528A7-18-716 Renovate Main Kitchen Plans Revisions by Sheet Number.docx

DOCX document 303 KB Posted

Attached to
Z1DA--NRM-CONST 528A7-18-716 RENOVATE MAIN KITCHEN
Solicitation number
36C24223B0017
Issued by

View the file

Other files

File Type Posted
36C24223B0017 0010.docx DOCX document
18-VAMC-SYR VA Mech Schedules _ Details (M-501R).pdf PDF
140-CEILING-2ND FL UNIT A FLOOR PLAN 1-C-13-AUG.pdf PDF
29AUG23_VAMC-RFI REVISIONS - FULL DRAWING SET.pdf PDF
36C24223B0017 0009.docx DOCX document
29AUG23_VAMC-RFI REVISIONS_528A7-18-716_Kitchen_Specifications.pdf PDF
116-HVAC 2ND FL UNIT A FLOOR PLAN 1-H-13-8-16-23.pdf PDF
046-FIRE PROTECTION-2ND FL UNIT A FLOOR PLAN 1-FP-13-8-16-23.pdf PDF
058-ELECTRICAL-LIGHTING and SIGNAL-2ND FL UNIT A FLOOR PLAN 1-E-28-8-16-23.pdf PDF
019-PLUMBING-2ND FL UNIT A FLOOR PLAN 1-P-13-8-16-23.pdf PDF
36C24223B0017 0008.docx DOCX document
15AUG23_VAMC-RFI REVISIONS - FULL DRAWING SET.pdf PDF
024-24 of 190 FRONT -NORTH - and REAR - SOUTH ELEVATIONS_1-24-8-16-23.pdf PDF
15AUG23_VAMC-RFI REVISIONS_528A7-18-716_Kitchen_Specifications.pdf PDF
36C24223B0017 0007.docx DOCX document
36C24223B0017 0006.docx DOCX document
36C24223B0017 0005.docx DOCX document
528A7-18-716 Renovate Main Kitchen Specifications_Revised_V4.pdf PDF
36C24223B0017 0004.docx DOCX document
36C24223B0017 0003.docx DOCX document
046-FIRE PROTECTION-2ND FL UNIT A FLOOR PLAN 1-FP-13.pdf PDF
RFI Q and A- Renovate Main Kitchen- 27 June 23.docx DOCX document
528A7-18-716 Renovate Main Kitchen Drawings_Revised_V4.pdf PDF
024-24 of 190 FRONT (NORTH) _ REAR (SOUTH) ELEVATIONS. 1-24 - Copy.pdf PDF
019-PLUMBING-2ND FL UNIT A FLOOR PLAN 1-P-13.pdf PDF
140-CEILING-2ND FL UNIT A FLOOR PLAN 1-C-13.pdf PDF
36C24223B0017 0002.docx DOCX document
528A7-18-716 Renovate Main Kitchen Drawings_Revised_V2.pdf PDF
36C24223B0017 0001.docx DOCX document
528A7-18-716 Renovate Main Kitchen Specifications_Revised_V2.pdf PDF
528A7-18-716_08M_MECH-ALT_528A7-21-SL01.pdf PDF
528A7-18-716 Renovate Main Kitchen Specifications_Revised_V2 02.pdf PDF
NY20220026.pdf PDF
36C24223B0017_1.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

528A7-18-716 RENOVATE MAIN KITCHEN –PLAN REVISIONS BY SHEET NUMBER – REVIEW FIRST General Note:

Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans. Note that wall shown to be demolished between C-203 and B-266 is now to remain which results in slightly smaller floor plan for new C-205H. No architectural work will be required in C-203 electrical closet. Any work shown on plans for C-201 is no longer required.

T-100:G-102, H-101, QC-101 and QC-102 have been superseded/changed to G-102R, H-101R, QC-101R and QC-102R in the plans set.
G-101:* Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

AD101

Note minor architectural demo eliminations.

A101

1) Eliminate new walls and doors associated with C201, C203A and C205H

2) Eliminate Refrigerator and Fixed Countertop from Existing C261/New C205C

* Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

A-102: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

A701 Signage schedule:

Training Room C205C/Existing Call Center C261 will be retitled “Call Center C205C”

1) What is labeled (C205H Call Center and C205N)/(Existing B266 Super Offices/B264 STOR) will be the new “C205H Supervisor Workstations”

2) Existing salad prep area/supv office C202E/C265A will become “C205F Employee Area”

* Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

FX-101

1) Delete general note #4, i.e., FLEXIBLE SPRINKER DROPS ARE PERMITTED.

* Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

M-101: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

M-102: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

M-103: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

ED-101

1) Delete keyed notes 11 and 16 E-101

1) EEQ2C-B relocate to C203

2) ELS2A-A remains as is

3) Replace keyed note 2 with the following: Replace existing 2 Section panel E2BA with single section surface mount panelboard and relocate to small closet on opposite side of where E2BA-1 breaker was located. E2BA-1 circuits to be relocated to E2BA. Existing panelboard boxes to remain and be used as junction boxes. Provide new screw covers over existing panelboard boxes and E2BA-1 enclosed breaker box.

4) No work in C201

5) Add (4) data lines coiled in ceiling with 10’ extra length opposite C205H and above existing tray line.

* Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

E-501

1) “Kitchen conveyor” circuit currently shown in 2CE to be re-fed out of new EEQ2C-B.

P-101: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

P-301: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

QC-101: QC-101 is superseded by QC-101R QC-102: QC-102 is superseded by QC-102R QC103: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

QC104: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.

QC105: * Please refer to QC-102R for revised furniture plan, updated equipment plan, updated room functions, and updated floor plans.