WY FLAP SHE 26(1), Red Grade Road, Phase 1

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF25B000010
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Wyoming 82831, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking construction services for the rehabilitation, widening, and realignment of Red Grade Road (County Road 26/USFS Route FSR 26) in Wyoming through the Federal Lands Access Program. The project spans approximately 2.6 miles and aims to improve access to Bighorn National Forest and Bureau of Land Management lands while addressing substandard roadway sections, geometrics, and safety issues. Key contract requirements include site inspection prior to bid submission, compliance with the Federal Highway Administration's Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), implementation of a Stormwater Pollution Prevention Plan, completion of nest surveys, and use of the Masterworks web-based system for project documentation. The solicitation will be advertised after January 1, 2026, with the formal invitation for bids expected to be posted to SAM.gov in December 2025. Offerors must submit questions and requests for information prior to the January 8, 2026 deadline, though this pre-solicitation notice is not itself an invitation for bid and final plans and specifications remain unavailable at this time.

This procurement carries no set-aside designation and has no identified incumbent contractor. The project is structured with two primary schedules and one optional task: Schedule A encompasses 1.8 miles of the most difficult work involving large cuts and retaining walls with a completion date of November 4, 2027, while Schedule B covers the full 2.6-mile project with completion by November 10, 2027, and Option X includes rehabilitation of the Aspen's Parking Lot. Construction is anticipated to begin in May 2026 and conclude in November 2027 with a winter shutdown, with work performed at high altitude between 7,000 and 8,000 feet in mountainous terrain. Principal work items include clearing and grubbing of 33.80 acres and roadway excavation of approximately 29,000 cubic yards, along with retaining walls, culvert installation, drainage improvements, and placement of crushed aggregate base surfacing. The specific contract value or budget range has not been disclosed in this pre-solicitation notice.

Notice text

3 versions

Update #3 · Latest ·

The project should be advertise after the New Year.  Thank you for your continued interest in the project.

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

PROJECT NUMBER:  WY FLAP SHE 26(1)

PROJECT NAME:  Red Grade Road, Phase 1

PROJECT DESCRIPTION:  The purpose of this project is to improve access to the Bighorn National Forest and Bureau of Land Management (BLM) lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to US Highway 14. The project will address the substandard roadway typical section, geometrics, and safety issues.

SCOPE OF THE WORK: This total project length is approximately 2.6 miles. The plans include two schedules and one option:

  • Schedule A is approximately 1.8-miles (~MP 1.0 to MP 2.8) and includes the majority of large cuts and retaining walls.
  • Schedule B is approximately 2.6-miles (~MP 1.0 to MP 3.6), which includes the limits of schedule A and the remaining 0.8-miles.
  • Option X includes the rehabilitation of the Aspen’s Parking Lot at ~MP 2.7

The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.

ANTICIPATED SCHEDULE:  It is anticipated construction will begin May 2026 and end November 2027 with a winter shutdown.

The work will be performed at high altitude (approximately 7,000 to 8,000 feet above sea level). Red Grade Road is closed to vehicles generally November through May because of snow. The road remains opened to tracked vehicles during this winter shutdown.

The contractor will be allowed to close the road to public traffic on weekdays from 8 am to 12 pm and from 1 pm to 6 pm during construction.

ESTIMATED COST RANGE: The estimated cost is $10,000,000 to $20,000,000.

Update #2 ·

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

PROJECT NUMBER:  WY FLAP SHE 26(1)

PROJECT NAME:  Red Grade Road, Phase 1

PROJECT DESCRIPTION:  The purpose of this project is to improve access to the Bighorn National Forest and Bureau of Land Management (BLM) lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to US Highway 14. The project will address the substandard roadway typical section, geometrics, and safety issues.

SCOPE OF THE WORK: This total project length is approximately 2.6 miles. The plans include two schedules and one option:

  • Schedule A is approximately 1.8-miles (~MP 1.0 to MP 2.8) and includes the majority of large cuts and retaining walls.
  • Schedule B is approximately 2.6-miles (~MP 1.0 to MP 3.6), which includes the limits of schedule A and the remaining 0.8-miles.
  • Option X includes the rehabilitation of the Aspen’s Parking Lot at ~MP 2.7

The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.

ANTICIPATED SCHEDULE:  It is anticipated construction will begin May 2026 and end November 2027 with a winter shutdown.

The work will be performed at high altitude (approximately 7,000 to 8,000 feet above sea level). Red Grade Road is closed to vehicles generally November through May because of snow. The road remains opened to tracked vehicles during this winter shutdown.

The contractor will be allowed to close the road to public traffic on weekdays from 8 am to 12 pm and from 1 pm to 6 pm during construction.

ESTIMATED COST RANGE: The estimated cost is $10,000,000 to $20,000,000.

Update #1 ·

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

PROJECT NUMBER:  WY FLAP SHE 26(1)

PROJECT NAME:  Red Grade Road

PROJECT DESCRIPTION:  The purpose of this project is to improve access to the Bighorn National Forest and BLM lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to Highway US 14. The project will address the substandard roadway typical section, geometrics, and safety issues.

SCOPE OF THE WORK: This total project length is approximately 2.6 miles. The plans include two schedules and one option:

  • Schedule A is approximately 1.8-miles (~MP 10.0 to MP 11.8) and includes the most difficult work of large cuts and retaining walls.
  • Schedule B is approximately 2.6-miles (~MP 10.0 to MP 12.6), which includes the limits of schedule A and the remaining 0.8-miles.
  • Option X includes the rehabilitation of the Aspen’s Parking Lot.

The proposed roadway will vary from 22-foot wide (two 10-foot lanes and 1-foot shoulders) to 18-foot total where geometry does not allow widening. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.

PRINCIPAL WORK ITEMS:

Line Item                                                                       Unit                                       Estimated Quantity

Clearing and grubbing                                                  ACRE                                    33.80

Roadway excavation                                                    CUYD                                   29,000

Placed rip rap, method A, Class 1                                CUYD                                   2,150

Special rock embankment                                            CUYD                                   1,500

Rock buttress                                                               CUYD                                   1,210

Rockery                                                                        SQFT                                     6,520

Roadway aggregate, method 2                                    TONS                                    7,700

Concrete headwalls                                                      EACH                                   18

12-Inch Pipe culvert                                                      LNFT                                     125

18-Inch Pipe culvert                                                      LNFT                                     45

24-Inch Pipe culvert                                                      LNFT                                     800

36-Inch Pipe culvert                                                      LNFT                                     100

Placing conserved topsoil                                             ACRE                                    13.0

Temporary traffic control, flagger                                  HOUR                                  10,300

ANTICIPATED SCHEDULE:  It is anticipated construction will begin May 2026 and end November 2027 with a winter shutdown.

The work will be performed at high altitude (approximately 7,000 to 8,000 feet above sea level). Red Grade Road is closed to vehicles generally November through May because of snow. The road remains opened to tracked vehicles during this winter shutdown.

The contractor will be allowed to close the road to public traffic on weekdays from 8 am to 12 pm and from 1 pm to 6 pm during construction.

ESTIMATED COST RANGE: The estimated cost is $10,000,000 to $20,000,000.

Attachments

Show all 12

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
WY FLAP SHE 26(1), Red Grade Road, Phase 1 Award Award Notice
WY FLAP SHE 26(1), Red Grade Road, Phase 1 Latest solicitation Solicitation
Pre Bid Meeting -WY FLAP SHE 26(1), Red Grade Road, Phase 1 Special Notice
Pre- Bid Meeting - WY FLAP SHE 26(1), Red Grade Road, Phase 1 Special Notice
WY FLAP SHE 26(1), Red Grade Road, Phase 1 This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity