5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 528A7-18-716 Department of Veterans Affairs Network Contracting Office 02 800 Irving Ave Syracuse
NY
13210 Department of Veterans Affairs Network Contracting Office 02 800 Irving Ave Syracuse
NY
13210 To all Offerors/Bidders
36C24223B0017 07-10-2023
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
WEDNESDAY 19 JUL 23 10:30 EST-EMAIL ONLY
X Purpose of this amendment is to incorporate changes in attached page entitled Amendment 0003
///////// NOTHING FOLLOWS///NOTHING FOLLOWS/////NOTHING FOLLOWS/////////
See attached document: RFI Q and A- Renovate Main Kitchen- 27 June 23.
See attached document: 528A7-18-716 Renovate Main Kitchen Drawings_Revised_V4.
See attached document: 140-CEILING-2ND FL UNIT A FLOOR PLAN 1-C-13.
See attached document: 019-PLUMBING-2ND FL UNIT A FLOOR PLAN 1-P-13.
See attached document: 046-FIRE PROTECTION-2ND FL UNIT A FLOOR PLAN 1-FP-13.
See attached document: 024-24 of 190 FRONT (NORTH) _ REAR (SOUTH) ELEVATIONS. 1-24 - Copy.
Purpose of this amendment is to incorporate RFI Q and As and to incorporate changed drawings and extend Period of Performance A.) Incorporate RFI Q and As B.) Incorporate the attached 528A7-18-716 Renovate Kitchen Drawings, C.) Incorporate the attached 140- Ceiling 2nd Floor unit Incorporate D.) Incorporate the attached 019- Plumbing 2nd Floor unit 1-P-13, 024-024 of 190 Front (North) -Rear (South) E.) Incorporate the attached 046- Fire Protection- 2nd Floor Unit Floor Plan.
F.) Incorporate an additional 208 days to period of performance making the total period of performance 573 days G.) CHANGE BID OPENING DATE to 19 JULY 23 at 1030 EST - EMAIL BIDS ONLY H.) All other terms and conditions remain unchanged
////NOTHING FOLLOWS///////////////NOTHING FOLLOWS//////////////