Z1DA--NRM-const 528A7-18-716 renovate main kitchen
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C24223B0017
- Agency
-
Veterans Integrated Service Network 2
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
Notice text
10 versions
Update #10 · Latest ·
Page 1 of 1
SUPPLEMENTAL CHANGES PAGE AMENDMENT 10 dated 11 Sep 2023
Incorporate revised drawing entitled 180 VAMC M501R
Change Radiant Ceiling Panel Schedule on Sheet M501 hydronic panels to be installed is changed from 8 to 40, an increase of 32.
Change 00 01-15-1 dated 7-1-15 is changed to incorporate M501R
Incorporate NEW BID DUE DATE of TUESDAY 19 Sep 10:30 EST EMAIL only to sandra.fisher3@va.gov CALL IN : +1 347-566-4838 902117020#
All other terms and conditions remain unchanged
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////
Update #9 ·
No mechanicals shown for temporary kitchen trailer. Will any plumbing / HVAC be required? Please clarify in detail requirements. Freshwater will be required from water hose or pipe from the VAMC Syracuse Hospital building or grounds. Gray water drain can be connected to an existing Sewer Trench near the main loading dock area. The VA located and noted the nearest potable water and sanitary sewer connection locations and illustrated in this amendment plans revisions. The VA added notes to the revised plans on typical mobile kitchen trailer requirements.
G102R1; please confirm:
Phase 1 Kitchen will be fully operational. No temporary kitchen trailer? Correct.
Phase 2 Indicates temporary kitchen to be used. Correct, temporary mobile kitchen trailer is to be used by the kitchen staff starting in Phase 2 for cooking only; trayline will still be operational for tray assembly within the main kitchen area. Backup electrical will be necessary to power all equipment needed in tray assembly area (induction chargers, 3 reach-in refrigerators, undercounter freezer, steam table, toaster, mobile heated cabinet, coffee machine, and plate warmer) well as dish room area (dish machine and pulper)
Phase 3 Does not indicate on this drawing temporary kitchen to be used but does on other drawings. Please confirm Phase 3 temporary kitchen to be used and contractor has full access to kitchen area. During Phase 3, kitchen staff will still use the mobile kitchen trailer for cooking only. Temporary tray assembly area will be in the former retherm room, B261 (electrical will be necessary to power all equipment needed in tray assembly area (induction chargers, 3 reach-in refrigerators, undercounter freezer, steam table, toaster, mobile heated cabinet, coffee machine, and plate warmer). The dish room area will still be operational during this phase. The plans were revised to show sharing the freight elevators in phase 3 also, i.e. Contractor must utilize one freight elevator and Kitchen Staff will utilize one freight elevator in phase 3.
Phases 4 & 5 No temporary kitchen? Correct, no temporary kitchen trailer for cooking in Phase 4 and Phase 5, i.e. Contractor must utilize one freight elevator and Kitchen Staff will utilize one freight elevator in Phase 4 & Phase 5. During Phase 4, kitchen staff will utilize mobile dishwashing trailer for dish room duties; cooking and tray assembly duties will return to the main kitchen area.
Phase 1 has work within the kitchen area. There is significant work including demolition. If this work is to be completed during normal business hours, next to an operating kitchen, what are the Infection Control Requirements? Will there be noise restrictions? Please refer to Sheet G101G, G102R1 on the infection control requirements. There will be no noise restrictions imposed on the contractor from the Kitchen Staff. Noise restriction will not be imposed on the contractor by the 3rd floor or the 1st floor, as those areas are mainly roof and equipment, shafts on the 3rd floor and we will notify the pharmacy on the first floor that there will be noise due to minor demo and construction the 2nd floor.
Please clarify the requirements related to the SSHO (013526-1.7):
Is a separate, full-time SSHO required in addition to a full-time Site Superintendent for the Prime Contractor? No, as long as the Site Superintendent is qualified and meets the requirements of the SSHO.
Please clarify proof/documentation to satisfy the requirement the SSHO to have (5) years of construction industry safety experience (013526-1.8A) ) Resume/CV: The SSHO can provide their resume or curriculum vitae that highlights their work experience in the construction industry, mentioning all relevant positions held, including any safety-related roles.
Work Experience Letters: The SSHO can provide letters from previous employers, specifically those in the construction industry, verifying their employment, job titles, and duration of employment. These letters should also confirm their safety responsibilities or roles during their tenure.
Certifications and Training: The SSHO can provide copies of relevant certifications and training courses they have completed, specifically pertaining to construction industry safety. This could include certifications such as OSHA 30-Hour Construction Safety and Health, construction safety management courses, and other relevant training programs.
Project Documentation: If the SSHO has worked on significant construction projects, they can provide project documentation, such as project reports, safety plans, incident reports, etc., to demonstrate their involvement in the construction industry and their safety responsibilities on those projects.
References: The SSHO can provide professional references from individuals who can speak to their construction industry safety experience. These references can be from previous employers, colleagues, or clients who can verify their safety-related work and provide insight into their capabilities.
Accomplishments or Awards: If the SSHO has received any recognition or awards related to construction industry safety, they can provide documentation of these achievements as proof of their experience.
Please verify the requirement that the Competent Person(s) must have taken or retaken their OSHA 30 Hour within the past 5 years. We will accept a 30-hour OSHA Construction Safety certificate, regardless of the date completed.
Please verify the requirement of a separate (LICENSED) Certified Safety Professional (CSP) or a Certified Construction Safety and Health Technician (CSHT) to conduct random monthly site safety inspections.
Please verify this requirement cannot be fulfilled by a corporate safety professional (Safety/Operations Manager) and this person must be licensed and provide their certificate number. The word or clarifies this question . Meaning, as a minimum the SSHO must have completed the OSHA 30-hour Construction Safety class, regardless of the date completed, and have five (5) years of construction industry safety experience.
Please confirm the quantity of parking spaces available to the prime contractor (per spec: A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only ) Refer to spec 01 00 00 section 1.5.F.1.
Will the government agree to pay for Stored Materials on this project due to the volatile material price fluctuations and unpredictability of the market, with the provisions of material invoice/packing slips, photo, and insurance backup information for each relevant charge? No
Will the government agree to material increase cost adjustment requests for suppliers (change orders) for products subject to long submittal review periods, long lead times and/or general post-bid issues? This is a firm-fixed price contract and there is no economic price adjustment clause in this contract.
Update #8 ·
Page 1 of 1
SUPPLEMENTAL CHANGES PAGE AMENDMENT 8 dated 16 Aug 2023
Delete ANY AND ALL PRIOR SPECS AND DRAWINGS , RFIS QUESTIONS AND ANSWERS
Incorporate Period Of Performance is 365 days
Incorporate 15 Aug 23 VAMC-RFI revision Full set
Incorporate 15 AUG 23 VAMC RFI REVISIONS 528-A7-18-716 Kitchen Specifications
Incorporate the following drawings: 019 Plumbing, 024-24 of 190 Front North and Rear Elevations 1-24, 046- Fire Protection 2nd Floor Unit Floor Plan 1-FP-13, 058- Electrical Lighting and Signal 2nd Floor Unit A Floor Plan 1-E-28, 116 HVAC 2nd Floor Unit A Floor Plan 1-H-13
Incorporate SITE VIST FRIDAY 18 AUG 2023 at 0930 Meet in hallway NG 44
Incorporate RFI Q & A deadline 23 Aug 2023 at 10:30 EST to sandra.fisher3@va.gov
Incorporate NEW BID DUE DATE of 30 Aug 10:30 EST EMAIL only to sandra.fisher3@va.gov CALL IN : +1 347-566-4838 902117020#
All other terms and conditions remain unchanged
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////
Update #7 ·
Page 1 of 1
Purpose of this amendment is to EXTEND bid opening date
Extend the bid opening date to WEDNESDAY 23 AUG 2023 at 10:30 EST
Incorporate BID OPENING DAY CALL IN : +1 347-566-4838 902117020#
All other terms and conditions remain unchanged
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////
Update #6 ·
Page 1 of 1
Purpose of this amendment is to EXTEND bid opening date
Extend the bid opening date to WEDNESDAY 2 AUG 2023 at 10:30 EST
Incorporate BID OPENING DAY CALL IN : +1 347-566-4838 902117020#
All other terms and conditions remain unchanged
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////
Update #5 ·
Page 1 of 1
Purpose of this amendment is to incorporate additional site visit and TEAMS call in info
Incorporate ADDITIONAL SITE VISIT FRIDAY 14 JULY 0900 outside NG 44 Conference Room
Incorporate BID OPENING DAY CALL IN : +1 347-566-4838 902117020#
All other terms and conditions remain unchanged
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////
Update #4 ·
Page 1 of 1
Purpose of this amendment is to incorporate attachment Spec v4
Incorporate Spec Revision V4
All other terms and conditions remain unchanged
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////
Update #3 ·
Purpose of this amendment is to incorporate RFI Q and As and to incorporate changed drawings and extend Period of Performance
Incorporate RFI Q and As
Incorporate the attached 528A7-18-716 Renovate Kitchen Drawings,
Incorporate the attached 140- Ceiling 2nd Floor unit Incorporate
Incorporate the attached 019- Plumbing 2nd Floor unit 1-P-13, 024-024 of 190 Front (North) -Rear (South)
Incorporate the attached 046- Fire Protection- 2nd Floor Unit Floor Plan.
Incorporate an additional 208 days to period of performance making the total period of performance 573 days
CHANGE BID OPENING DATE to 19 JULY 23 at 1030 EST - EMAIL BIDS ONLY
All other terms and conditions remain unchanged
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////
Update #2 ·
Extend the Bid opening to 12 July 2023 at 10 30 EST by EMAIL ONLY
Incorporate the attached Buy American Act certification in accordance with FAR 52.225-2 and remove block 10 on SF1442 wording that it is found on page 65.
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////
Update #1 ·
Incorporate drawings
Files
Show all 35
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--528A7-18-716 renovate main kitchen | Award Notice | |
| This notice | Solicitation | |
| Z1DA--NRM-const 528A7-18-716 renovate main kitchen | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity