WY Red Grade Road Final Pavement Memo Signed.pdf
PDF 4 MB Posted
- Attached to
- WY FLAP SHE 26(1), Red Grade Road, Phase 1 Federal contract opportunity
- Solicitation number
- 6982AF25B000010
About this file
This memorandum provides pavement structural section recommendations for the WY FLAP SHE 26(1) Red Grade Road project in Sheridan County, Wyoming. The project involves improving a 2.61-mile section of road between Mileposts 0.95 and 3.56, currently a dirt road without gravel surfacing. The road provides access to the Bighorn National Forest, BLM units, and state and private lands, and is characterized by tight curves, steep grades (up to 19%), and significant erosion issues.
Geotechnical investigations conducted in May 2022 and September 2023 revealed predominantly silty and clayey gravels with sand and silty sands. The recommended surfacing is 4 inches of crushed aggregate base, designed using the South Dakota Catalog Method for a "high" subgrade support condition with less than 5 trucks per day. The project aims to widen the road by up to 5 feet, improve geometry and site distance, enhance drainage, and add gravel surfacing. One subgrade sample was found to be corrosive with low resistivity and high chlorides, prompting specific considerations for material selection and construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA _11.25.25.pdf | ||
| QnA _11.18.25.pdf | ||
| WY_26(1)_Red Grade Road_Hydraulics Memo.pdf | ||
| WY FLAP SHE 26(1) Red Grade Road Geotech Rpt FINAL Apr 2025.pdf | ||
| DRAFT WY FLAP SHE 26(1) SCR.pdf | ||
| PRE BID MEETING ATTENDEES 11 13 2025 WY FLAP SHE 26(1) RED GRADE ROAD PHASE 1.pdf | ||
| DRAFT WY FLAP SHE 26(1) Cross Sections.pdf | ||
| FP-14_Eng.pdf | ||
| WY FLAP SHE 26(1) Plans DRAFT.pdf | ||
| UPDATED 11 06 2025 Pre Bid Meeting WY FLAP SHE 26(1) Red Grade Road Phase 1.pdf | ||
| Pre Bid Meeting WY FLAP SHE 26(1) Red Grade Road Phase 1.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Memorandum
Subject:
WY FLAP SHE 26(1)
Red Grade Road Final Surfacing Recommendations
Date: August 27, 2024
From: Robert Norick
Through:
Pavement & Materials Engineer
Mike Voth Supervisory Materials Engineer
To: Julia Dietsch, PM Matthew Steiner, Lead Designer
Project Description:
This memorandum provides the pavement structural section recommendations for the WY FLAP SHE 26(1) Red Grade Road (County Road 26 and US Forest Service Route FSR 26) between Mileposts 0.95 and 3.56 (Stations 149+00 to 282+40) in Sheridan County, Wyoming (see attached county map and site map with mileposts and stationing, respectively ). The project is located approximately 15 miles southwest of the City of Sheridan. The road provides access to the Bighorn National Forest and BLM units, as well as, state and private land and is currently a”dirt” road without any gravel surfacing.
This section of the road is 13 to 18 feet wide with tight curves and steep grades (as steep as 19%) and is closed during the winter. With the steep grades, the road has a tendency to erode, ravel (loss of aggregate), and washboard; exposing underlying boulders and rock in the process. The road degrades into a four wheel drive road and vehicles must drive slowly to avoid bottoming out. As such, the road has a very low level of traffic with the only trucks being associated with road maintenance (road graders and dump trucks). The project proposes to widen this section of road by as much as 5 feet, provide the required geometry and site distance, improve the drainage, and add gravel surfacing.
Pavement Investigation:
On May 19, 2022, a pavement investigation was conducted for the project consisting of two test pits along the west edge of the road at Mileposts 1.4 and 2.4. Two bulk subgrade samples were collected and submitted to the CFLHD lab for testing to determine the soil classifications (see attached lab report and photos). Both samples were found to be silty sands with gravel (ASTM SM soils).
On September 19, 2023, a follow-up geotechnical investigation was conducted consisting of eight shallow borings (up to 5 foot deep) using a truck mounted drill rig with a 4-inch hollow stem auger. Eight bulk subgrade samples were collected and submitted to the CFLHD lab for testing to determine the soil classifications (see attached boring log and lab report). The geotechnical investigation found the subgrade soils to consist predominantly of silty and clayey gravels with sand and silty sands with gravel (ASTM GM, GC, and SM soils). The subgrade soils serve as the road surfacing.
The proposed aggregate surfacing is designed in accordance with the South Dakota Catalog Method for a “high” subgrade support condition (CBR >10%) with less than 5 trucks per day (see attached tables). The soil corrosivity was checked for three of the eight subgrade samples (pH, resistivity, sulfates, and chlorides). One of these subgrade samples was found to be corrosive with a low resistivity (511 ohm-cm) and high chlorides.
Surfacing Recommendations:
Based upon the pavement and geotechnical investigations, it is recommended that the road be surfaced with 4 inches of crushed aggregate base (item 30202-2000 Roadway aggregate, method 2). The project is to be constructed using the FP-14 and CFLHD’s standard SCRs related to pavements and materials with the exception of a 602 SCR to specify corrugated steel pipe with either a 12 gage wall thickness or a polymer coating.
Any additional SCRs may be developed as needed.
Attachments:
County Map and Site Map (2 pages) 2022 Lab Report and Photos (3 pages) 2023 Boring Log and Lab Report (3 pages) South Dakota Catalog Method with CBR Values
N
W
N
W
N
W
N
W
N
W
¡¢33
Stum py
Ridg e Rd
Can yo n R d
UpperHideaway Ln
Te pe e Tr l
Bla c kt oo th Rd
Lower Hideaway Ln
Burgess Dr
Styx Rd
26 2
24 25
21 9
Re d G rad e R d
MP
to
R ed G ra de
R d
M ile
P os t 0 to
W
YO
M
IN
G S
TA
TE
H
IG
H W
AY
C O
U N
TY
R
O
AD
PU
BL
IC
R
O
AD
PR
IV
AT
E
R O
AD
SU
RF
AC
E
Bu re au o f L an d M an ag em en t
Fo re st S er vi ce
Pr iv at e
St at e
0.
M ile s
5, ,5
2, Fe et
D is cl ai m er
: S he rid an
C ou nt y pr ov id es th is m ap o n an "a s is
" b as is w ith ou t w ar ra nt ie s of a ny k in d, an d is in te nd ed fo r i llu st ra tiv e pu rp os es o nl y.
Th e da ta in th is m ap is in te nd ed to a pp ro xi m at e re al ity
An y er ro rs a re u ni nt en tio na l a nd s ub je ct to c or re ct io n.
Sh er id an C ou nt y as su m es n o lia bi lit y fo r a ct io ns ta ke n by u se rs b as ed o n th e in fo rm at io n sh ow n.
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y
¡¢19
¡¢33
¡¢33
¡¢34
¡¢34
¡¢33
¡¢33
¡¢34
¡¢33
¡¢33
£ ¤8
£ ¤1
£ ¤1
£ ¤1
£ ¤14 A
£ ¤1
£ ¤8
£ ¤14-
£ ¤8
£ ¤14 A
§̈ ¦90
En d
P ro je ct
M P
.9
Be gi n P ro je ct
D oc um en t P at h:
Y
:\G
IS
_M ai n_ G
D B_
Fi le s\ M
XD
\P ub lic
W or ks \K
M ul le r\R ed G ra de
M P0 to
O ct
.m xd
S c h e d u le
A
W Y
F L
A P
S H
E
B e g in
P r o je c t
R e d
G r a d e R o a d
S c h e d u le
A
W Y
F L
A P
S H
E
E n d P r o je c t
R e d
G r a d e R o a d
O p ti o n X
W Y
F L
A P
S H
E
B e g in
P r o je c t
R e d
G r a d e R o a d
O p ti o n X
W Y
F L
A P
S H
E
E n d P r o je c t
R e d
G r a d e R o a d
B L
M
B
IG
H O
R N
N A
T
IO
N A
L F
O R
E S
T
B L
M
L
IT
T L
E G
O O
S E
R A
N C
H
L A
N D
S
S T
A T
E
W Y
O M
I N
G
B L
M m ile s
She rid an
To
N
S c a le i n F e e t
P a r k in g A c c e s s
R e d G r a d e T r a il s
170+00
200+00
220+00
230+00
240+00
260+00
270+00
280+
A s p e n s p a r k in g l o t m il e s
U S H
W Y
T o
S ta g in g A r e a
S ta g in g A r e a
S ta g in g A r e a
B la c k to o th R d
St um py R idge R d.
Te pe e Tr ai l
C a n y o n R d
B la ck to o th R d
S ta g in g A r e a
B
IL
S ig n
A r e a
S ta g in g
B
IL
S ig n
3:28 PM 6 May 2024] Site Map [ N:\WY\26(1)\Roadway\CADD_Sheets\A-Gen_sht\STE_WY26(1).dgn
O F
F
IC
E O
F F
E D
E R
A L
L A
N D
S H
IG
H
W A
Y
F E
D E
R A
L H
IG
H
W A
Y A
D M
IN
IS
T R
A T
IO
N
U .S
D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
S
IT
E M
A P
P R
O J E
C T
N U
M B
E R
S H
E E
T
R E
D G
R A
D E
R O
A D
W Y
F L
A P
S H
E
(1
A
WY FLAP SHE 26(1) Red Grade Road
Milepost 1.4 – Looking Back at Road Conditions on May 19, 2022
Milepost 1.4 – Looking Ahead at Road Conditions on May 19, 2022
WY FLAP SHE 26(1) Red Grade Road
Milepost 2.4 – Looking Back at Road Conditions on May 19, 2022
Milepost 2.4 – Looking Ahead at Road Conditions on May 19, 2022
Pr oj ec t:
Bo rin g N um be r
Lo ca tio n D ep th o f
Bo re to
3" to
1' to to
3" to
1' to
2' 0 to
3' to to
6" to
4' 0 to .5
2.
5' to
.5
4.
5' to to
2" to
4' to to
3" to to
2" to
1' to
G ra yi sh b ro w n sil ty sa nd w ith g ra ve l
Co m po sit e Bu ck et S am pl e
Li gh t t an si lty sa nd w ith g ra ve l
Re fu sa l o n bo ul de r
P‐
St a.
+4 0, 'L
2'
Ta nn ish b ro w n cl ay ey sa nd w ith g ra ve l
Co m po sit e Bu ck et S am pl e
Re d sil ty g ra ve l w ith sa nd Re fu sa l o n bo ul de r
Re dd ish b ro w n cl ay ey g ra ve l w ith sa nd
P‐
St a.
+3 8, 'L
5' Re dd ish b ro w n cl ay ey g ra ve l w ith sa nd Co m po sit e Bu ck et S am pl e
St a.
+7 3, 'L
5' G ra y sil ty sa nd Re dd ish b ro w n sa nd y sil t
4' Li gh t b ro w n cl ay ey g ra ve l w ith sa nd P‐
St a.
+7 5, 'L
Co m po sit e Bu ck et S am pl e
In ve st ig at io n D at e:
‐S ep
‐2
Co m po sit e Bu ck et S am pl e
Co m po sit e Bu ck et S am pl e
Re dd ish b ro w n cl ay ey g ra ve l w ith sa nd Li gh t b ro w n sil ty sa nd w ith g ra ve l
G ra yi sh ta n sil ty sa nd w ith g ra ve l
Co m po sit e Bu ck et S am pl e
P‐
St a.
+9 0, 'L
5' Ta nn ish g ra y cl ay ey g ra ve l w ith sa nd
P‐
Re dd ish b ro w n cl ay ey g ra ve l w ith sa nd Ta nn ish b ro w n cl ay ey g ra ve l w ith sa nd P‐
St a.
+6 4, 'L
5' Ta nn ish b ro w n cl ay ey sa nd w ith g ra ve l
G
EO
TE
CH
N
IC
AL
IN
VE
ST
IG
AT
IO
N B O
RI
N G L O G
Co m po sit e Bu ck et S am pl e
Ta nn ish b ro w n cl ay ey sa nd w ith g ra ve l
Li gh t b ro w n sil ty g ra ve l w ith c ob bl es
Li gh t r ed si lty g ra ve l w ith sa nd
G ra yi sh ta n cl ay ey sa nd w ith g ra ve l
Re dd ish b ro w n cl ay ey g ra ve l w ith sa nd
Bo rin g O bs er va tio ns Sa m pl e D es cr ip tio n
St a.
+4 5, 'L
P‐
5'
W Y
FL
AP
S H E
(1 ) R ed G ra de
R oa d
5' St a.
+4 8, 'L
P‐
| WY Red Grade Road Final Pavement Memo |
| Appendix |
| WY Red Grade Road Final Pavement Memo |
| WY Red Grade County Map |
| WYOMING-FLAP APP 2020 RedGradeRoad GIS Map |
| WY Red Grade Site Map |
| A Sheets |
| STE_WY26(1) |
| 22-278-S |
| WY Regrade Road Photos |
| WY Red Grade Road - Boring Log |
| 23-2350-REVISED-S |
WY Red Grade South Dakota Method
| 2024-08-27T17:11:28-0600 | |
| ROBERT E NORICK |
| 2024-08-27T17:18:20-0600 | |
| MICHAEL D VOTH |
File details come from the government source that posted it. Updated .