DRAFT WY FLAP SHE 26(1) Cross Sections.pdf

PDF 56 MB Posted

Attached to
WY FLAP SHE 26(1), Red Grade Road, Phase 1 Federal contract opportunity
Solicitation number
6982AF25B000010
Issued by
Department of Transportation Federal Highway Administration

About this file

The document appears to be a draft cross-section file related to a Federal Lands Access Program (FLAP) highway improvement project in Wyoming. The project involves rehabilitating and improving Red Grade Road, a 2.6-mile roadway corridor connecting Wyoming State Highway 335 to US Highway 14, providing access to Bighorn National Forest and Bureau of Land Management lands. The project is divided into two primary schedules: Schedule A covers 1.8 miles with major cut and retaining wall work, and Schedule B extends to 2.6 miles, with an optional Aspen's Parking Lot rehabilitation.

Key technical specifications include roadway widening from the existing 18-foot width to a variable 22-foot or 18-foot width, implementing minor horizontal and vertical realignments to enhance sight distance and roadway geometry, and incorporating drainage improvements. The project is classified as a 3R+ (Resurfacing, Restoration, Rehabilitation, and Other) in mountainous terrain. The anticipated construction timeline spans from May 2026 to November 2027, with a planned winter shutdown, and the work will be performed at high altitude between 7,000 to 8,000 feet. The project is being managed by the Department of Transportation's Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .