RENOVATE MAIN KITCHEN
SYRACUSE VA MEDICAL CENTER
800 IRVING AVE, SYRACUSE, NY 13210
PROJECT NO: 528A7-18-716
PROJECT DATA PROJECT DESCRIPTIONDRAWING INDEX
SITE LOCATION KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ARCHITECT:
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
C&S Companies 499 Col Eileen Collins Blvd Syracuse, New York, 13212
(315) 455-2000
RENOVATE MAIN KITCHEN
SYRACUSE VA MEDICAL CENTER
528A7-18-716
BUILDING 1
08/25/2023 DW JD
KITCHEN CONSULTANT:
Commercial Kitchen Consulting 21 Powers Rd Binghamton, New York, 13903
(607) 242-5571
T-100R
TITLE SHEET
Sheet Number Sheet Name
T-100R TITLE SHEET
G-100R GENERAL NOTES
G-101R CODE CONFORMANCE
G-102R1 CONSTRUCTION SEQUENCING AND INFECTION CONTROL PLANS
H-101R HAZARDOUS MATERIALS PLAN
AD-101R ARCHITECTURAL DEMOLITION PLAN
A-101R ARCHITECTURAL PLAN
A-102R ARCHITECTURAL REFLECTED CEILING PLAN
A-301 ENLARGED BATHROOM PLANS
A-501R TYPICAL DETAILS
A-502R WINDOW DETAILS & PARTITION TYPES
A-701R SIGNAGE PLAN AND DETAILS
FX-001 FIRE PROTECTION SYMBOLS, NOTES AND DETAILS
FX-101R FIRE PROTECTION PLAN
M-001 MECHANICAL NOTES AND ABBREVIATIONS
MD101R MECHANICAL DEMOLITION PLAN
M-101R MECHANICAL PLAN
M-102R MECHANICAL EQUIPMENT PLAN
M-103R MECHANICAL CEILING PLANS
M-501 MECHANICAL SCHEDULES AND DETAILS
M-701 MECHANICAL CONTROLS SCHEMATICS
M-702 AHU-16 CONTROLS MODIFICATIONS
E-001 ELECTRICAL ABBREVIATIONS
ED101R ELECTRICAL DEMOLITION PLAN
E-101R ELECTRICAL PLAN
E-501R ELECTRICAL SCHEDULES AND PARTIAL RISER DIAGRAMS
E-502 LIGHTING DETAILS AND SCHEDULES
P-001R PLUMBING SYMBOLS, NOTES, AND ABBREVIATIONS
P-101R PLUMBING PLAN
P-301 PLUMBING PLANS - ENLARGED
QC101R EXISTING FOODSERVICE EQUIPMENT LAYOUT
QC102R FINAL FOODSERVICE EQUIPMENT LAYOUT
QC103R FOODSERVICE EQUIPMENT LAYOUT
QC104R UTILITY DISTRIBUTION SYSTEM DRAWING
QC105R UTILITY DISTRIBUTION SYSTEM DRAWING
QC106 WALK-IN FREEZER DRAWING
QC107 WALK-IN COMBINATION COOLER DRAWING
QC108R CART WASHER DRAWING
N
SEISMIC ANALYSIS
STATE: NEW YORK
COUNTY: ONONDAGA
GOVERNMENT PROPERTY: DEPARTMENT OF VETERANS AFFAIRS
LOCAL JURISDICTION: SYRACUSE VAMC
YEAR AND CODE IN EFFECT BY DISCIPLINE:
• VA HVAC DESIGN MANUAL, NOVEMBER 1, 2017
• VA ELECTRICAL DESIGN MANUAL, DECEMBER 2015
• H-18-8 VA SEISMIC DESIGN REQUIREMENTS, OCTOBER 1 2016
• INTERNATIONAL BUILDING CODE (IBC), 2015
• INTERNATIONAL MECHANICAL CODE, 2015
• NFPA 70, NATIONAL ELECTRICAL CODE, 2017
• ASCE-7, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, 2016 SITE ZONING: NA
SEISMIC ANALYSIS PER IBC:
• RISK CATEGORY IV, (ESSENTIAL FACILITY PER CHAP 7, TABLE 5 OF VA SEISMIC DESIGN MANUAL
• SITE CLASS D PER IBC 1613.3.2 (ASSUMED)
• SS = 0.141 (MAPPED SPECTRAL ACCELERATION FOR SHORT PERIOD PER IBC SECTION 1613.3.1)
• S1 = 0.051 (MAPPED SPECTRAL ACCELERATION FOR 1-SECOND PERIOD PER IBC SECTION 1613.3.1)
• FA = 1.6 (SITE COEFFICIENT PER IBC TABLE 1613.3.3(1))
• FV = 2.4 (SITE COEFFICIENT PER IBC TABLE 1613.3.3(2))
• SMS = FA SS = 0.225 (MAX CONSIDERED EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS FOR SHORT PERIOD PER IBC 1613.3.3)
• SM1 = FV S1 = 0.122 (MAX CONSIDERED EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS FOR 1-SECOND PERIOD PER IBC 1613.3.3)
• SDS = (2/3) SMS = 0.15 • SD1 = (2/3) SM1 = 0.081
• SEISMIC DESIGN CATEGORY: C
THE PROJECT WILL RENOVATE THE MAIN KITCHEN ON THE SECOND FLOOR AT THE SYRACUSE VA. THE PROJECT ENTAILS MECHANICAL UPGRADES TO FIX SOME SPACE COMFORT ISSUES, CONSOLIDATION AND REPLACEMENT OF EXISTING ELECTRICAL PANELS, AND REPLACEMENT OF ALL LIGHTING IN THE WORK AREA. THE KITCHEN WALK-IN COOLERS WILL BE REPLACED AND A NEW UTILITY DISTRIBUTION SYSTEM WILL BE PROVIDED. ARCHITECTURAL FEATURES WILL BE UPGRADED INCLUDING REPLACEMENT OF THE CEILINGS, PATCHING OF THE FLOOR TILES AND WALL, AND REMOVAL OF WALLS TO MAXIMIZE WORK AREA AND IMPROVE WORK FLOW. THE ENTIRE AREA OF RENOVATION IS APPROXIMATELY 6,600 SQUARE FEET.
G-103R CONSTRUCTION PHASING AND KITCHEN OPERATIONS PLANS
G-104R CONSTRUCTION PHASING AND KITCHEN OPERATIONS PLANS
G-105R CONSTRUCTION PHASING AND KITCHEN OPERATIONS PLANS
NOTE:
REVISIONS ON SHEETS IDENTIFIED BY "R" IN THE DRAWING
NUMBER BLOCK WERE MADE BY THE VETERANS ADMINISTRATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ARCHITECT:
Project Director
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
C&S Companies 499 Col Eileen Collins Blvd Syracuse, New York, 13212
(315) 455-2000
SYRACUSE VA MEDICAL CENTER
528A7-18-716
BUILDING 1
08/25/2023 DW JD
KITCHEN CONSULTANT:
Commercial Kitchen Consulting 747 Conklin Road Binghamton, New York 13903
(607) 217-5389
100% CONSTRUCTION
DOCUMENTS
RENOVATE MAIN KITCHENGENERAL NOTES
G-100R
GENERAL NOTES
1. GENERAL CONDITIONS AS SPECIFIED IN THE VA DOCUMENTS AND GENERAL CONDITIONS OF THE CONTRACT FOR
CONSTRUCTION OF A SMALL PROJECT SHALL APPLY TO THIS PROJECT.
2. BUILDING CODE: ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE VA INCLUDING ALL FEDERAL, STATE, AND LOCAL BUILDING ORDINANCE (MOST RECENT REVISION) AND ANY OTHER APPLICABLE CODES AND STANDARDS THAT
APPLY.
3. WARRANTY: ALL WORK IN THIS CONTRACT SHALL BE WARRANTED AGAINST ANY DEFECTIVE MATERIALS OR WORKMANSHIP FOR A MINIMUM OF ONE YEAR AFTER DATE OF SUBSTANTIAL COMPLETION AND/OR AS REQUIRED IN THE SPECIFICATIONS. ANY DEFECTIVE MATERIAL OR WORKMANSHIP SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO VA.
4. UNLESS SPECIFICALLY NOTED AS EXISTING, ALL ITEMS, EQUIPMENT AND WORK SHOWN IS NEW AND SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR.
5. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDINGS WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER INSOFAR AS POSSIBLE. ALL WORK SHALL BE COORDINATED WITH THE CONTRACTING OFFICER ’ S REPRESENTATIVE AND IS SUBJECT TO HIS CONTINUOUS APPROVAL.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL EQUIPMENT INSTALLED MEETS THE INTENDED OPERATIONAL REQUIREMENTS OF THE VETERAN'S HEALTH ADMINISTRATION END-USER. SHOULD THERE BE ANY DIFFERENCES IN PROVIDING UTILITY SERVICE TO THE EQUIPMENT OR CONFIGURATION/LOCATION OF THE EQUIPMENT SHOWN ON THE DESIGN DRAWINGS, THE CONTRACTOR MUST COORDINATE WITH THE CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE AND PROPOSE MEANS AND METHODS TO MAKE ANY NECESSARY CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE NEW EQUIPMENT INSTALLATION. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES REQUIRED TO PROPERLY INSTALL AND SUPPORT THE EQUIPMENT, ALLOWING IT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH IT WAS DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE, BUT ARE NOT LIMITED TO, WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES. ACCOMMODATING SERVICES MAY ALSO BE REQUIRED, SUCH AS DIMENSIONS, LOCATIONS, AND SIZES OF SUPPORTING MEMBERS, CONNECTION SIZES FOR PIPES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS. ANY NEW WORK CHANGE REQUESTS ARE SUBJECT TO THE APPROVAL OF THE PROJECT ENGINEER AND THE CONTRACTING OFFICER'S REPRESENTATIVE.
THE CONTRACTOR'S RESPONSIBILITY FOR FIELD VERIFICATION OF MEASUREMENTS, EQUIPMENT AND UTILITIES PRIOR TO CONSTRUCTION IS REFERENCED IN NUMEROUS SECTIONS OF THE CONTRACT SPECIFICATIONS. ANY NEW WORK CHANGE REQUESTS BY THE CONTRACTOR, AS A RESULT OF ANY DEVIATION, WILL BE CONSIDERED ON A CASE-BY-CASE BASIS BY THE CONTRACTING OFFICER WHO WILL MAKE THE DETERMINATION, BASED ON REVIEW OF THE DRAWINGS AND SPECIFICATIONS, AS
TO WHAT IS FAIR AND REASONABLE TO BOTH THE GOVERNMENT AND THE CONTRACTOR.
7. PRELIMINARY AIR BALANCE REPORT. AT THE BEGINNING OF THE WORK IMMEDIATELY AFTER RECEIVING NOTICE TO PROCEED, THE CONTRACTOR SHALL MEASURE AND SUBMIT A PRELIMINARY BALANCE REPORT IN COMPLIANCE WITH THE SPECIFICATIONS FOR ALL TERMINAL UNITS IN THE AREA OF WORK OF THIS PROJECT. MEASURE ALL SUPPLY, RETURN, AND EXHAUST AIR QUANTITIES. IF AN AHU SERVES THE ENTIRE SPACE, MEASURE AHU IN FULL COOLING, MAX AIR FLOW, AT THE AHU, AND MAX AIR FLOW AT ALL ZONES AND ALL DIFFUSERS; MEASURE THE DISCHARGE STATIC PRESSURE AT THE AHU AND THE SUCTION STATIC PRESSURE AT THE AHU. THEN EACH ZONE SHALL BE SET TO FULL REHEAT AND THE AIR QUANTITY MEASURED AT EACH OUTLET AND THE WATER FLOWS AND TEMPERATURES MEASURED AT EACH REHEAT BOX. OTHER TERMINAL UNITS TO INCLUDE BUT NOT LIMITED TO: FAN COIL UNITS, RADIANT PANELS, AND CHILLED BEAM SHALL HAVE BOTH HYDRONIC AND AIRFLOW MEASURED AT FULL CAPACITY. THE EXISTING MECHANICAL DRAWINGS WILL BE PROVIDED BY THE FACILITY ENGINEERING DEPARTMENT AT THE VA. SUBMIT A BLANK AIR BALANCE REPORT FOR APPROVAL PRIOR TO BEGINNING THE PRELIMINARY AIR BALANCE.
8. REQUEST APPROVAL FROM THE CONTRACTING OFFICER ’ S REPRESENTATIVE SEVEN DAYS IN ADVANCE FOR THE SHUTDOWN OF
ANY EXISTING SYSTEM.
9. FINAL ADVANCE NOTICE OF 48 HOURS SHALL BE GIVEN TO THE CONTRACTING OFFICER ’ S REPRESENTATIVE PRIOR TO THE
PROPOSED SHUTDOWN OF ANY SYSTEM.
10. THE CLOSING AND OPENING OF VALVES SHALL BE WITNESSED BY THE CONTRACTING OFFICER ’ S REPRESENTATIVE; NOTIFY
LOCAL AUTHORITIES AS REQUIRED.
11. PROVIDE ADEQUATE FIRE PROTECTION IN THE ENTIRE CONSTRUCTION AREA FOR THE DURATION OF THE CONSTRUCTION PERIOD. REFER TO SPECIFICATION DIVISION 1, “ GENERAL REQUIREMENTS ” , “ FIRE SAFETY REQUIREMENTS ”.
12. THE ENTIRE EXISTING FIRE PROTECTION SYSTEM SHALL BE RESTORED TO FULL OPERATION AT THE END OF EACH WORKING
DAY.
13. ALL EXISTING FIRE ALARMS AND FIRE EXITS AND ANY OTHER ASPECT OF THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN IN FULL OPERATION. THE COST OF RESPONSE TO ANY FALSE ALARM AS CHARGED BY ANY LOCAL FIRE DEPARTMENT SHALL BE PAID
BY THE CONTRACTOR.
14. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, ALTHOUGH NO ATTEMPT WAS MADE TO SHOW EVERY OFFSET, FITTING, BEAM, PIPE SUPPORT. ANY CHANGES REQUIRED TO FIT EQUIPMENT, PIPING AND DUCTWORK, THAT IS NOT CLEAR FROM THE DESIGN DRAWINGS, SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE. THESE CHANGES ARE SUBJECT TO THE APPROVAL OF THE PROJECT A/E AND THE CONTRACTING OFFICER'S REPRESENTATIVE. THE CONTRACTOR'S RESPONSIBILITY FOR FIELD VERIFICATION OF MEASUREMENTS, EQUIPMENT AND UTILITIES PRIOR TO CONSTRUCTION IS REFERENCED IN NUMEROUS SECTIONS OF THE CONTRACT SPECIFICATIONS. ANY NEW WORK CHANGE REQUESTS BY THE CONTRACTOR, AS A RESULT OF ANY DEVIATION, WILL BE CONSIDERED ON A CASE-BY-CASE BASIS BY THE CONTRACTING OFFICER, WHO WILL MAKE THE DETERMINATION, BASED ON REVIEW OF THE DRAWINGS AND SPECIFICATIONS, AS TO WHAT IS FAIR AND REASONABLE TO BOTH THE GOVERNMENT AND THE CONTRACTOR.
15. THE WORK INCLUDES ALL ITEMS OF THE SPECIFICATIONS.
16. EXAMINATION OF SITE: THE CONTRACTOR SHALL VISIT AND CAREFULLY EXAMINE THE SITE OF ALL PROPOSED WORK AND
ACQUAINT HIMSELF/HERSELF WITH THE CONDITIONS UNDER WHICH WORK WILL BE PERFORMED AND THE NATURE AND EXTENT OF THE WORK INVOLVED, TO THE FULLEST EXTENT ALLOWABLE BY VA AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING BID. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO SUBMITTAL OF BID. THE CONTRACTOR SHALL MEET WITH VA/COR AT THE SITE PRIOR TO SUBMITTING A BID ON THIS PROJECT AND REVIEW ALL VA REGULATIONS AND BUILDING
PROCEDURES REQUIRED FOR THIS PROJECT.
17. DO NOT BEGIN FABRICATION, CUT ANY MEMBERS, OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND SHOP DRAWINGS SHALL BE AT THE CONTRACTOR ’ S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR ’ S EXPENSE AT THE REQUEST OF THE CONTRACTING OFFICER ’ S REPRESENTATIVE TO THE COMPLETE SATISFACTION OF THE
CONTRACTING OFFICER ’ S REPRESENTATIVE.
18. DO NOT PENETRATE OR CUT ANY STRUCTURAL MEMBERS NOT SPECIFICALLY SHOWN ON THE DRAWINGS (E.G., JOISTS, BEAMS, ETC.). IF STRUCTURAL MEMBERS CONFLICT WITH ROUTING, CONTACT THE CONTRACTING OFFICER ’ S REPRESENTATIVE FOR DIRECTION BEFORE PROCEEDING. EXERCISE CAUTION IN CUTTING CONCRETE FLOORS AND WALLS TO AVOID EXISTING
UTILITIES WHICH MAY BE LOCATED IN AND UNDER CONCRETE SURFACES.
19. THE CONTRACTOR SHALL PROVIDE NEW OPENINGS IN WALLS, FLOOR, AND ROOF, AND PATCH EXISTING OPENINGS IN CONJUNCTION WITH THE DEMOLITION AND INSTALLATION OF THE NEW BUILDING COMPONENTS, INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, AND GENERAL CONTRACTOR ’ S ITEMS. ALL NECESSARY FRAMING, COUNTER-FLASHING, ETC. SHALL BE
INCLUDED.
20. FOR ALL FLOOR, WALL, AND ROOF PENETRATION, VERIFY THE LOCATION OF THE (E) STRUCTURAL MEMBERS PRIOR TO DRILLING AND CUTTING, RELOCATE OPENINGS AS REQUIRED AND OFFSET DUCTS, PIPES, CONDUIT, ETC. AS APPROPRIATE. REVIEW THE
STRUCTURAL DRAWINGS IN THE ENGINEERING OFFICE.
21. WHERE THERE IS A CONFLICT ON THE PLANS, SPECIFICATIONS, NOTES, GENERAL NOTES, REFERENCES, PUBLICATIONS, CODES, ETC. WITH RESPECT TO MATERIALS, PRODUCTS, METHODS, WORKMANSHIP, PROCEDURE, EXECUTION, ETC. THE MOST STRINGENT OR BENEFICIAL TO THE OWNER AS DETERMINED BY THE CONTRACTING OFFICER ’ S REPRESENTATIVE SHALL BE UTILIZED OR INSTALLED. NO RELIEF OR EXTRA PAYMENT SHALL BE MADE TO THE CONTRACTOR BECAUSE OF THE
INTERPRETATION OF THE CONTRACTING OFFICER ’S REPRESENTATIVE.
22. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF THE APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE UNIFORM BUILDING MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER ’ S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS, AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE CONTRACTING OFFICER ’ S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE PLANS AND/OR SPECIFICATIONS, NOTIFY THE CONTRACTING OFFICER ’ S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION.
23. ALL EXISTING DUCTWORK, PIPING, CONDUIT, AND MECHANICAL, PLUMBING, AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE FACILITY. THE CONTRACTING OFFICER ’ S REPRESENTATIVE HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT FOR THE GOVERNMENT, IN WHICH CASE IT SHALL BE DELIVERED TO
THE LOCATION DESIGNATED BY THE CONTRACTING OFFICER’S REPRESENTATIVE.
24. CONTRACTOR SHALL IDENTIFY VALVES, POINTS OR CONNECTIONS TO BE ISOLATED AND NOTIFY THE COR PRIOR TO DISRUPTING ANY SERVICE. FOR EACH PHASE AND BEFORE INTERRUPTING ANY (E) UTILITY, DETERMINE, IN ADVANCE, IF ANY DOWNSTREAM SERVICE BEYOND THE CONSTRUCTION AREA OF THE PHASE WILL BE INTERRUPTED, AND PROPOSE MEANS AND METHODS TO PROVIDE A TEMPORARY SERVICE BYPASSING THE CONSTRUCTION AREA. THE CONTRACTOR'S RESPONSIBILITY FOR FIELD VERIFICATION OF MEASUREMENTS, EQUIPMENT AND UTILITIES PRIOR TO CONSTRUCTION IS REFERENCED IN NUMEROUS SECTIONS OF THE CONTRACT SPECIFICATIONS. ANY NEW WORK CHANGE REQUESTS BY THE CONTRACTOR, AS A RESULT OF ANY DEVIATION, WILL BE CONSIDERED ON A CASE-BY-CASE BASIS BY THE CONTRACTING OFFICER, WHO WILL MAKE THE DETERMINATION, BASED ON REVIEW OF THE DRAWINGS AND SPECIFICATIONS, AS TO WHAT IS FAIR AND REASONABLE TO BOTH
THE GOVERNMENT AND THE CONTRACTOR.
25. THE FLOOR AREAS BELOW OVERHEAD WORK, WHERE WELDING “HOT WORK” IS TO BE PERFORMED, SHALL BE CLEARED TO A MINIMUM DISTANCE OF 36 FEET (OR MORE BASED ON MOST STRINGENT BETWEEN FACILITY POLICY, MANUFACTURER'S RECOMMENDATIONS, OR NFPA 241) BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD “HOT WORK”. ALL FLAMMABLE MATERIALS SHALL BE CLEARED TO A DISTANCE 50 FEET (OR MORE BASED ON MOST STRINGENT BETWEEN FACILITY POLICY, MANUFACTURER'S RECOMMENDATIONS, OR NFPA 241) BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD “HOT WORK”.
26. EXISTING DUCTWORK, DOMESTIC COLD-WATER PIPING, DOMESTIC HOT WATER PIPING, CHILLED AND HEATING HOT WATER PIPING, WASTE, VENT, FIRE SPRINKLER LINES, FIRE ALARM EQUIPMENT, ELECTRICAL CONDUIT, TELEPHONE CONDUIT, COMMUNICATION CONDUIT, PNEUMATIC TUBING MAY HAVE TO BE RELOCATED TO FACILITATE THE INSTALLATION OF THE WORK.
THE CONTRACTOR MUST COORDINATE WITH THE CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE AND PROPOSE MEANS AND METHODS TO MAKE ANY NECESSARY CHANGES AND ADJUSTMENTS TO ACCOMPLISH THE WORK. THE CONTRACTOR'S RESPONSIBILITY FOR FIELD VERIFICATION OF MEASUREMENTS, EQUIPMENT AND UTILITIES PRIOR TO CONSTRUCTION IS REFERENCED IN NUMEROUS SECTIONS OF THE CONTRACT SPECIFICATIONS. ANY NEW WORK CHANGE REQUESTS BY THE CONTRACTOR, AS A RESULT OF ANY DEVIATION, WILL BE CONSIDERED ON A CASE-BY-CASE BASIS BY THE CONTRACTING OFFICER, WHO WILL MAKE THE DETERMINATION, BASED ON REVIEW OF THE DRAWINGS AND SPECIFICATIONS, AS
TO WHAT IS FAIR AND REASONABLE TO BOTH THE GOVERNMENT AND THE CONTRACTOR.
27. THE CONTRACTOR IS HEREBY NOTIFIED THAT SOME WORK MAY BE REQUIRED OUTSIDE OF THE AREAS SHOWN ON THESE DRAWINGS. THIS COULD INCLUDE CONTROL MODIFICATIONS OR CONNECTIONS AT REMOTE LOCATIONS, CONTROL PANELS, CPU’S.
28. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, TRANSITIONS, FITTINGS, AND ACCESSORIES THAT MAY BE REQUIRED. COORDINATE ALL THE WORK OF ALL THE TRADES TO INSURE ALL DUCTS, PIPES, CONDUITS, ETC. DO NOT CONFLICT AND CLEAR STRUCTURAL AND ARCHITECTURAL MEMBERS.
29. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE, INCLUDING WATER DAMAGE, TO PROPERTY AND EQUIPMENT CAUSED BY HIS
WORK THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD.
30. REMOVE T-BARS AND 2X4 CEILING PANELS AS REQUIRED FOR THE DEMOLITION AND THE INSTALLATION OF THE NEW WORK.
REINSTALL EXISTING OR REPLACE WITH NEW AS REQUIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER ’ S REPRESENTATIVE. FOR ANY HARD CEILING AREA, CUT AND DEMOLISH ENOUGH OF THE HARD CEILING TO DO THE WORK REQUIRED. REBUILD AND PATCH THE DEMOLISHED. FINISH AND PAINT TO MATCH EXISTING TO THE SATISFACTION OF THE
CONTRACTING OFFICER ’ S REPRESENTATIVE.
31. ALL VALVES, VOLUME DAMPERS, CONTROL DEVICES, VAR, ETC. SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.
32. ALL UL LISTED EQUIPMENT SHALL BE INSTALLED AS PER LISTING OR LABELING. MAXIMUM FUSE SIZES MEANS FUSE PROTECTION
REQUIRED.
33. PATCH AND PAINT TO MATCH EXISTING, ALL SURFACES DAMAGED BY THE DEMOLITION AND ALL OPENINGS NOT TO BE REUSED.
34. REPAIR DAMAGE TO CEILING, WALLS, ETC. TO THE SATISFACTION OF THE CONTRACTING OFFICER ’ S REPRESENTATIVE.
35. WHEN A DETAIL OR NOTE IS IDENTIFIED AS TYPICAL, THE CONTRACTOR IS TO APPLY THE DETAIL OR NOTE TO EVERY SIMILAR
CONDITION, WHETHER OR NOT THE REFERENCED DETAIL OR NOTE IS REPEATED OR REFERENCED.
36. WHERE NO CONSTRUCTION DETAIL IS INDICATED, SUCH WORK SHALL BE SIMILAR TO COMPARABLE WORK DETAILED OR NOTED
ELSEWHERE OR TO MATCH EXISTING CONDITIONS, SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER ’ S
REPRESENTATIVE.
37. ALL HOLES, VOIDS, AND DAMAGED OR UNEVEN SURFACES WHICH ARE CAUSED BY THE CONTRACTOR’S WORK AND WHICH REMAIN EXPOSED IN THE WALL, FLOOR, CEILING, OR OTHER SURFACES SHALL BE PATCHED, REPAIRED, AND BROUGHT FLUSH WITH THE ADJACENT CONSTRUCTION. SUCH SURFACES, NOT CONCEALED BY THE NEW CONSTRUCTION, SHALL MATCH IN EVERY RESPECT THE EXISTING NON-DAMAGED CONSTRUCTION. REMOVE EXISTING UTILITIES BACK BEHIND EXISTING SURFACES AND
CAP SO AS NOT TO INTERFERE WITH NEW PATCHES.
38. WHEREVER NEW WALL, FLOOR, OR CEILING FINISHES ARE INDICATED, THE CONTRACTOR SHALL BRING EXISTING ELECTRICAL, MECHANICAL, PLUMBING, AND OTHER BUILDING COMPONENTS FLUSH WITH THE NEW FINISHED SURFACES IF APPROPRIATE.
39. THE DEMOLITION SHALL INCLUDE ALL ASSOCIATED ANCHORAGES, HANGERS, SUPPORTS, BRACES, FASTENERS, MASTIC, MORTAR, LATH, AND RELATED ITEMS. THE EXISTING SUBSTRATE, INCLUDING CONCRETE, MASONRY, METAL FRAMING AND
FURRING SHALL BE REPAIRED WHERE DAMAGE BY THE CONTRACTOR’S WORK.
40. PROVIDE ALL VALVES, INSTRUMENTS, FITTINGS, ETC. AS SHOWN ON THE PIPING DIAGRAMS, SCHEMATICS, ETC. IT IS NOT POSSIBLE TO SHOW ALL VALVES, INSTRUMENTS, ETC. ON THE PLANS, HOWEVER, SELECTED VALVES HAVE BEEN SHOWN FOR REFERENCE. ALL VALVES SHALL BE ACCESSIBLE FROM THE FLOOR OR FROM FIXED PLATFORMS.
41. ALL NEW FIRE ALARM DEVICES INSTALLED IN HVAC EQUIPMENT SUCH AS SMOKE DETECTORS, SMOKE DAMPERS, FIRE/SMOKE
DAMPERS, ETC. SHALL BE CONNECTED TO THE MAIN FIRE ALARM PANEL.
42. ALL EQUIPMENT AND MATERIALS SUBJECT TO THE WEATHER THAT ARE NOT FACTORY PAINTED SHALL BE FIELD PAINTED AND WEATHER PROOFED WITH PRIMER, AND TWO COATS OF EXTERIOR PAINT. SEE THE SPECIFICATIONS. MATCH THE COLOR OF THE EXISTING BUILDING EXTERIOR. THE COLOR AND QUANTITY OF THE PAINT IS SUBJECT TO THE APPROVAL OF THE CONTRACTING
OFFICER ’ S REPRESENTATIVE. SUBMITTAL REQUIRED.
43. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CONTROL SYSTEM SHALL BE COMPLETE SUCH THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED, AND RESET FROM THE EXISTING FRONT END, AND VICE-VERSA. THE ENGINEER SHALL BE NOTIFIED WHEN EACH PHASE OF THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED, AND PUT INTO FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED. A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR ’ S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. SUBSEQUENT CONTROLS DEMONSTRATIONS AND VERIFICATIONS
WILL BE REQUIRED AT THE COMPLETION OF THE PROJECT.
ADDITIONAL GENERAL CONSTRUCTION NOTES
1. ALL NEW CONSTRUCTION WHICH ENGAGES AND ATTACHES TO THE EXISTING SHALL BE PROPERLY ALIGNED, CONNECTED, AND
MEMBERED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIR. PATCH TO MATCH ALL EXISTING CONSTRUCTION, ASSEMBLIES, DETAILS, AND FINISHES FOR ALL WALLS, FLOORS, AND CEILINGS AFFECTED BY THE CONSTRUCTION.
2. CONTRACTOR SHALL REPAIR AND PATCH ALL EXISTING WALL CONSTRUCTION WHERE CRACKS, DENTS, HOLES OR OTHER IMPERFECTIONS HAVE OCCURRED AND PREPARE SMOOTH SURFACE FOR NEW FINISH. ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED TO A "LIKE-NEW" CONDITION AS NOTED PRIOR TO THE VA/COR'S ACCEPTANCE OF THE WORK.
3. PROVIDE SILICONE SEALANT JOINTS AT JUNCTION OF ALL PLUMBING FIXTURES & COUNTERTOPS TO A WALL SURFACE.
4. DO NOT SCALE DRAWINGS. USE THE GIVEN DIMENSIONS. COORDINATE ALL SHOP DRAWING REQUIREMENTS.
5. REFERENCE ALL DRAWINGS IN ADDITION TO THE ARCHITECTURAL DRAWINGS IN DEFINING THE SCOPE OF WORK.
SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN OTHER
PORTIONS OF THE CONTRACT DOCUMENTS.
6. ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE MEMBERS SHALL NOT DAMAGE EXIST. REINFORCING STEEL. PRIOR TO CORING VERIFY SIZE AND LOCATIONS WITH X-RAY EQUIPMENT. COORDINATE ALL INFORMATION WITH THE VA/COR AND
OBTAIN HIS/HER APPROVAL BEFORE CORING.
7. PROJECT LIMIT LINES ARE SHOWN FOR ORIENTATION ONLY AND SHOULD NOT BE CONSTRUED TO BE COMPLETE. REFER TO OTHER DRAWINGS FOR ADDITIONAL DEMOLITION AND NEW CONNECTIONS, ETC. REQUIRED TO COMPLETE THE ENTIRE SCOPE OF
WORK.
8. INSTALL ALL DOORS WITH MINIMUM 18 INCHES CLEAR FROM INSIDE FACE OF LATCH SIDE OF JAMB TO FINISH FACE OF WALL OR
OBSTRUCTIONS ON PULL SIDE OF DOOR.
9. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING DEMOLITION AND CONSTRUCTION STAGES OF THE WORK. ALL FINISHED AREAS ADJACENT TO AND INCLUDED IN THE AREAS OF CONSTRUCTION SHALL BE PROTECTED FROM DUST AND DIRT THROUGH THE USE OF VA/COR
APPROVED DUSTPROOF PROTECTION.
10. EACH CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ALL CONCEALED WORK THAT DIFFERS FROM THE CONTRACT DRAWINGS SO THAT ACCURATE RECORD DRAWINGS/ AS-BUILTS CAN BE KEPT BY THE GENERAL CONTRACTOR AND PROVIDED
TO THE VA/COR FOR DISTRIBUTION AT THE COMPLETION OF THE PROJECT.
GENERAL REQUIREMENTS NOTES
1. ALL A.S.T.M. DESIGNATIONS SHALL BE AS AMENDED TO DATE.
2. THE CONTRACTOR SHALL VERIFY ALL PLANS, DIMENSIONS, SPECIFICATIONS AND SITE CONDITIONS AND HE/SHE SHALL NOTIFY
THE VA/COR OF ANY DISCREPANCIES BEFORE STARTING WORK.
3. ALL CONFLICTS OR CLARIFICATIONS REQUIRED BETWEEN THE VARIOUS ELEMENTS OF THE CONSTRUCTION DRAWINGS AND/OR
SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE VA/COR BEFORE PROCEEDING WITH ANY RELATED WORK.
4. NO STRUCTURAL CHANGES FROM THE APPROVED PLANS SHALL BE MADE IN THE FIELD DURING CONSTRUCTION WITHOUT
WRITTEN APPROVAL FROM THE VA/COR PRIOR TO MAKING SUCH CHANGES. IF CHANGES ARE MADE WITHOUT PRIOR WRITTEN APPROVAL, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR INVOLVED TO REPLACE OR REPAIR THE CONDITION AS DIRECTED BY THE VA/COR. THE VA/COR HAS NO AUTHORITY TO APPROVE STRUCTURAL CHANGES TO THE DRAWINGS WITHOUT
CONFIRMATION AND A SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER.
5. ALL MATERIALS, SUPPLIES AND EQUIPMENT SHALL BE INSTALLED AS PER THE DOCUMENTS ALONG WITH THE MANUFACTURER'S SPECIFICATIONS AND AS PER THE CODES, REGULATIONS AND VA REQUIREMENTS, FEDERAL AND STATION.
6. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF CONSTRUCTION DEBRIS AND SHALL THOROUGHLY CLEAN AND REMOVE ALL DEBRIS UPON COMPLETION OF FINAL WORK, INCLUSIVE OF ALL TRADES DESIGNATED HEREIN AS N.I.C.
7. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER BRACING OF PARTITION WALLS, ALL FRAMING, SOFFITS, DOOR OPENINGS, CONSTRUCTION, EQUIPMENT SUPPORTS, ETC.
8. RELOCATION OF DUCTS, PIPING, CONDUIT, ELECTRICAL BOXES WHICH MAY ALTER THE INTENDED ARCHITECTURAL OR STRUCTURAL CONSTRUCTION MUST BE APPROVED BY THE VA/COR AND AS SUCCESSFULLY REVIEWED BY THE
ARCHITECT/ENGINEER, PRIOR TO RELOCATION.
9. MECHANICAL CONTRACT DRAWINGS SHALL BE TAKEN IN A SENSE AS DIAGRAMMATIC. SIZE AND MEANS OF RUNNING PIPING ARE SHOWN BUT IT IS NOT INTENDED TO SHOW EVERY FITTING AND OFFSET, NOR EVERY STRUCTURAL DIFFICULTY THAT CAN BE
ENCOUNTERED DURING THE INSTALLATION OF THE WORK.
10. THE VA WILL CONTINUE TO OCCUPY THE EXISTING ADJACENT AREAS, FLOORS AND BUILDINGS WHERE CONSTRUCTION IS TO
OCCUR.
11. SIGNS: PROVIDE SIGNS ADEQUATE TO DIRECT ALL OCCUPANTS AND VISITORS. DO NOT INSTALL, OR ALLOW TO BE INSTALLED, UNTIL APPROVED BY THE VA/COR.
12. COORDINATION WITH OCCUPANTS:
12.1. OCCUPIED AREAS INCLUDE ALL AREAS IN WHICH THE VA'S REGULAR OPERATIONS WILL BE GOING ON OR TO WHICH
THE VA REQUIRES ACCESS DURING THE CONSTRUCTION PERIOD, WHETHER CONDUCTED BY THE VA/COR OR AS
AUTHORIZED BY THE COR.
12.2. SEPARATE OCCUPIED AND PUBLIC AREAS FROM CONSTRUCTION AREAS WITH DUST-PROOF TEMPORARY PARTITIONS AS CALLED FOR BY THE VA OR AS INCLUDED IN THE CONSTRUCTION DOCUMENTS. (SEE "OCCUPIED AREA PROTECTION PROTOCOLS AND AFTER HOURS REQUIREMENTS", CONSTRUCT BARRICADES AND/OR TEMPORARY
PARTITIONS.)
12.2.1. WHERE IT IS NECESSARY TO CONDUCT CONSTRUCTION OPERATIONS IN OCCUPIED AREAS, OBTAIN THE VA/COR'S APPROVAL OF THE TIME PERIOD, THE AREAS TO BE USED, AND THE MEANS OF SEPARATING THE WORK AND
CONSTRUCTION CIRCULATION FROM THE OCCUPANTS.
12.2.2. OBTAIN WRITTEN APPROVAL FROM THE VA/COR BEFORE INTERRUPTING EXISTING UTILITIES.
12.2.3. BYPASS CONNECTIONS: PROVIDE AS NECESSARY TO MAINTAIN FULL SERVICE TO ALL OCCUPIED AREAS.
12.2.4. NOTIFY THE VA/COR AT LEAST 72 HOURS IN ADVANCE OF CHANGEOVER.
13. REFERENCE CIVIL, MECHANICAL, FIRE PROTECTION, ELECTRICAL, FIREPROOFING, AND PLUMBING DRAWINGS IN ADDITION TO THE ARCHITECTURAL AND LIFE SAFETY DRAWINGS IN DEFINING THE SCOPE OF WORK. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN OTHER PORTIONS OF THE CONTRACT
DOCUMENTS.
GENERAL DEMOLITION NOTES
1. ALL REQUIRED DEMOLITION WORK IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE DEMOLITION PLANS.
2. WHEN THE FOLLOWING MUST BE MODIFIED, OTHER THAN AS CALLED FOR IN THE DOCUMENTS, PROVIDE ALTERNATE FACILITIES
ACCEPTABLE TO THE VA/COR:
2.1. EMERGENCY MEANS OF EGRESS.
2.2. PERFORM DEMOLITION SO AS TO PREVENT DAMAGE TO ADJACENT IMPROVEMENTS AND FACILITIES TO REMAIN.
2.3. PROVIDE PROTECTIVE MEASURES TO ENSURE FREE AND SAFE PASSAGE OF PERSONS TO AND FROM OCCUPIED
AREAS.
2.4. ERECT TEMPORARY PROTECTION SUCH AS PARTITIONS, DOOR UNITS, ENCLOSURES, WALKS, FENCES, RAILINGS, CANOPIES, ETC., WHERE REQUIRED BY THE VA/COR AND/OR AUTHORITIES HAVING JURISDICTION.
2.5. PROTECT WALLS, FLOORS, AND OTHER NEW OR EXISTING WORK FROM DAMAGE DURING DEMOLITION OPERATIONS.
2.6. STRUCTURAL SUPPORT: CONSTRUCT AND MAINTAIN SHORING, BRACING, AND SUPPORTS AS NECESSARY TO ENSURE
THE STABILITY OF STRUCTURES.
2.7. DAMAGES: WITHOUT COST TO THE VA AND WITHOUT DELAY, REPAIR ANY DAMAGES CAUSED TO FACILITIES TO
REMAIN.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DEMOLITION AND REMOVAL OF ALL ITEMS AS DIRECTED IN THE DRAWINGS AND SPECIFICATIONS. FINISHES AND EQUIPMENT THAT IS NOT SPECIFICALLY SHOWN OR CALLED FOR AS REQUIRED TO FACILITATE THE NEW CONSTRUCTION WORK INSIDE THE CONTRACT AREA, THE ADJACENT SPACES AND THE SPACES ABOVE AND BELOW. SOME ADDITIONAL ITEMS THAT MAY NOT BE SPECIFICALLY SHOWN ON THE DEMOLITION PLAN THAT ARE A PART OF THE DEMOLITION WORK, BUT NOT LIMITED TO, ARE CASEWORK, SHELVING, DOOR HARDWARE, MISC. HARDWARE, SIGNAGE, FLOORING, WALL BASE, WOOD GROUNDS, WALL COVERING MATERIALS, REMAINING MASTIC AND SEALANTS, EXPOSED ANCHORS
AND FASTENERS, FRAMING MATERIALS, CHAIR RAILS, BRACKETS, HOOKS, ETC.
4. REFER TO ALL ENGINEERING DOCUMENTS FOR THE REQUIRED SYSTEMS DEMOLITION AS WELL AS FOR IDENTIFYING EXISTING
PIPING, CONDUITS, DUCTWORK, ETC. TO REMAIN WITHIN AREAS OF DEMOLITION.
5. VERIFY EXISTING CONDITIONS AND PROMPTLY REPORT ANY DRAWING DISCREPANCIES TO THE VA/COR, BEFORE STARTING
WORK.
6. ALL CONSTRUCTION TO REMAIN THAT IS AFFECTED BY DEMOLITION SHALL BE PATCHED, PLASTERED, BE PROPERLY MEMBERED OR REPLACED ALIGNED AND REFINISHED SO AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIR.
7. REMOVE COMPLETELY ALL FLOOR FINISHES AND ASSOCIATED ADHESIVE, MASTIC OR SETTING BEDS IN PROJECT AREA AS REQUIRED FOR THE INSTALLATION OF NEW FLOOR FINISHES. LEAVE FLOOR LEVEL, SMOOTH AND PROPERLY PATCHED/REPAIRED
TO RECEIVE THE NEW FINISHES.
8. EXISTING WALLS WITHIN PROJECT AREA TO REMAIN: COMPLETELY REMOVE ALL EXISTING FINISHES, INCLUDING CERAMIC TILE, VINYL WALL COVERING, GROUT, MASTIC, WALL COVERING BACKING, WALL BASE, ADHESIVE ETC. UNLESS NOTED OTHERWISE.
LEAVE WALLS SMOOTH, LEVEL, AND PROPERLY PATCHED/REPAIRED TO RECEIVE THE NEW FINISHES.
9. DURING THE COURSE OF REMOVAL OF EXISTING FINISHES FROM ITEMS INDICATED TO REMAIN (FLOORS, WALLS, ETC.), AND THE SUBSTRATE BECOMES DAMAGED BEYOND REPAIR, REPLACE DAMAGE SECTION TO THE POINT WHERE NEW FINISHES CAN BE
APPLIED WITHOUT DETECTION OR ADVERSE AFFECTS OF DAMAGED AREAS.
10. WHERE WALLS HAVE BEEN REMOVED, FILL VOIDS IN FLOOR WITH CONCRETE FILL AS REQUIRED TO MATCH THE EXISTING PRIOR
TO PATCHING AND LEVELING FOR NEW FLOOR FINISHES.
11. REMOVE: UNLESS ITEMS ARE OTHERWISE INDICATED TO BE REINSTALLED OR SALVAGED, REMOVE AND SCRAP.
12. REMOVE AND REINSTALL: CAREFULLY REMOVE AND PROTECT FROM DAMAGE, ALL ITEMS INDICATED TO A PROTECTED STORAGE
ON SITE (COORDINATE WITH COR): CLEAN, SERVICE, PREPARE FOR SERVICE; REINSTALL IN THE SAME LOCATION (OR IN THE
LOCATION INDICATED).
13. REMOVE AND INSTALL NEW; REMOVE AND DISPOSE OF ITEMS INDICATED AND INSTALL NEW ITEMS IN THE SAME LOCATION (OR IN
THE LOCATION INDICATED).
14. REMOVE AND SALVAGE: ITEMS INDICATED TO BE SALVAGED WILL REMAIN THE VA'S PROPERTY, CAREFULLY REMOVE AND CLEAN ITEMS INDICATED TO BE SALVAGED; PACK OR CRATE TO PROTECT AGAINST DAMAGE; IDENTIFY CONTENTS OF CONTAINERS:
COORDINATE WITH VA/COR: DELIVER TO THE LOCATIONS INDICATED.
15. REMOVE AND SCRAP: REMOVE AND DISPOSE OF ITEMS INDICATED.
16. ITEMS OF VALUE TO THE CONTRACTOR: DO NOT STORE REMOVED ITEMS ON SITE.
17. EXISTING TO REMAIN: CONSTRUCTION OR ITEMS INDICATED TO REMAIN SHALL BE PROTECTED AGAINST DAMAGE DURING
DEMOLITION OPERATIONS. WHERE PRACTICABLE, AND WITH THE VA/COR'S PERMISSION, THE CONTRACTOR MAY ELECT TO REMOVE ITEMS TO A SUITABLE STORAGE LOCATION DURING DEMOLITION AND THEN PROPERLY CLEAN AND REINSTALL THE
ITEMS.
18. PERFORM WORK IN A SYSTEMATIC MANNER: PERFORM SELECTIVE DEMOLITION USING METHODS WHICH ARE LEAST LIKELY TO
DAMAGE WORK TO REMAIN AND WHICH WILL PROVIDE PROPER SURFACES FOR PATCHING.
19. REMOVE ALL DEBRIS DAILY.
BASIS OF DESIGN (BOD) PROTOCOLS
THE BASIS OF DESIGN (BOD) PROTOCOLS APPLY TO ALL SPECIFIED EQUIPMENT, CONSTRUCTION MATERIALS INDICATED AND ALL ASSEMBLY DETAILS CONTAINED WITHIN THE DRAWINGS / DOCUMENTS OR AS SPECIFICALLY REFERENCED BY SAME. SPECIAL ATTENTION NEEDS TO BE PAID TO EQUIPMENT AND MATERIAL PERFORMANCE CHARACTERISTICS ALONG WITH ALL DIMENSIONAL LOGISTICS FEATURES THAT AFFECT SIZE, PLACEMENT, REQUIRED CLEARANCES, SPACING, SERVICE ACCESS, DETAILING, CONNECTION VARIANCES, UTILITIES IMPACTS, WEIGHT, FINISHING (IF REQUIRED), AVAILABILITY, ETC., ALL OF WHICH WOULD NEED TO BE IDENTIFIED TO THE VA/COR AND ALL AFFECTED SUBCONTRACTORS ALONG WITH BEING FULLY COORDINATED BY THE PRIME CONTRACTOR IF DIFFERENT FROM THE BID / CONSTRUCTION
DOCUMENTS.
BASIS OF DESIGN (BOD) COMPLIANCE
1. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND CERTIFY THAT THE CHARACTERISTICS OF THE EQUIPMENT OR MATERIAL HE/SHE WILL BE SUBMITTING FOR REVIEW MEETS OR EXCEEDS THE CAPACITY AND DUTY REQUIREMENTS AS SPECIFIED IN ANY
OF THE "BASIS OF DESIGN" SPECIFICATIONS.
2. IF THE EQUIPMENT OR MATERIAL BEING SUBMITTED FOR REVIEW WILL REQUIRE THAT MODIFICATIONS NEED TO BE MADE, TO THE WORK OF THE PROVIDING CONTRACTOR, THE WORK OF OTHER CONTRACTORS, OR THE WORK OF THE VA THE SUBMITTING CONTRACTOR SHALL BE FULLY RESPONSIBLE TO ADVISE/INFORM THE PRIME CONTRACTOR OF ANY AND ALL SUCH NECESSARY IMPACTS AND POSSIBLE DELAYS AND/OR COSTS AS A PART OF THEIR BID AND CONSTRUCTION SCOPE OF WORK
RESPONSIBILITIES.
3. THE SUBMITTING CONTRACTOR WILL BE FULLY RESPONSIBLE TO COORDINATE ALL DEVIATIONS FROM THE "BASIS OF DESIGN" INTENT WITH THE GENERAL CONTRACTOR AND ALL AFFECTED SUB-CONTRACTORS. THE FINAL INSTALLATION SHALL NOT COMPROMISE ANY OF THE "BASIS OF DESIGN" PERFORMANCE CHARACTERISTICS NOR SHALL IT ENCUMBER ANY OF THE DESIGN
LAYOUT LOGISTICAL NECESSITIES.
4. THE FINAL INSTALLATION SHALL ALSO COMPLY WITH ALL APPLICABLE BUILDING CODES, REGULATIONS, VA REQUIREMENTS PLUS
ALLOW THE EQUIPMENT AND/OR MATERIALS TO FUNCTION PROPERLY AND SAFELY.
5. ALL MATERIALS OR EQUIPMENT EQUIVALENT SUBSTITUTIONS SHALL BE PROVIDED ON A CONTRACTOR PREPARED ITEMIZED LISTING PER SUBSTITUTION WITH A FULL AND DETAILED DESCRIPTION OF ALL SPECIFICATIONS AND KNOWN DEVIATIONS FROM
THE ORIGINAL BOD.
6. THE PRIME/GENERAL CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE VA/COR AT THE BEGINNING OF THE PROJECT, ALL SUCH KNOWN DEVIATIONS AND IMPACTS FROM THE SPECIFIC BASIS OF DESIGN SPECIFICATIONS BEFORE STARTING THE
PROJECT AND/OR THE SHOP DRAWING SUBMITTALS.
7. IF ANY UNKNOWN DEVIATIONS FROM THE BOD REQUIREMENTS SURFACE DURING THE CONSTRUCTION PHASE, NOTIFY THE VA/COR IMMEDIATELY AND IDENTIFY ALL IMPACTS FOR THE VA/COR'S EVALUATION AND POSSIBLE AUTHORIZATION.
8. IDENTIFY, VERIFY, COORDINATE AND SOLVE ALL IMPACTS TO BUILDING STRUCTURE, SURROUNDING ELEMENTS, AND SYSTEMS RESULTING FROM WEIGHT DIFFERENTIALS, REVISED LOADING CHARACTERISTICS, CONNECTION/MOUNTING VARIANCES, INSTALLATION CONFLICTS, DETAILING MODIFICATIONS, TIME DELAYS, ETC. CAUSED BY A BOD EQUIVALENT SUBSTITUTION.
OCCUPIED AREA PROTECTION PROTOCOLS AND AFTER-HOURS
REQUIREMENTS
WHEN PERFORMING WORK (DEMOLITION OR NEW) IN OCCUPIED SPACES, THE FOLLOWING PROTECTION PROTOCOLS WILL BE FOLLOWED ON
A DAILY BASIS UNLESS MODIFIED IN WRITING BY THE VA/COR ON A CASE-BY-CASE BASIS:
1. CAREFULLY MOVE/RELOCATE ANY SIGNAGE, FREE-STANDING AND WALL HUNG ITEMS THAT ARE IN THE AREA/ZONE WHERE THE WORK IS TO BE ACCOMPLISHED AND IN DANGER OF BEING DAMAGED BY THE PERFORMANCE OF THE WORK, INCLUDING DAMAGE THAT CAN BE CAUSED BY FALLING OBJECTS, DUST OR MOISTURE NOTE: THIS ALSO APPLIES TO THE DIRECT ACCESS ROUTE
THRU THE OCCUPIED AREA TO AND FROM THE ACTUAL WORK AREA/ZONE.
NOTE: THE VA WILL BE RESPONSIBLE TO MOVE/RELOCATE ANY FURNITURE, EQUIPMENT, BOXES, FILES, USER BELONGINGS, ETC. THAT WOULD BE IN THE AREA OF WORK AND OBSTRUCT/INTERFERE WITH THE PERFORMANCE OF
THE CONTRACTOR'S WORK. COORDINATE ALL REQUIRED VA RELOCATIONS WITH VA/COR.
2. CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE PREVENTION BARRIERS/COVERS FOR ALL SUCH ITEMS ADDRESSED ABOVE INCLUDING THE ADDITIONAL PROTECTION OF ALL WALL SURFACES/FINISHES, WINDOWS/GLAZING, DOORS, FRAMES, HARDWARE, CARPETING, FLOOR COVERINGS, WALL BASE, CEILING CONSTRUCTION, TILE, GRID, WALL ANGLES, LIGHT
FIXTURES, DIFFUSERS, GRILLES, ETC.
3. FLOOR FINISHES SHALL BE PROTECTED THROUGHOUT THE AREA WITH A 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN) TEMPORARY TARPAULIN(S)/DROP CLOTH(S) AS A MINIMUM FOR DUST, MOISTURE AND VERY LIGHT FOOT TRAFFIC
PROTECTION.
4. ALL MAIN TRAFFIC AREAS TO AND FROM ALONG WITH INSIDE THE WORK ZONE/AREAS SHALL HAVE ADDITIONAL PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/16" TEMPERED HARDBOARD (MASONITE) 4'X8' PANELS. ALL MASONITE PANELS SHALL BE FIRMLY HELD TOGETHER AND SECURED IN PLACE VIA THE USE OF AN INDUSTRY APPROVED 2" HEAVY DUTY CONSTRUCTION ADHESIVE TAPE, INTENDED FOR THIS APPLICATION NOTE: ALL BOARD TO BOARD JOINTS WILL BE FULLY TAPED THE LENGTH OF THE JOINT AND ALL BOARD TO VISQUEEN JOINTS WILL BE TAPED AT 4' ON CENTER WITH A MINIMUM 8" LENGTH OF TAPE.PAINTERS TAPE AND/OR MASKING TAPE ARE NOT CONSIDERED EQUIVALENTS TO THE HD CONSTRUCTION ADHESIVE TAPE BEING SPECIFIED.
5. CONSTRUCT A TEMPORARY FULL HEIGHT, FULLY SEALED, CONTAINMENT ENCLOSURE AROUND ALL CONSTRUCTION AREAS/ZONES IN ORDER TO CONTAIN AS MUCH DUST AND DEBRIS AS POSSIBLE DURING THE PERFORMANCE OF ANY
DEMOLITION, CONSTRUCTION AND CLEAN-UP WORK
6. THE TEMPORARY FULL HEIGHT CONTAINMENT ENCLOSURES SHOULD BE CONSTRUCTED OF A MINIMUM 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN) WITH THE USE OF THE APPROPRIATE TELESCOPICALLY ADJUSTABLE ALUMINUM OR METAL VERTICAL SPRING-LOADED SUPPORT STUDS/POLES. FULL HEIGHT FOAM PADDED RAILS, PRESSURE FIT AT ALL PERIMETER WALL/PARTITION CONNECTION CONDITIONS ARE TO BE UTILIZED IN ORDER TO MINIMIZE THE USE OF TAPE SEALS ON
ALL FINISHED WALL SURFACES
7. WHEN ALL WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC LOCATION(S), SCHEDULED TASKING AND IDENTIFIED PERIOD OF TIME THE ENTIRE AREA IS TO BE FULLY CLEANED-UP, ALL TEMPORARY CONTAINMENT ENCLOSURES AND PROTECTION REMOVED. NOTE: FULLY CLEANED-UP MEANS COMMERCIALLY VACUUM CLEANED WITH ALL SURFACES BEING FULLY WIPED
DOWN AND DUST FREE AS ACCEPTED PRIOR TO THE CONTRACTORS WORK
8. ALL SPACES WILL BE RETURNED TO THE USER, BY THE CONTRACTOR, AS A COMMERCIALLY CLEAN ENVIRONMENT WITH ALL OPEN CONSTRUCTION SURFACES SEALED WITH TEMPORARY CONSTRUCTION MATERIALS INCLUDING THE USE OF 6 MIL HEAVY DUTY REINFORCED POLY SHEETING (VISQUEEN), IN ORDER TO AVOID DUST PARTICLES FROM THE CONSTRUCTION AREA
MIGRATING INTO THE OCCUPIED USERS AREA/SPACE/ROOM(S)
9. UNLESS DIRECTLY SPECIFIED AND CONFIRMED BY THE VA/COR, ALL TEMPORARY PROTECTION AND ENCLOSURES ARE TO BE SET-UP AND KNOCKED DOWN ON A DAILY BASIS SUCH THAT THE USERS OF THE OCCUPIED AREAS ARE NOT TO BE INCONVENIENCED AND PREVENTED FROM FUNCTIONING WITHIN THEIR PACE/AREA/ROOM(S) DURING THEIR NORMAL BUSINESS
HOURS OF OPERATION.
THE GENERAL NOTES
ON THIS SHEET APPLY
TO ALL DISCIPLINES.
CONTRACTORS ARE TO REVIEW THE GENERAL NOTES
SHEET THOROUGHLY, AS THERE HAVE BEEN SIGNIFICANT
REVISIONS AND ADDITIONS TO THE GENERAL NOTES.
FD FD
WOMEN'S TOILET
C209
MEN'S TOILET
C207
DIETICIANS
C258
OI&T
C264
INGREDIENT
STORAGE
C205D
KITCHEN
FACILITY
C205
NOURISHMENT/
SNACK PREP
C205I
DISH ROOM
C205J
ELEV. LOBBY
B200
SHAFT
203A
TOILET
B204
SECTION CHIEF
C205G
MANAGER
C260
SALAD PREP
C205F
CALL CENTER
C205H
CART WASH
C205K
TRAINING ROOM
C205C
CHIEF N&FS
C262
COOLER
C205B
FREEZER
C205E
TRAVEL DISTANCE
151'
TRAVEL DISTANCE
172'
EXIST
STAIR
EXIST
STAIR
EXIST
STAIR
MECH
C205A
ZONE 28 FLOW AND
TAMPER SWITCHES
NOTE: ZONE 29 FLOW AND
DAMPER SWITCHES ARE IN
THE BACK STAIRCASE.
OFFICE
C205N
LIFE SAFETY LEGEND
2 HOUR FIRE RATED
SMOKE BARRIER
TRAVEL DISTANCE/PATH OF EGRESS
EXIT
AREA NOT IN CONTRACT
Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation
Step One:
Using the following table, identify the Type of Construction Project Activity (Type A-D)
TYPE A Inspection and Non-Invasive Activities.
Includes, but is not limited to:
removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet painting (but not sanding) wallcovering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE B Small scale, short duration activities which create minimal dust Includes, but is not limited to:
installation of telephone and computer cabling access to chase spacescutting of walls or ceiling where dust migration can be controlled.
TYPE C Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
sanding of walls for painting or wall covering removal of floorcoverings, ceiling tiles and casework new wall construction minor duct work or electrical work above ceilings major cabling activities any activity which cannot be completed within a single workshift.
TYPE D Major demolition and construction projects Includes, but is not limited to:
activities which require consecutive work shifts requires heavy demolition or removal of a complete cabling system new construction.
Step Two:
Using the following table, identify the Patient Risk Groups that will be affected.
If more than one risk group will be affected, select the higher risk group:
Low Risk Medium Risk High Risk Highest Risk
• Office areas •
Cardiology Echocardiography Endoscopy Nuclear Medicine Physical Therapy Radiology/MRI Respiratory Therapy
CCU
Emergency Room Labor & Delivery Laboratories (specimen) Medical Units Newborn Nursery Outpatient Surgery Pediatrics Pharmacy Post Anesthesia Care Unit Surgical Units
Any area caring for immunocompromised patients Burn Unit Cardiac Cath Lab Central Sterile Supply Intensive Care Units Negative pressure isolation rooms Oncology Operating rooms including C-section rooms
Step Three: Match the Patient Risk Group (Low, Medium, High, Highest ) with the planned … Construction Project Type (A, B, C, D) on the following matrix, to find the … Class of Precautions (I, II, III or IV) or level of infection control activities required.
IC Matrix - Class of Precautions: Construction Project by Patient Risk
Construction Project Type Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that Class III or Class IV control procedures are necessary.
Patient Risk Group TYPE A TYPE B TYPE C TYPE D LOW Risk Group I II II III / IV MEDIUM Risk Group I II III IV HIGH Risk Group I II III / IV IV HIGHEST Risk Group II III / IV III / IV IV
DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
C
LA
SS
IV
APPLICABLE CODES
THE VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT THE VA FOLLOWS ON ITS PROJECTS:
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE
ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
INTERNATIONAL BUILDING CODE (IBC)
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
NATIONAL ELECTRIC CODE (NEC)
INTERNATIONAL PLUMBING CODE
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE
(PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318) MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATIONS STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULIT-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU) EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT.
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER
CONSTRUCTION SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1.
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF
DIRT & DEBRIS ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA-FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS
BEING PERFORMED.
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, I.E., SHEETROCK, PLYWOOD, PLASTIC, TO
SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
(CART WITH PLASTIC COVERING & SEALED CONNECTION TO WORK SITE WITH
HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION
BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORKSITE UTILIZING
HEPA-EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE; OR THE CAN WEAR CLOTH OR PAPER COVERALLS
THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY SAFETY MANAGEMENT & INFECTION CONTROL & THOROUGHLY
CLEANED BY ENVIRONMENTAL MANAGEMENT.
WATER INFECTION CONTROL RISK ASSESSMENT (WICRA)
C
LA
SS
IV
1. ISOLATE WATER SYSTEM IN AREA WHERE WORK IS BEING PERFORMED.
2. POST NOTICES PROHIBITING THE USE OF WATER FROM FIXTURES IMPACTED BY THE WORK.
3. DO NOT REMOVE NOTICES UNTIL APPROVED BY INFECTION CONTROL DEPARTMENT.
4. FLUSH COLD AND HOT WATER FROM EACH AFFECTED FIXTURE UNTIL NO DISCOLORATION IS OBSERVED.
5. PERFORM A HYPER-OXIDATION TREATMENT AND DOCUMENT RESULTS.
6. COLLECT WATER SAMPLES FOR LEGIONELLA CULTURE:
A. LESS THAN 10 OUTLETS, 1 SAMPLE FROM EACH OUTLET.
B. MORE THAN 10 OUTLETS, MINIMUM OF 10 REPRESENTATIVE OUTLETS.
7. DO NOT ALLOW WATER USE UNTIL TEST RESULTS ARE RETURNED AND SYSTEM IS SAFE TO OPEN FOR CONSUMPTION.
8. FLUSH EACH OUTLET FOR 1 MINUTE AT LEAST 5 DAYS OUT OF EVERY 7 DAYS UNTIL TEST RESULTS ARE RETURNED.
9. REMOVE NOTICES PROHIBITING USE OF WATER.
KITCHEN
FACILITY
C205
STAIRS
STAIRS
SPRINKLER ZONE 28
SPRINKLER ZONE 29
CODE CONFORMANCE
1/8" = 1'-0"1 CODE CONFORMANCE PLAN
AREA OF WORK 9,037 SQUARE FEET
APPLICABLE CODE 2018 NFPA 101
OCCUPANCY CLASSIFICATION CHAPTER 19 EXISTING HEALTH CARE OCCUPANCIES
CHAPTER 18 NEW HEALTH CARE OCCUPANCIES
FIRE PROTECTION FULLY SPRINKLERED
COOKING FACILITIES PROTECT IN ACCORDANCE WITH NFPA 96
OCCUPANT LOAD KITCHEN 100 SF/PERSON 6,470 /100 = 65 OCCUPANTS
TRAVEL DISTANCE 200 FT
COMMON PATH OF TRAVEL 100 FT
DEAD END CORRIDORS 30 FT
INTERIOR FINISHES NEW FINISHES SHALL BE CLASS A
SMOKE COMPARTMENT 40,000 SQ FT WHERE NO PATIENT SLEEPING AREAS
FIRE RESISTANCE REQUIREMENTS :
EXISTING RATED FIRE BARRIERS AND NON-RATED SMOKE BARRIERS ARE SHOWN AS PER VAMC SYRACUSE BUILDING NO. 1 LIFE SAFETY DRAWING REVISED APRIL 2019. EXISTING BARRIERS ARE MAINTAINED BY THE
WORK OF THIS PROJECT.
CODE DESIGN CRITERIA
SPRINKLER ZONE KEY PLAN:
SYMBOL LEGEND:
KEY PLAN: SECOND FLOOR
PLAN
NORTH
PROJECT
AREA
BACK STAIRWELL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
ARCHITECT:
Project Director
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
C&S Companies 499 Col Eileen Collins Blvd Syracuse, New York, 13212
(315) 455-2000
SYRACUSE VA MEDICAL CENTER
528A7-18-716
BUILDING 1
08/25/2023 DW JD
KITCHEN CONSULTANT:
Commercial Kitchen Consulting 747 Conklin Road Binghamton, New York 13903
(607) 217-5389
100% CONSTRUCTION
DOCUMENTS
RENOVATE MAIN KITCHEN
G-101R
NOTE:
REFER TO QC-102R FOR REVISED FURNITURE PLAN, UPDATED EQUIPMENT
PLAN, UPDATED ROOM FUNCTIONS, AND UPDATED FLOOR PLANS.
GENERAL NOTES TO CONTRACTORS
A. ALL WORK SHALL BE COMPLETED ACCORDING TO ALL APPLICABLE CODES
AND VA REQUIREMENTS.
B. EACH CONTRACTOR SHALL HAVE PUBLIC LIABILITY, PROPERTY DAMAGE AND
WORKMAN'S COMPENSATION INSURANCE. CONSULT VA FOR EXACT
COVERAGE REQUIRED.
C. EACH CONTRACTOR SHALL COORDINATE WITH ALL OTHER…