WSD SAT CR3 Upgrade

Closed Solicitation Posted

Solicitation number
HC102819R0037
Agency
Defense Information Systems Agency Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
PSC
Not on record
Place of performance
Data Center San Antonio 3326 General Hudnell Drive (Building 200) San Antonio, Texas 78226, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

This amendment is to ensure the proposal due date reflects May 1, 2019 at 1pm CST.
The solicitation AMD 0002 issued to provide all drawings and photos of the proposed project and revise the PWS to remove the requirement to contact the COR for information during this solicitation. This Amendement shall extend the solicitation closing date to 14 May 2019 @ 1pm CST..

Update #3 ·

This modification is to ensure the proposal due date reflects May 1, 2019 at 1pm CST.
***Contractors requiring the drawings referenced in the Q & A posted on April 12th should contact both guy.w.wells.civ@mail.mil and shawn.w.shiflett@mail.mil.***.

Update #2 ·

This modification is to ensure the proposal due date reflects May 1, 2019 at 1pm CST..

Update #1 ·

This request for proposal (RFP) is to support the Workforce Services Directorate's (WSD) requirement to purchase and install a raised access floor, replace existing CRAH units, install new CRAH units, install new PDU's and install a new gaseous fire suppression system.


Offerors are requested to submit a written technical and price proposal in response to the Performance Work Statement (PWS) embedded in HC102819R0037 and Quality Assurance Surveillance Plan (QASP)(Attachment 3). Further information on submission of technical and price proposals is provided throughout this document.


IAW with DISA Acquisition Regulation Supplement (DARS) 52.209-9000, each offeror shall specifically identify in its proposal, whether or not any potential or actual Organizational and Consultant Conflicts of Interest (OCCI) as described in Federal Acquisition Regulation (FAR) Subpart 9.5 exists for this procurement. If the offeror believes that no OCCI exists, the OCCI response shall set forth sufficient details to support such a position. If an offeror believes that an actual or perceived OCCI does exist on this procurement, the offeror shall submit an OCCI plan with the proposal, explaining in detail how the OCCI will be mitigated and/or avoided.


The Government will determine completeness of the offeror's proposal by verifying that all solicitation requirements have been priced, figures are correctly calculated, and costs are presented in a clear and useful format. The offeror shall submit pricing for the scope of work requested for the 1-year PoP. The total evaluated price will consist of the contractor's proposed price for the work requested.
Offerors should ensure price proposals include detailed information regarding the resources required to accomplish the task (e.g., labor categories, labor hours, number of employees for each labor category, rates, travel, incidental equipment, contract access fees, etc.). Again, the price proposal spreadsheet shall be a separate document from the technical/management proposal.


Each contractor must also complete Attachment 1, Payment Plan. Offerors should ensure the figures correctly calculate after providing the amounts in each area of the spreadsheet.

.

Attachments

Files attached to this notice, newest first
File Type Posted
CR3_Access_Floor_Plan_(per_Q_27).pdf PDF
Below_Raised_Floor__1.JPG JPG image
SRG_1.JPG JPG image
SRG_2.JPG JPG image
Appendix_M_-_Non-Disclosure_Agreement.pdf PDF
Appendix_H_-_SEC_Inventory_Format_(excel_spreadshhet).xlsx XLSX spreadsheet
Wall_below_raised_floor.JPG JPG image
Below_Raised_Floor_3.JPG JPG image
SAT_MD_E-PP101-E-100.pdf PDF
SRG_Clamp_1.JPG JPG image
AMD002.pdf PDF
Appendix_B_-_09_69_00_Raised_Access_Flooring_Specification.pdf PDF
Appendix_G_-_CRAH_Specification.pdf PDF
Above_Ceiling_Grid_8.JPG JPG image
Appendix_E_-_Consolidated_Closeout_and_Commissioning_Procedures.pdf PDF
Appendix_A_-_Concept_Drawing_Floor_Plan.pdf PDF
Below_Raised_Floor__2.JPG JPG image
SRG_Clamp_2.JPG JPG image
DISA_B200_Mechanical_Piping_(per_Q_23).pdf PDF
Below_Raised_Floor__4.JPG JPG image
Below_Raised_Floor_Cabling.JPG JPG image
Below_Raised_Floor_Piping_1.JPG JPG image
Above_Ceiling_Grid_9.JPG JPG image
Appendix_L_-_Electrical_Safety_Program_(ESP).pdf PDF
Above_Ceiling_Grid_6.JPG JPG image
Appendix_F_-_BAS_System_Div_25_Integrated_Automation_6_June_13_rev_1.pdf PDF
Below_Raised_Floor__5.JPG JPG image
Appendix_N_-_MIL-STD-188-124B_18Dec2000_(SRG).pdf PDF
Appendix_I_-_Labeling_Standard.pdf PDF
Appendix_D_-_Sample_MOP_Detail.docx DOCX document
DISA_San_Antonio_As-Builts_(per_Q_44).pdf PDF
Appendix_C_-_BACnet_DDC_Specification.pdf PDF
Above_Ceiling_Grid_7.JPG JPG image
Appendix_K_-_SRG_Specification.pdf PDF
Appendix_J_-_PDU_SPEC.pdf PDF
Bid_Walk_Questions_HC102819R0037_QA.docx DOCX document
HC102819R0037-0001.pdf PDF
Attachment_3_QASP.docx DOCX document
Attachment_2_Site_Visit_Request_Form.doc DOC document
Attachment_1_Payment_Plan.xlsx XLSX spreadsheet
HC102819R0037_Solitation.pdf PDF
Show all 41

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity