This request for information (RFI) document provides specifications for replacing windows in Building 1 at the VA St. Louis Health Care System. The scope of work includes demolishing existing windows, hazardous material abatement, and installing a new energy efficient window system. Contractors must submit a pre-construction risk assessment and schedule to the VA resident engineer that addresses infection control, life safety measures, and ensures ongoing building operations are not disrupted. The building will remain occupied during the 730-day period of performance. The contractor is responsible for protecting surfaces and stored items from damage. The VA will perform construction inspections and submittal reviews. Relevant details include coordinating logistics with the VA to identify work hours and methods, as the building will be occupied throughout construction.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
657-19-110JC, Replace Windows Bldg. 1
VA St. Louis Health Care System
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 1
SECTION 08 80 00
GLAZING
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies the following:
1. Glass.
2. Glazing materials and accessories for both factory and field glazed assemblies.
1.2 RELATED WORK:
A. Factory glazed by manufacturer in following units:
1. Aluminum Windows: Section 08 51 13, ALUMINUM WINDOWS.
1.3 LABELS:
A. Temporary labels:
1. Provide temporary label on each light of glass identifying manufacturer or brand and glass type, quality and nominal thickness.
2. Label in accordance with NFRC label requirements.
3. Temporary labels are to remain intact until glass is approved by
Contracting Officer Representative (COR).
B. Permanent labels:
1. Locate in corner for each pane.
2. Label in accordance with ANSI Z97.1 and SGCC label requirements.
a. Tempered glass.
b. Laminated glass or have certificate for panes without permanent label.
c. Organic coated glass.
3. Fire rated glazing assemblies: Mark in accordance with IBC.
1.4 PERFORMANCE REQUIREMENTS:
A. General: Design glazing system consistent with guidance and practices presented in the GANA Glazing Manual, GANA Laminated Glazing Manual, and GANA Sealant Manual, as applicable to project. Installed glazing is to withstand applied loads, thermal stresses, thermal movements, building movements, permitted tolerances, and combinations of these conditions without failure, including loss or glass breakage attributable to defective manufacture, fabrication, or installation;
failure of sealants or gaskets to remain watertight and airtight;
deterioration of glazing materials; unsafe engagement of the framing
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 2 system; deflections beyond specified limits; or other defects in construction.
B. Glazing Unit Design: Design glass, including engineering analysis meeting requirements of authorities having jurisdiction. Thicknesses listed are minimum. Coordinate thicknesses with framing system manufacturers.
1. Design glass in accordance with ASTM E1300, and for conditions beyond the scope of ASTM E1300, by a properly substantiated structural analysis.
2. Design Wind Pressures: In accordance with ASCE 7.
3. Wind Design Data: In accordance with ASCE 7.
4. Maximum Lateral Deflection: For glass supported on all four edges, limit center-of-glass deflection at design wind pressure to not more than the structural capacity of the glazing unit, the threshold at which frame engagement is no longer safely assured, 1/100 times the short-side length, or 19 mm (0.75 inch), whichever is less.
C. Building Enclosure Vapor Retarder and Air Barrier:
1. Utilize the inner pane of multiple pane sealed units for the continuity of the air barrier and vapor retarder seal.
2. Maintain a continuous air barrier and vapor retarder throughout the glazed assembly from glass pane to heel bead of glazing sealant.
1.5 SUBMITTALS:
A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
B. Manufacturer's Certificates:
1. Certificate stating that fire-protection and fire-resistive glazing units meet code requirements for fire-resistance-rated assembly and applicable safety glazing requirements.
2. Certificate on solar heat gain coefficient when value is specified.
3. Certificate on "R" value when value is specified.
C. Manufacturer Warranty.
D. Manufacturer's Literature and Data:
1. Glass, each kind required.
2. Insulating glass units.
3. Glazing cushion.
4. Sealing compound.
5. Horizontal louver blind & blind operator.
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 3
E. Samples:
1. Size: 305 mm by 305 mm (12 inches by 12 inches).
2. Tinted glass.
3. Reflective glass.
4. Transparent (one-way vision glass) mirrors.
5. Horizontal louver slat.
F. Preconstruction Adhesion and Compatibility Test Report: Submit glazing sealant manufacturer’s test report indicating glazing sealants were tested for adhesion to glass and glazing channel substrates and for compatibility with glass and other glazing materials.
1.6 DELIVERY, STORAGE AND HANDLING:
A. Delivery: Schedule delivery to coincide with glazing schedules so minimum handling of crates is required. Do not open crates except as required for inspection for shipping damage.
B. Storage: Store cases according to printed instructions on case, in areas least subject to traffic or falling objects. Keep storage area clean and dry.
C. Handling: Unpack cases following printed instructions on case. Stack individual windows on edge leaned slightly against upright supports with separators between each.
D. Protect laminated security glazing units against face and edge damage during entire sequence of fabrication, handling, and delivery to installation location. Provide protective covering on exposed faces of glazing plastics, and mark inside as "INTERIOR FACE" or "PROTECTED
FACE":
1. Treat security glazing as fragile merchandise, and packaged and shipped in export wood cases with width end in upright position and blocked together in a mass. Storage and handling to comply with manufacturer's directions and as required to prevent edge damage or other damage to glazing resulting from effects of moisture, condensation, temperature changes, direct exposure to sun, other environmental conditions, and contact with chemical solvents.
2. Protect sealed-air-space insulating glazing units from exposure to abnormal pressure changes, as could result from substantial changes in altitude during delivery by air freight. Provide temporary breather tubes which do not nullify applicable warranties on hermetic seals.
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 4
3. Temporary protections: The glass front and polycarbonate back of glazing are to be temporarily protected with compatible, peelable, heat-resistant film which will be peeled for inspections and re-applied and finally removed after doors and windows are installed at destination. Since many adhesives will attack polycarbonate, the film used on exposed polycarbonate surfaces is to be approved and applied by manufacturer.
4. Edge protection: To cushion and protect glass clad, and polycarbonate edges from contamination or foreign matter, the four (4) edges are to be sealed the depth of glazing with continuous standard-thickness thermoplastic rubber tape. Alternatively, continuous channel shaped extrusion of thermoplastic rubber are to be used, with flanges extending into face sides of glazing.
5. Protect "Constant Temperature" units including every unit where glass sheet is directly laminated to or directly sealed with metal-tube type spacer bar to polycarbonate sheet, from exposures to ambient temperatures outside the range of 16 to 24 degrees C (60 to
75 degrees F), during the fabricating, handling, shipping, storing, installation, and subsequent protection of glazing.
1.7 PROJECT CONDITIONS:
Field Measurements: Field measure openings before ordering tempered glass products to assure for proper fit of field measured products.
1.8 WARRANTY:
A. Construction Warranty: Comply with the FAR clause 52.246-21 “Warranty of Construction”.
B. Manufacturer Warranty: Manufacturer shall warranty their glazing from the date of installation and final acceptance by the Government as follows. Submit manufacturer warranty.
1. Bullet resistive plastic material to remain visibly clear without discoloration for 10 years.
2. Insulating glass units to remain sealed for ten (10) years.
3. Laminated glass units to remain laminated for five (5) years.
4. Polycarbonate to remain clear and ultraviolet light stabilized for five (5) years.
5. Insulating plastic to not have more than 6 percent decrease in light transmission and be ultraviolet light stabilized for ten (10) years.
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 5
1.9 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.
B. American Architectural Manufacturers Association (AAMA):
800.....................Test Methods for Sealants
810.1-77................Expanded Cellular Glazing Tape
C. American National Standards Institute (ANSI):
Z97.1-14................Safety Glazing Material Used in
Building - Safety Performance Specifications and Methods of Test
D. American Society of Civil Engineers (ASCE):
7-10....................Wind Load Provisions
E. ASTM International (ASTM):
C542-05(R2011)..........Lock-Strip Gaskets
C716-06.................Installing Lock-Strip Gaskets and Infill
Glazing Materials
C794-10.................Adhesion-in-Peel of Elastomeric Joint Sealants
C864-05(R2011)..........Dense Elastomeric Compression Seal Gaskets, Setting Blocks, and Spacers
C920-14a................Elastomeric Joint Sealants
C964-07(R2012)..........Standard Guide for Lock-Strip Gasket Glazing
C1036-11(R2012).........Flat Glass
C1048-12................Heat-Treated Flat Glass-Kind HS, Kind FT Coated and Uncoated Glass.
C1172-14................Laminated Architectural Flat Glass
C1349-10................Standard Specification for Architectural Flat
Glass Clad Polycarbonate
C1376-10................Pyrolytic and Vacuum Deposition Coatings on
Flat Glass
D635-10.................Rate of Burning and/or Extent and Time of
Burning of Self-Supporting Plastic in a
Horizontal Position
D4802-10................Poly (Methyl Methacrylate) Acrylic Plastic
Sheet
E84-14..................Surface Burning Characteristics of Building
Materials
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 6
E119-14.................Standard Test Methods for Fire Test of Building
Construction and Material
E1300-12a...............Load Resistance of Glass in Buildings
E1886-13a...............Standard Test Method for Performance of
Exterior Windows, Curtain Walls, Doors, and
Impact Protective Systems Impacted by
Missile(s) and Exposed to Cyclic Pressure
Differentials
E1996-14a...............Standard Specification for Performance of
Exterior Windows, Curtain Walls, Doors, and
Impact Protective Systems Impacted by Windborne
Debris in Hurricanes
E2141-12................Test Methods for Assessing the Durability of
Absorptive Electrochromic Coatings on Sealed
Insulating Glass Units
E2190-10................Insulating Glass Unit
E2240-06................Test Method for Assessing the Current-Voltage
Cycling Stability at 90 Degree C (194 Degree F) of Absorptive Electrochromic Coatings on Sealed
Insulating Glass Units
E2241-06................Test Method for Assessing the Current-Voltage
Cycling Stability at Room Temperature of
Absorptive Electrochromic Coatings on Sealed
Insulating Glass Units
E2354-10................Assessing the Durability of Absorptive
Electrochromic Coatings within Sealed
Insulating Glass Units
E2355-10................Test Method for Measuring the Visible Light
Transmission Uniformity of an Absorptive
Electrochromic Coating on a Glazing Surface
F1233-08................Standard Test Method for Security Glazing
Materials and Systems
F1642-12................Test Method for Glazing and Glazing Systems
Subject to Airblast Loadings
F. Code of Federal Regulations (CFR):
16 CFR 1201-10..........Safety Standard for Architectural Glazing
Materials
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 7
G. Glass Association of North America (GANA):
2010 Edition............GANA Glazing Manual
2008 Edition............GANA Sealant Manual
2009 Edition............GANA Laminated Glazing Reference Manual
2010 Edition............GANA Protective Glazing Reference Manual
H. International Code Council (ICC):
IBC.....................International Building Code
I. Insulating Glass Certification Council (IGCC)
J. Insulating Glass Manufacturer Alliance (IGMA):
TB-3001-13..............Guidelines for Sloped Glazing
TM-3000.................North American Glazing Guidelines for Sealed
Insulating Glass Units for Commercial and
Residential Use
K. Intertek Testing Services – Warnock Hersey (ITS-WHI)
L. National Fire Protection Association (NFPA):
80-16...................Fire Doors and Windows
252-12..................Fire Tests of Door Assemblies
257-12..................Standard on Fire Test for Window and Glass
Block Assemblies
M. National Fenestration Rating Council (NFRC)
N. Safety Glazing Certification Council (SGCC) 2012:
Certified Products Directory (Issued Semi-Annually).
O. Underwriters Laboratories, Inc. (UL):
9-08(R2009).............Fire Tests of Window Assemblies
263-14..................Fire Tests of Building Construction and
Materials
752-11..................Bullet-Resisting Equipment.
P. Unified Facilities Criteria (UFC):
4-010-01-03(R2007)......DOD Minimum Antiterrorism Standards for
Buildings
Q. U.S. Veterans Administration:
Physical Security Design Manual for VA Facilities (VAPSDG); Life Safety
Protected
Physical Security Design Manual for VA Facilities (VAPSDG); Mission
Critical Facilities
Architectural Design Manual for VA Facilities (VASDM)
R. Environmental Protection Agency (EPA):
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 8
40 CFR 59(2014).........National Volatile Organic Compound Emission
Standards for Consumer and Commercial Products
PART 2 - PRODUCT
2.1 GLASS:
A. Provide minimum thickness stated and as additionally required to meet performance requirements.
1. Provide minimum 6 mm (1/4 inch) thick glass units unless otherwise indicated.
B. Obtain glass units from single source from single manufacturer for each glass type.
C. Clear Glass:
1. ASTM C1036, Type I, Class 1, Quality q3.
D. Tinted Heat reflective and low emissivity coated glass:
1. ASTM C1036, Type I, Class 2, Quality q3.
2.2 HEAT-TREATED GLASS:
A. Roller Wave Limits for Heat-Treated Glass: Orient all roller wave distortion parallel to bottom surface of glazing, and provide units complying with the following limitations:
1. Measurement Parallel to Line: Maximum peak to valley 0.203 mm
(0.008 inch).
2. Measurement Perpendicular to Line: Maximum 0.0254 mm (0.001 inch).
3. Bow/Warp: Maximum 50 percent of bow and warp allowed by ASTM C1048.
B. Clear Tempered Glass:
1. ASTM C1048, Kind FT, Condition A, Type I, Class 1, Quality q3.
C. Tinted Tempered Glass.
1. ASTM C1048, Kind FT, Condition A, Type I, Class 2, Quality q3.
2.3 LAMINATED GLASS:
A. Laminated Glass: ASTM C1172. Two or more lites of glass bonded with polyvinyl butyral, ionomeric polymer, or cast-in-place and cured-transparent-resin interlayer complying with interlayer manufacturer's written instructions.
B. Interlayer: Use min. 0.75 mm (0.030 inch) thick interlayer for vertical glazing unless otherwise indicated in construction documents.
C. Interlayer: Use 1.5 mm (0.060 inch) thick interlayer for:
1. Horizontal or sloped glazing.
2. Acoustical glazing.
3. Assemblies requiring heat strengthened or fully tempered glass.
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 9
D. Interlayer: Use 2.28 mm (0.090 inch) thick interlayer where required to meet performance requirements.
E. Interlayer Color: Clear, unless otherwise indicated in construction documents.
2.4 INSULATING GLASS UNITS:
A. Provide factory fabricated, hermetically sealed glass unit consisting of two panes of glass separated by a dehydrated air space and comply with ASTM E2190.
B. Assemble units using glass types specified in Insulating Glass
Schedule.
2.5 GLAZING ACCESSORIES:
A. As required to supplement the accessories provided with the items to be glazed and to provide a complete installation. Ferrous metal accessories exposed in the finished work are to have a finish that will not corrode or stain while in service. Fire rated glazing to be installed with glazing accessories in accordance with the manufacturer’s installation instructions.
B. Setting Blocks: ASTM C864:
1. Silicone type.
2. Channel shape; having 6 mm (1/4 inch) internal depth.
3. Shore A hardness of 80 to 90 Durometer.
4. Block lengths: 50 mm (2 inches) except 100 to 150 mm (4 to 6 inches) for insulating glass.
5. Block width: Approximately 1.6 mm (1/16 inch) less than the full width of the rabbet.
6. Block thickness: Minimum 4.8 mm (3/16 inch). Thickness sized for rabbet depth as required.
C. Spacers: ASTM C864:
1. Channel shape having a 6 mm (1/4 inch) internal depth.
2. Flanges not less 2.4 mm (3/32 inch) thick and web 3 mm (1/8 inch) thick.
3. Lengths: 25 to 76 mm (1 to 3 inches).
4. Shore A hardness of 40 to 50 Durometer.
D. Glazing Tapes:
1. Semi-solid polymeric based closed cell material exhibiting pressure-sensitive adhesion and withstanding exposure to sunlight, moisture, heat, cold, and aging.
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 10
2. Shape, size and degree of softness and strength suitable for use in glazing application to prevent water infiltration.
3. Complying with AAMA 800 for the following types:
a. AAMA 810.1, Type 1, for glazing applications in which tape acts as the primary sealant.
b. AAMA 810.1, Type 2, for glazing applications in which tape is used in combination with a full bead of liquid sealant.
E. Spring Steel Spacer: Galvanized steel wire or strip designed to position glazing in channel or rabbeted sash with stops.
F. Glazing Gaskets: ASTM C864:
1. Firm dense wedge shape for locking in sash.
2. Soft, closed cell with locking key for sash key.
3. Flanges may terminate above the glazing-beads or terminate flush with top of beads.
G. Lock-Strip Glazing Gaskets: ASTM C542, shape, size, and mounting as indicated.
H. Glazing Sealants: ASTM C920, silicone neutral cure:
1. Type S.
2. Class 25 or 50 as recommended by manufacturer for application.
3. Grade NS.
4. Shore A hardness of 25 to 30 Durometer.
I. Neoprene, EPDM, or Vinyl Glazing Gasket: ASTM C864.
1. Channel shape; flanges may terminate above the glazing channel or flush with the top of the channel.
2. Designed for dry glazing.
J. Color:
1. Color of glazing compounds, gaskets, and sealants used for aluminum color frames to match color of the finished aluminum and be nonstaining.
2. Color of other glazing compounds, gaskets, and sealants which will be exposed in the finished work and unpainted are to be black, gray, or neutral color.
K. Smoke Removal Unit Targets: Adhesive targets affixed to glass to identify glass units intended for removal for smoke control. Comply with requirements of local Fire Department.
2.6 INTEGRAL HORIZONTAL LOUVER BLINDS
A. Slats: 6010-T8 aluminum alloy, 5/8” wide x 0.008 inch thick, crowned
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 11 profile.
B. Color: to be selected from manufacturer’s full range.
C. Magnet Operator: designed to tile and lift blinds.
PART 3 - EXECUTION
3.1 EXAMINATION:
A. Verification of Conditions:
1. Examine openings for glass and glazing units; determine they are proper size; plumb; square; and level before installation is started.
2. Verify that glazing openings conform with details, dimensions and tolerances indicated on manufacturer is approved shop drawings.
B. Review for conditions which may adversely affect glass and glazing unit installation, prior to commencement of installation. Do not proceed with installation until unsatisfactory conditions have been corrected.
C. Verify that wash down of adjacent masonry is completed prior to erection of glass and glazing units.
3.2 PREPARATION:
A. For sealant glazing, prepare glazing surfaces in accordance with
GANA Sealant Manual.
B. Determine glazing unit size and edge clearances by measuring the actual unit to receive the glazing.
C. Shop fabricate and cut glass with smooth, straight edges of full size required by openings to provide GANA recommended edge clearances.
D. Verify that components used are compatible.
E. Clean and dry glazing surfaces.
F. Prime surfaces scheduled to receive sealants, as determined by preconstruction sealant-substrate testing.
3.3 INSTALLATION – GENERAL:
A. Install in accordance with GANA Glazing Manual, GANA Sealant Manual, IGMA TB-3001, and IGMA TM-3000 unless specified otherwise.
B. Glaze in accordance with recommendations of glazing and framing manufacturers, and as required to meet the Performance Test
Requirements specified in other applicable sections of specifications.
C. Set glazing without bending, twisting, or forcing of units.
D. Do not allow glass to rest on or contact any framing member.
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 12
E. Glaze doors and operable sash, in a securely fixed or closed and locked position, until sealant, glazing compound, or putty has thoroughly set.
F. Laminated Glass:
1. Tape edges to seal interlayer and protect from glazing sealants.
2. Do not use putty or glazing compounds.
G. Insulating Glass Units:
1. Glaze in compliance with glass manufacturer's written instructions.
2. When glazing gaskets are used, they are to be of sufficient size and depth to cover glass seal or metal channel frame completely.
3. Do not use putty or glazing compounds.
4. Do not grind, nip, cut, or otherwise alter edges and corners of fused glass units after shipping from factory.
5. Install with tape or gunnable sealant in wood sash.
3.4 INSTALLATION - DRY METHOD (TAPE AND GASKET SPLINE GLAZING):
A. Cut glazing spline to length; install on glazing pane. Seal corners by butting and sealing junctions with butyl sealant.
B. Place setting blocks at 1/4 points with edge block no more than 150 mm
(6 inches) from corners.
C. Rest glazing on setting blocks and push against fixed stop with sufficient pressure to attain full contact.
D. Install removable stops without displacing glazing spline. Exert pressure for full continuous contact.
E. Do not exceed edge pressures stipulated by glass manufacturers for installing glass lites.
F. Trim protruding tape edge.
3.5 REPLACEMENT AND CLEANING:
A. Clean new glass surfaces removing temporary labels, paint spots, and defacement after approval by COR.
B. Replace cracked, broken, and imperfect glass, or glass which has been installed improperly.
C. Leave glass, putty, and other setting material in clean, whole, and acceptable condition.
3.6 PROTECTION:
A. Protect finished surfaces from damage during erection, and after completion of work. Strippable plastic coatings on colored anodized finish are not acceptable.
RFI 01 3/13/2019
10-01-15
GLAZING
08 80 00 - 13
3.7 LAMINATED GLASS SCHEDULE (FOR INTEGRAL BLIND APPLICATIONS):
A. Glass Type LG# 1: Low-E-coated, laminated vision glass with two (2) lites of clear fully tempered float glass.
1. Minimum Thickness of Each Glass Lite: 3 mm (0.12 inch).
2. Interlayer Thickness: 2.29 mm (0.090 inch).
3. Low-E Coating: Sputtered on second surface.
4. Safety glazing label required.
3.8 INSULATING LAMINATED GLASS SCHEDULE:
A. Glass Type IL# 1: Tinted, low-e coated insulating laminated glass.
1. Overall Unit Thickness: as required to accommodate integral blind between indoor and outdoor lites.
2. Outdoor Lite: Tinted annealed float glass, except heat-strengthened float glass where required, and fully tempered float glass where indicated.
a. Minimum Thickness of Outdoor Lite: 8 mm (5/16 inch).
b. Tint Color: match existing installation.
3. Interspace Content: Air.
4. Indoor Lite: Clear laminated glass with two lites of annealed float glass, except heat-strengthened float glass where required, and fully tempered float glass where indicated.
a. Minimum Thickness of Each Glass Lite: 3 mm (0.12 inch).
b. Interlayer Thickness: 2.29 mm (0.090 inch).
5. Low-E Coating: Sputtered on second surface.
6. Safety glazing label required.
- - - E N D - - -