the work scope are not negatively affected in any way. The building will remain occupied during the duration of this project.
- • The Contractor remains responsible throughout the project life for protecting all surfaces and items, either VA owned or personal, from damage or destruction. The movement of items will not be allowed outside of the room of origin unless the Contractor accepts responsibility for storing said material at an offsite location at their cost.
- • The VA will perform Construction period services including periodic construction progress inspections, hazardous material abatement monitoring, final inspections and submittals.
- • The Contractor shall replace existing exterior windows with a new, energy efficient window system in Building 1. Coordination shall be made with the VA resident engineer to identify project schedule, logistics, physical security, confirmation of hours of operations and method of construction. The construction includes demolition, hazardous material abatement (Industrial Hygiene) and safety and infection control measures as required in the documents.
- • The project period of performance is 730 calendar days from receipt of Notice to Proceed.
Update #1 ·
For Full project description, see attached documents.
The Construction Firm shall provide construction services to fabricate new windows, remove existing window systems, install new window systems in Buildings 1. The Contractor shall abide by Construction Documents to meet applicable design standards and building codes. The Scope of Work for this project shall include, but not limited to, the following items and the necessary disciplines to accomplish these tasks:
- • The Contractor shall complete a Pre-Construction Risk Assessment to determine the requirements for Infection Control, Interim Life Safety Measures, occupational safety and health, patient safety, public safety, security controls for physical and logical access, and environmental controls and limitations on vibrations, noise, and disruptions to operations and utilities.
- • The Contactor shall provide to the VA resident engineer a definitive project schedule consistent with information contained within the construction documents. The VA reserves the right to define work zone availability and the Contractor’s schedule will work in a collaborative fashion to ensure that the on-going operational needs of Building 1 within the work scope are not negatively affected in any way. The building will remain occupied during the duration of this project.
- • The Contractor remains responsible throughout the project life for protecting all surfaces and items, either VA owned or personal, from damage or destruction. The movement of items will not be allowed outside of the room of origin unless the Contractor accepts responsibility for storing said material at an offsite location at their cost.
- • The VA will perform Construction period services including periodic construction progress inspections, hazardous material abatement monitoring, final inspections and submittals.
- • The Contractor shall replace existing exterior windows with a new, energy efficient window system in Building 1. Coordination shall be made with the VA resident engineer to identify project schedule, logistics, physical security, confirmation of hours of operations and method of construction. The construction includes demolition, hazardous material abatement (Industrial Hygiene) and safety and infection control measures as required in the documents.
- • The project period of performance is 730 calendar days from receipt of Notice to Proceed.
Attachments
Show all 25
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z2DA--657-19-110JC, FCA Replace Windows Building 1 (VA-20-00020780) | Award Notice | |
| Z2DA--657-19-110JC, FCA Replace Windows Building 1 | Solicitation | |
| Z2DA--657-19-110JC, FCA Replace Windows Building 1 | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity