DISA_B200_Mechanical_Piping_(per_Q_23).pdf

PDF 14 MB Posted

Attached to
WSD SAT CR3 Upgrade Federal contract opportunity
Solicitation number
HC102819R0037
Issued by
Defense Information Systems Agency

About this file

Mechanical Piping

View the file

Other files for this federal contract opportunity

Other files attached to WSD SAT CR3 Upgrade, newest first.
File Type Posted
Below_Raised_Floor__4.JPG JPG image
Below_Raised_Floor_Cabling.JPG JPG image
Below_Raised_Floor_Piping_1.JPG JPG image
Above_Ceiling_Grid_9.JPG JPG image
Appendix_L_-_Electrical_Safety_Program_(ESP).pdf PDF
Above_Ceiling_Grid_6.JPG JPG image
Appendix_F_-_BAS_System_Div_25_Integrated_Automation_6_June_13_rev_1.pdf PDF
Below_Raised_Floor__5.JPG JPG image
Appendix_N_-_MIL-STD-188-124B_18Dec2000_(SRG).pdf PDF
Appendix_I_-_Labeling_Standard.pdf PDF
Appendix_B_-_09_69_00_Raised_Access_Flooring_Specification.pdf PDF
Appendix_G_-_CRAH_Specification.pdf PDF
Above_Ceiling_Grid_8.JPG JPG image
Appendix_E_-_Consolidated_Closeout_and_Commissioning_Procedures.pdf PDF
Appendix_A_-_Concept_Drawing_Floor_Plan.pdf PDF
Below_Raised_Floor__2.JPG JPG image
SRG_Clamp_2.JPG JPG image
Appendix_D_-_Sample_MOP_Detail.docx DOCX document
DISA_San_Antonio_As-Builts_(per_Q_44).pdf PDF
Appendix_C_-_BACnet_DDC_Specification.pdf PDF
Above_Ceiling_Grid_7.JPG JPG image
Appendix_K_-_SRG_Specification.pdf PDF
Appendix_J_-_PDU_SPEC.pdf PDF
CR3_Access_Floor_Plan_(per_Q_27).pdf PDF
Below_Raised_Floor__1.JPG JPG image
SRG_1.JPG JPG image
SRG_2.JPG JPG image
Appendix_M_-_Non-Disclosure_Agreement.pdf PDF
Appendix_H_-_SEC_Inventory_Format_(excel_spreadshhet).xlsx XLSX spreadsheet
Wall_below_raised_floor.JPG JPG image
Below_Raised_Floor_3.JPG JPG image
SAT_MD_E-PP101-E-100.pdf PDF
SRG_Clamp_1.JPG JPG image
AMD002.pdf PDF
Bid_Walk_Questions_HC102819R0037_QA.docx DOCX document
HC102819R0037-0001.pdf PDF
Attachment_2_Site_Visit_Request_Form.doc DOC document
Attachment_1_Payment_Plan.xlsx XLSX spreadsheet
Attachment_3_QASP.docx DOCX document
HC102819R0037_Solitation.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N/A

P956

Pavilion 3

N/A

N/A

N/A

Pavilion 2

N/A

10792

N/A

N/A

1541681

N/A

N/A

P958

N/A

N/A

11101

11102

P957

N/A

N/A

N/A

N/A

Pavilion 1

11103

N/A

N/A

N/A

Andrews Road

Kelly Drive

C happie Jam es W ay

T in k e r

D r iv e

M o o re

S tre e t

H o f S tre e t

W il s o n

B u le v a r d

Billy Mitchell Bulevard

S e c u r it y

H il l

N o r t h

L u k e

D r iv e

Burton Avenue

O r d in a n c e

R o a d

J e f f e r s o n

D r iv e

Andrews Road

D o m in g u e s

S t r e e t

Hanger Avenue

C h e n a u lt

C ir c le

Eglin Street

Barnett Avenue

Crockett Road

Dunton Street

O ld

S tr e e t

Johns Road

H a ll

S t r e e t

R o b e r t

D o v e r

S t r e e t

G a la x y

R o a d

DE Camp Hall Avenue

G o o d ric h

D riv e

G r o w d e n

R o a d

L

U

K

E

D

I V

S

O

U

T

H

N o r t o n

S t r e e t

W e s to v e r

R o a d

Houston Bulevard

Billy Mitchell Road

H a n g r

W y

Avenue A

Elser Avenue

Calgary Avenue

R e d

H o r s e

D r iv e

L o m b a r d

D r iv e

O f f u t t

S t r e e t

S h o p

L a n e

W a k k a n a

S tre e t

Lawrence Avenue

N o r t h

C r ic k e t t

D r iv e

P e s h a w a r S tre e t

K ir k n e w to n

S tr e e t t h r e e t

G a f f n e y

S t r e e t

F o u lo is

S tr e e t

Jones Avenue

E a s t e n r e e t

Engla nd

W a lk e r

R o a d

Medina Street

Travis Road

C a r s w e ll

S t r e e t

W it t

Lockett Street

Fickel Street

S a rn o s k i S tre e t

T

B

D

D u n c a n

D ri v e

Person Avenue

R o b b in s iv e

B a r n e s

L a c k e ll

A v e

Buckner

T a y m a n

A v e n u e

Aldrup Avenue

C h it t y

H a ll

S t r e e t

R o o s e v e lt

R o a d

H a ll

S tr e e t

McGarrigle Avenue

L in c ln iv e

A f c o m s

W a y

F o u r t h

Muldoon Avenue

S ix t h

S t r e e t

H a r m o n

In dustri al P ark

R oad

A v io n ic s

C ir c le

A ir lif iv e

S o u th

C r ic k e tt D r iv e

W a g n e r

D r iv e

P e r r in

Austin Road

M o o r m a n

T ra b z o n

S tre e t

P a k

C u r t

Croyden Avenue

M a b ry

D riv e

D a y

S t r e e t

G re ig

S tr e e t

PROJECT

SITE

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

M

A

G E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

T

F

S

N

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

A Combat Support Agency

G-001

C O

V E

R

S

H E

E T

SAN ANTONIO, TEXAS

DEFENSE INFORMATION SYSTEMS AGENCY

(DISA)

PLANS FOR:

CONTRACT NO.: W9126G-16-C-0064

3326 GENERAL HUDNELL DRIVE

SAN ANTONIO, TEXAS 78226

McGOLDRICK

CONSTSRUCTION

SERVICES CORP.

8627 CINNAMON CREEK,

SUITE 301

SAN ANTONIO, TX 78240

P - (210) 690-4585

F - (210) 690-4587

CONTACT:

WALTER HIETT

CONTRACTOR

ALDERSON &

ASSOCIATES, INC.

7700 TORINO

SUITE 101

SAN ANTONIO, TX 78229

P - (210) 614-1110

F - (210) 615-8549

CONTACT:

PHILLIP PRESTON

MEP ENGINEER

SCALE: N.T.S.

GI1001

SITE VICINITY MAP

SCALE: N.T.S.

GI1001

SITE LOCATION MAP

SHEET INDEX

G-001 COVER SHEET

MECHANICAL SHEETS (PACKAGE 1)

M-001 MECHANICAL SYMBOLS & ABBREVIATIONS

MD101 PARTIAL MECHANICAL PIPING PLAN - DEMOLITION

MD102 PARTIAL MECHANICAL PIPING PLAN - DEMOLITION

MD103 PARTIAL MECHANICAL PIPING PLAN - DEMOLITION

MD104 PARTIAL MECHANICAL PIPING PLAN - DEMOLITION

MD105 PARTIAL MECHANICAL PIPING PLAN - DEMOLITION

MD106 PARTIAL MECHANICAL PIPING PLAN - DEMOLITION

MD401 ENLARGED MECHANICAL DUCTWORK PLAN - DEMOLITION

MD402 ENLARGED MECHANICAL PIPING PLAN - DEMOLITION

MD403 ENLARGED MECHANICAL PIPING PLAN - DEMOLITION

MD404 ENLARGED MECHANICAL PIPING PLAN - DEMOLITION

MD405 ENLARGED MECHANICAL PIPING PLAN - DEMOLITION

MH101 PARTIAL MECHANICAL DUCTWORK PLAN - NEW WORK

MH102 PARTIAL MECHANICAL DUCTWORK PLAN - NEW WORK

MH401 ENLARGED MECHANICAL DUCTWORK PLAN - NEW WORK

MP101 OVERALL MECHANICAL PIPING PLAN - NEW WORK

MP102 PARTIAL MECHANICAL PIPING PLAN - NEW WORK

MP103 PARTIAL MECHANICAL PIPING PLAN - NEW WORK

MP104 PARTIAL MECHANICAL PIPING PLAN - NEW WORK

MP105 PARTIAL MECHANICAL PIPING PLAN - NEW WORK

MP106 PARTIAL MECHANICAL PIPING PLAN - NEW WORK

MP401 ENLARGED MECHANICAL PIPING PLAN - NEW WORK

MP402 ENLARGED MECHANICAL PIPING PLAN - NEW WORK

MP403 ENLARGED MECHANICAL PIPING PLAN - NEW WORK

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

ELECTRICAL SHEETS (PACKAGE 1)

E-001 ELECTRICAL SYMBOLS & ABBREVIATIONS

ED101 PARTIAL FLOOR PLAN - ELECTRICAL DEMOLITION

EP101 PARTIAL FLOOR PLAN - ELECTRICAL NEW WORK

EP102 PARTIAL FLOOR PLAN - ELECTRICAL NEW WORK

EP103 PARTIAL FLOOR PLAN - ELECTRICAL NEW WORK

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL ONE-LINE DIAGRAMS

E-602 ELECTRICAL SCHEDULES

PORT OF SAN ANTONIO

BUILDING 200 MECHANICAL PIPING AND

CONTROLS

RECORD DRAWINGS SUBMITTAL

DATE OF ISSUE: 10/08/2018 R

EC

O

R D

D R

AW

IN

G S

- P

AC

KA

G

MECHANICAL SYMBOLS AND ABBREVIATIONS

CHECK VALVE (AS SPECIFIED)

DUCT SECTION, SUPPLY AIR: UP, DOWN

DUCT SECTION, RETURN AIR OR EXHAUST: UP, DOWN

CHANGE OF ELEVATION, OFFSET, UP OR DOWN (DN)

HIGH EFFICIENCY TAKE-OFF WITH DAMPER, WITHOUT DAMPER

SMOKE FIRE DAMPER, HORIZONTAL

MANUAL VOLUME DAMPER (TYPE INDICATED)

ACCESS DOORS, VERTICAL OR HORIZONTAL

DUCT SECTION, OUTSIDE AIR: UP, DOWN

DUCT SIZE, FIRST FIGURE IS SIDE SHOWN

SMOKE FIRE DAMPER, VERTICAL

FIRE DAMPER, HORIZONTAL

BACK DRAFT DAMPER

MOTORIZED DAMPER

FIRE DAMPER, VERTICAL

TURNING VANES

TRANSITION

FLEXIBLE DUCT

FLEXIBLE CONNECTION

WELDED FITTING

FLANGED FITTING

DIAPHRAGM (PNEUMATIC ACTUATOR)

SCREWED FITTING

REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER

LEVER (MANUAL)

MOTOR (ELECTRIC ACTUATOR)

SOLENOID (ELECTRIC ACTUATOR)

MOTOR (PNEUMATIC ACTUATOR)

STEM (MANUAL)

DOUBLE CHECK BACKFLOW PREVENTER

GEAR (MANUAL)

SHUT OFF VALVE (AS SPECIFIED)

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

THREE WAY VALVE

OSSY VALVE WITH TAMPER SWITCH

GLOBE VALVE

BUTTERFLY / BALL ISOLATION

SOIL, WASTE OR SANITARY SEWER

FIRE PROTECTION WATER SUPPLY

LOW TEMPERATURE HOT WATER RETURN

LOW TEMPERATURE HOT WATER SUPPLY

COMPRESSED AIR (PRESSURE NOTED)

HOT WATER RECIRCULATING

MEDICAL COMPRESSED AIRMA

DUCTWORK SYMBOLS

CHWR

CHWS

SP

(NAME)

LA

HWR

HWS

CHILLED WATER RETURN

CHILLED WATER SUPPLY

LABORATORY COMPRESSED AIR

AUTOMATIC SPRINKLER

EXISTING PIPE

PIPE TO BE REMOVED

MG

A

LOX

A30

GV

HG

O

RO

F

G

DI

SW

GAS - MEDIUM PRESSURE

OXYGEN

GAS VENT

LIQUID OXYGEN

COMPRESSED AIR

GAS - HIGH PRESSURE

HOT WATER (TEMP. INDICATED)

SOFT WATER

DEIONIZED WATER

REVERSE OSMOSIS

GAS - LOW PRESSURE

PIPING SYMBOLS

D

AW

AV

ACID WASTE

ACID VENT

INDIRECT DRAIN

COLD WATER

HOT WATER

VENT

MECHANICAL SYMBOLS

GRILLE IDENTIFICATION

ANGLE VALVE

MOTORIZED VALVE

BALANCING VALVE (AS SPECIFIED)

BALL VALVE

SIDEWALL GRILL OR REGISTER (TYPE INDICATED)

CEILING GRILL OR REGISTER (TYPE INDICATED)

LOUVER (TYPE INDICATED)

TEE WITH SPLITTER DAMPER & PULLROD

DUCTWORK SYMBOLS (CONT.)

STANDARD BRANCH, SUPPLY OR RETURN, NO SPLITTER

MANUAL SPLITTER

OFFSET

REFER TO DETAIL 2, SHT. M-1

DRAWING SYMBOLS

EQUIPMENT MARK

SECTION REFERENCE

WALL CLEANOUT

YARD CLEANOUT OR CLEANOUT TO GRADE

DOUBLE YARD CLEANOUT OR CLEANOUT TO GRADE

DYCO

YCO

WALL HYDRANT OR RECESSED BOX HOSE BIBB

WCO

FCO

WH

HB

CLEANOUT PLUG

FLOOR CLEANOUT

THERMOMETER WELL, ONLY

PRESSURE GAUGE AND COCK

OUTLET, TYPE INDICATED

F&T

OFM-1

VFM-1

EJ-1

STEAM TRAPS (INDICATE TYPE)

VENTURI FLOWMETER

ORIFICE PLATE

EXPANSION JOINT

FLEXIBLE CONNECTOR

EXPANSION LOOP

NOTE: NOT ALL SYMBOLS OR

ABBREVIATIONS MAY BE USED.

RE: 2M1

DUCT OR PIPE TEMP. SENSOR (PROVIDE 12" MIN.

DUCT STATIC PRESSURE SENSOR

DUCT TEMP. SENSOR WITH AVERAGING ELEMENT

LENGTH IN DUCT WHEN SPACE PERMITS)

REFRIGERANT SENSOR

PRESSURE SWITCH

DUCT HUMIDITY SENSOR

DUCT DEW POINT SENSOR

ROOM THERMOSTAT: TEMPERATURE, HUMIDITY

ROOM SENSOR: TEMPERATURE, HUMIDITY

REMOTE BULB THERMOSTAT

DUCT OR PIPE THERMOSTAT ( PROVIDE 12"

MIN. LENGTH IN DUCT WHEN SPACE PERMITS)

DUCT THERMOSTAT WITH AVERAGING ELEMENT

CONTROLS

MECHANICAL SYMBOLS (CONT.)

SIDEWALL FIRE SPRINKLER HEAD

PENDANT FIRE SPRINKLER HEAD

UPRIGHT FIRE SPRINKLER HEAD

SMOKE DETECTOR

DRAIN (TYPE NOTED)

HEAT DETECTOR

VARIABLE SPEED MOTOR CONTROLLER

CWP-1

AV

MV

ALIGNMENT GUIDE

PUMP (INDICATE USE)

ANCHOR

BALL JOINT

AUTOMATIC AIR VENT

STRAINER W/ BLOW OFF

MANUAL AIR VENT

TEE

OUTLET UP TEE

SCREWED UNION

OUTLET DOWN TEE

FLANGED UNION

ECCENTRIC STRAIGHT CROWN REDUCER

ECCENTRIC STRAIGHT INVERT REDUCER

CROSS

FLOW SWITCH

MECHANICAL SYMBOLS (CONT.)

R

PITCH OF PIPE, RISE (R) DROP (D)

TURNED UP ELBOW

TURNED DOWN ELBOW

CONCENTRIC REDUCER

FD

NPW NON-POTABLE WATER

THERMOMETER

CAP

T H

T H

T

T

T

T

H

DP

SP

T

RS

FS

P

SC

AHU - # #

1M3

RE

SD

HD

VALVE - SEE SPECIFICATIONS

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

M-001

E

C H

A N

I C

Y M

B O

B

B R

E V

I A

T I O

N S

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

CR1

CR2B

CR2A CR3

CR1CR1

NO DIV. 23 DEMO

WORK IN HATCHED AREA.

MATCHLINE RE: MD-402

MATCHLINE RE: MD-102

CHWR (E)

CHWS (E)

CHWR (E)

CHWS (E)

CHWR (E)

CHWS (E)

6"

6"

6"

CHWR (E)

CHWS (E)

MATCHLINE RE: MD-103

MATCHLINE RE: MD-101

M A

T C

H L I N

E

R

E

M

D

MATCHLINE RE: MD-101

S

S

E

4"SS (E)

1 1

SCALE: 1/8" = 1'-0"

KEYED NOTES: (APPLIES TO THIS SHEET)

MD101

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/8"=1'-0"

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

1. ALL WORK SHALL BE IN ACCORDANCE WITH THE INTERNATIONAL

BUILDING CODE,THE INTERNATIONAL MECHANICAL CODE, AND THE

OTHER CODES AND ORDINANCES OF THE AUTHORITY HAVING

JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING

VANES AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH

INSULATION AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE

AND SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL

DAMPER ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL

TRADES BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE

TO DUCT SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC

EQUIPMENT WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE

CANVAS CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO

INSTALLATION. SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE

PIPING AT 1/8" PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW

ALL MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING

RECORD DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD

VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE

AVAILABLE TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY

THE OWNER SHALL BE DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

P A

R T

I A

L

M

E C

H A

N I C

P

I N

G

P L

E M

O L

I T

I O

N

1. REMOVE EXISTING CHILLED WATER PIPING.

2. EXISTING CHILLED WATER PIPING TO REMAIN IN

SERVICE.

3. REMOVE EXISTING SANITARY SEWER PIPING UP TO

INDICATED LOCATION.

4. EXISTING SANITARY SEWER PIPING TO REMAIN IN

SERVICE.

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

CR2A CR3

CR2A CR3

MATCHLINE RE: MD-102

MATCHLINE RE: MD-403

MATCHLINE RE: MD-103

CHWR (E)

CHWS (E)

C H

C H

6"

C H

C H

6"

6"

CHWR (E)

CHWS (E)

C H

C H

C H

C H

6"

M A

T C

H L

I N

E

R

E

M

D

M A

T C

H L

I N

E

R

E

M

D

6"

6"

SCALE: 1/8" = 1'-0"

KEYED NOTES: (APPLIES TO THIS SHEET)

MD102

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/8"=1'-0"

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

1. ALL WORK SHALL BE IN ACCORDANCE WITH THE INTERNATIONAL BUILDING

CODE,THE INTERNATIONAL MECHANICAL CODE, AND THE OTHER CODES AND

ORDINANCES OF THE AUTHORITY HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES

AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION

AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND

SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER

ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES

BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT

SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT

WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS

CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION.

SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8"

PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL

MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD

DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE

TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE

DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

P A

R T

I A

L

M

E C

H A

N I C

P

I N

G

P L

E M

O L

I T

I O

N

1. REMOVE EXISTING CHILLED WATER PIPING.

2. EXISTING CHILLED WATER PIPING TO REMAIN IN

SERVICE.

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

CR2A CR3

CR2BCR2B

MATCHLINE RE: MD-103

MATCHLINE RE: MD-102

CHWR (E)

CHWS (E)

C H

C H

C H

C H

C H

C H

C H

C H

CHWS (E)

CHWR (E)

MATCHLINE RE: MD-101 MATCHLINE RE: MD-101

6"

6"

4"

6"

MATCHLINE RE: MD-102

SCALE: 1/8" = 1'-0"

KEYED NOTES: (APPLIES TO THIS SHEET)

MD103

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/8"=1'-0"

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

ORDINANCES OF THE AUTHORITY HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES

AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION

AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND

SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER

ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES

BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT

SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT

WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS

CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION.

SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8"

PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL

MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD

DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE

TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE

DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

P A

R T

I A

L

M

E C

H A

N I C

P

I N

G

P L

E M

O L

I T

I O

N

1. REMOVE EXISTING CHILLED WATER PIPING TO

POINT INDICATED.

2. PIPE UP THRU FLOOR.

3. EXISTING CHILLED WATER PIPING TO REMAIN IN

SERVICE.

4. EXISTING CHILLED WATER PIPE CONTINUES.

5. CAP ,SEAL, AND INSULATE EXISTING PIPE AS

REQUIRED.

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

FRAME ROOM

LOCKER ROOM

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B

D u c t

Sink

Air

Compressor

Trans-former

Transformer

Square D

Model 5

Electronic

Control

Center

Hot

Water

Pump

Workbench

Post

UD

Chilled

Water

Pump

Duct

Duct

Post

#3

P

U

M

P

#4

P

U

M

P

Chilled

Water

Pump

#3

Condenser

Condenser

Filter

Filter

Water

Treatment

Unit

Chilled

Water

Pump

#4

H a n k is o n

A ir C o m p r e s s o r

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

M A

T C

H L

I N

E

R

E

M

D

M A

T C

H L

I N

E

R

E

M

D

M A

T C

H L

I N

E

R

E

M

D

MATCHLINE RE: MD-106

MATCHLINE RE: MD-104

MATCHLINE RE: MD-104

MATCHLINE RE: MD-404

C H

C H

C H

C H

CHWR (E)

CHWS (E)

CHWR (E)

CHWS (E)

6"

6"

4"

4"

C H

C H

C H

C H

6"

C H

C H

CHWS (E)

CHWR (E)

CHWR (E)

CHWS (E)

CHWS (E)

CHWR (E)

CHWR (E)

CHWS (E)

CHWS (E)

CHWR (E)

4"

4"

C H

C H

)C H

C H

C

H

C

H

C H

C H

C H

C H

2"

C H

C H

C H

C H

C H

C H

C H

C H

C H

C H

C H

C H

C H

C H

C H

C H

CHWR (E)

P R

O J E

C T

I

O M

CLOSET

CR1

V E

S T

I B

U L

E

G

E5 E6 E7 E8

E9

F4

SCALE: 1/8" = 1'-0"

KEYED NOTES:

1. EXISTING CRAC UNIT TO REMAIN IN SERVICE.

2. EXISTING CHILLED WATER PIPING TO REMAIN IN

SERVICE UP TO AND INCLUDING EXISTING

ISOLATION VALVE.

3. REMOVE EXISTING CHILLED WATER PIPING TO

POINT INDICATED.

(APPLIES TO THIS SHEET)

MD104

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/8"=1'-0"

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

ORDINANCES OF THE AUTHORITY HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES

AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION

AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND

SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER

ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES

BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT

SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT

WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS

CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION.

SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8"

PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL

MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD

DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE

TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE

DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

P A

R T

I A

L

M

E C

H A

N I C

P

I N

G

P L

E M

O L

I T

I O

N

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B 1

D u c t

Sink

Air

Compressor

Trans-former

Transformer

Square D

Model 5

Electronic

Control

Center

Hot

Water

Pump

Workbench

Post

UD

Chilled

Water

Pump

Duct

Duct

Post

#3

P

U

M

P

#4

P

U

M

P

Chilled

Water

Pump

#3

Condenser

Condenser

Filter

Filter

Water

Treatment

Unit

Chilled

Water

Pump

#4

H a n k is o n

A ir C o m p r e s s o r

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

FRAME ROOM

COMMUNICATION

CR2A

CR3

V E

S T

I B

U L

E

CLOSET

NO DIV. 23 DEMO

WORK IN HATCHED AREA.

M A

T C

H L

I N

E

R

E

M

D

M A

T C

H L

I N

E

R

E

M

D

MATCHLINE RE: MD-105

MATCHLINE RE: MD-405

MATCHLINE RE: MD-106

MATCHLINE RE: MD-105

C H

C H

4"

CHWS (E)

CHWR (E)

4"

CHWS (E)

CHWR (E)

4"

SCALE: 1/8" = 1'-0"

KEYED NOTES:

1. EXISTING CRAC UNIT TO REMAIN IN SERVICE.

2. EXISTING CHILLED WATER PIPING TO REMAIN IN

SERVICE UP TO AND INCLUDING EXISTING

ISOLATION VALVE.

3. REMOVE EXISTING CHILLED WATER PIPING TO

POINT INDICATED.

4. PIPE CONTINUES TO CRAWL SPACE.

5. PIPE ROUTED DOWN INTO CRAWL SPACE.

(APPLIES TO THIS SHEET)

MD105

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/8"=1'-0"

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

ORDINANCES OF THE AUTHORITY HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES

AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION

AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND

SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER

ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES

BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT

SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT

WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS

CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION.

SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8"

PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL

MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD

DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE

TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE

DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

P A

R T

I A

L

M

E C

H A

N I C

P

I N

G

P L

E M

O L

I T

I O

N

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B 1

D u c t

Sink

Air

Compressor

Trans-former

Transformer

Square D

Model 5

Electronic

Control

Center

Hot

Water

Pump

Workbench

Post

UD

Chilled

Water

Pump

Duct

Duct

Post

#3

P

U

M

P

#4

P

U

M

P

Chilled

Water

Pump

#3

Condenser

Condenser

Filter

Filter

Water

Treatment

Unit

Chilled

Water

Pump

#4

H a n k is o n

A ir C o m p r e s s o r

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

NO DIV. 23 DEMO

WORK IN HATCHED AREA.

M A

T C

H L

I N

E

R

E

M

D

M A

T C

H L

I N

E

R

E

M

D

MATCHLINE RE: MD-106

MATCHLINE RE: MD-104

MATCHLINE RE: MD-106

MATCHLINE RE: MD-105

C H

C H

RESTROOM

RESTROOM

CR2B

R A

M P

RAMP

SCALE: 1/8" = 1'-0"

KEYED NOTES: (APPLIES TO THIS SHEET)

MD106

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/8"=1'-0"

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

ORDINANCES OF THE AUTHORITY HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES

AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION

AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND

SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER

ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES

BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT

SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT

WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS

CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION.

SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8"

PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL

MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD

DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE

TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE

DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

P A

R T

I A

L

M

E C

H A

N I C

P

I N

G

P L

E M

O L

I T

I O

N

1. EXISTING CRAC UNIT TO REMAIN IN SERVICE.

2. EXISTING CHILLED WATER PIPING TO REMAIN IN

SERVICE UP TO AND INCLUDING EXISTING

ISOLATION VALVE.

3. REMOVE EXISTING CHILLED WATER PIPING TO

POINT INDICATED.

4. PIPE ROUTED DOWN INTO CRAWL SPACE.

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B 1

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

24x12

14x12

22x14

22x14 x x x x x

5 5

Boiler Rm #2

MECHANICAL ROOM #2

SCALE: 1/4" = 1'-0"

KEYED NOTES:

1. REMOVE EXISTING AIR HANDLER. EXISTING CONCRETE

HOUSEKEEPING PAD TO REMAIN.

2. REMOVE EXISTING DUCTWORK BACK TO POINT INDICATED.

3. EXISTING AIR HANDLER TO REMAIN IN SERVICE.

4. EXISTING CONTROL PANEL TO REMAIN IN SERVICE.

5. EXISTING DUCT TO REMAIN IN SERVICE.

6. PRIOR TO DEMOLITION OF AHU-9 CONTRACTOR SHALL MEASURE

AND RECORD SUPPLY AIR AIRFLOW FOR FUTURE BALANCING.

7. PRIOR TO DEMOLITION OF AHU-9 CONTRACTOR SHALL MEASURE

AND RECORD RETURN AIR AIRFLOW FOR FUTURE BALANCING.

8. PRIOR TO DEMOLITION OF AHU-9 CONTRACTOR SHALL MEASURE

AND RECORD OUTSIDE AIR AIRFLOW FOR FUTURE BALANCING.

(APPLIES TO THIS SHEET)

MD401

E N

L A

R G

C

H A

N I C

A L

D U

C T

W O

A

N

D

E M

O L

I T

I O

N

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

1. ALL WORK SHALL BE IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE,THE

INTERNATIONAL MECHANICAL CODE, AND THE OTHER CODES AND ORDINANCES OF THE AUTHORITY

HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES AT EACH 90 DEGREE

ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER ON EACH ROUND

SUPPLY BRANCH DUCT SERVING A SUPPLY DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS CONNECTION AT

UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION. SEE

SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8" PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD DRAWINGS AND

FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING

WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE TO THE OWNER.

ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE DISCARDED AT THE CONTRACTOR'S

EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

0' 1' 2' 4' 8'

GRAPHIC SCALE 1/4"=1'-0"

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

BATTERY ROOM #1

MATCHLINE RE: MD-101

MATCHLINE RE: MD-402

CHWR (E)

CHWS (E)

CHWR (E)

CHWS (E)

C H

C H

M A

T C

H L

I N

E

R

E

M

D

SCALE: 1/8" = 1'-0"

KEYED NOTES:

1. EXISTING CHILLED WATER PIPING UP THRU FLOOR

TO LEVEL ABOVE.

2. EXISTING CHILLED WATER PIPING TO REMAIN IN

SERVICE.

3. REMOVE EXISTING CHILLED WATER PIPING.

4. REMOVE EXISTING CHILLED WATER RISER.

REMAINING FLOOR PENETRATION TO BE RE-USED.

5. PATCH AND SEAL WALL PENETRATION TO MATCH

EXISTING.

6. REMOVE EXISTING CHILLED WATER RISER. PATCH

AND SEAL REMAINING FLOOR PENETRATION TO

MATCH EXISTING CONDITIONS.

(APPLIES TO THIS SHEET)

MD402

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/8"=1'-0"

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

ORDINANCES OF THE AUTHORITY HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES

AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION

AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND

SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER

ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES

BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT

SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT

WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS

CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION.

SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8"

PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL

MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD

DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE

TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE

DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

E N

L A

R G

C

H A

N I C

A L

P I P

I N

G

P

L A

N

D

E M

O L

I T

I O

N

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

NO DIV. 23 DEMO

WORK IN HATCHED AREA.

MATCHLINE RE: MD-102

MATCHLINE RE: MD-403

CHWR (E)

CHWS (E)

C H

CHWR (E)

CHWS (E)

M A

T C

H L

I N

E

R

E

M

D

Boiler Rm #2

WAREHOUSE

& SUPPLIES

LOADING DOCK

MECHANICAL ROOM #2

SCALE: 1/4" = 1'-0"

KEYED NOTES:

1. REMOVE EXISTING CHILLED WATER PIPING.

2. REMOVE EXISTING CHILLED WATER PIPING TO

POINT INDICATED. CAP AND SEAL PIPING AS

REQUIRED.

3. EXISTING CHILLED WATER PIPING TO REMAIN IN

SERVICE.

(APPLIES TO THIS SHEET)

MD403

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

ORDINANCES OF THE AUTHORITY HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES

AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION

AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND

SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER

ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES

BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT

SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT

WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS

CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION.

SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8"

PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL

MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD

DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE

TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE

DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

E N

L A

R G

C

H A

N I C

A L

P I P

I N

G

P

L A

N

D

E M

O L

I T

I O

N

0' 1' 2' 4' 8'

GRAPHIC SCALE 1/4"=1'-0"

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

Mechanical

Room #1

Boiler Rm #1

UPS ROOM

BATTERY ROOM #1

MATCHLINE RE: MD-104

MATCHLINE RE: MD-404

CH-2

CH-1

CWP-1

CWP-2

CHWP-1 CHWP-2

CT-1 CT-2

6"

C

H W

R

E

6" CHWR (E)

M M

C

H W

R

E

C

H W

R

E

C

H W

S

E

6" CHWS (E)

C

H W

S

E

C

H W

S

E

6" CHWS (E)

10" CHWS (E)

C

H W

S

E

6"

10"

4" CHWR (E)

10"

10"

6"

4" CHWS (E)

10" CHWS (E)

6"

10" CHWR (E)

6"

10" CHWR (E)

10" CHWR (E)

4" CHWR (E)

C

H W

S

E

10"

10"

10" CHWS (E)

10" CHWR (E)

1-1/2"

1-1/2"MKUP WTR

SCALE: 1/4" = 1'-0"

KEYED NOTES:

1. EXISTING COOLING TOWER TO REMAIN IN SERVICE.

2. REMOVE EXISTING CHILLED WATER PIPING AND

ASSOCIATED HANGERS, SUPPORTS, ETC. AT POINT

INDICATED. CAP AND SEAL PIPE AS REQUIRED.

3. EXISTING MAKE-UP WATER LINE TO REMAIN IN

SERVICE.

4. REMOVE EXISTING CHILLED WATER PIPING AND

ASSOCIATED HANGERS, SUPPORTS, ETC. BACK TO

ISOLATION VALVE AS INDICATED.

5. REMOVE CHILLED WATER PIPING AND ASSOCIATED

HANGERS, SUPPORTS, ETC.

(APPLIES TO THIS SHEET)

MD404

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

OTHER CODES AND ORDINANCES OF THE AUTHORITY HAVING

JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE

TURNING VANES AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH

INSULATION AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER

ASHRAE AND SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME

CONTROL DAMPER ON EACH ROUND SUPPLY BRANCH DUCT

SERVING A SUPPLY DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL

TRADES BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION

SIZE TO DUCT SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC

EQUIPMENT WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE

CANVAS CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO

INSTALLATION. SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE

PIPING AT 1/8" PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR

NEW ALL MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING

BUILDING RECORD DRAWINGS AND FIELD SURVEY. CONTRACTOR

SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO

COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE

MADE AVAILABLE TO THE OWNER. ALL EQUIPMENT/ITEMS NOT

RETAINED BY THE OWNER SHALL BE DISCARDED AT THE

CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE

UNLESS OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

E N

L A

R G

C

H A

N I C

A L

P I P

I N

G

P

L A

N

D

E M

O L

I T

I O

N

0' 1' 2' 4' 8'

GRAPHIC SCALE 1/4"=1'-0"

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

Boiler Rm #2

WAREHOUSE

& SUPPLIES

MECHANICAL ROOM #2

MATCHLINE RE: MD-105

MATCHLINE RE: MD-405

H W

S

E

H W

R

E

HWS (E)

HWR (E)

CHWR (E)

CHWS (E)

RPZ

NPW

1-1/4"

NO DIV. 23 DEMO

WORK IN HATCHED AREA.

C H

C H

C H

C H

C

D

E

SCALE: 1/4" = 1'-0"

KEYED NOTES:

1. EXISTING AIR HANDLER TO REMAIN IN SERVICE.

2. EXISTING UNIT HEATER TO REMAIN IN SERVICE.

3. REMOVE AIR HANDLER. EXISTING CONCRETE

HOUSEKEEPING PAD TO REMAIN. REMOVE

EXISTING CONTROLS ASSOCIATED WITH AHU-9.

4. REMOVE EXISTING PIPING TO POINT INDICATED.

REMOVE EXISTING HOT WATER AND CHILLED

WATER VALVES SERVING AHU-9. CAP AND SEAL

PIPING AS REQUIRED.

5. EXISTING PIPING TO REMAIN IN SERVICE.

6. EXISTING RPZ BACKFLOW PREVENTER TO REMAIN

IN SERVICE.

7. PIPING TO EXISTING HEATING HOT WATER

SYSTEM.

8. REMOVE EXISTING CONDENSATE PIPING UP TO

INDICATED LOCATION AND CAP REMAINING PIPING.

RE: NEW WORK.

(APPLIES TO THIS SHEET)

MD405

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

ORDINANCES OF THE AUTHORITY HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES

AT EACH 90 DEGREE ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION

AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND

SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER

ON EACH ROUND SUPPLY BRANCH DUCT SERVING A SUPPLY

DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES

BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT

SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT

WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS

CONNECTION AT UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL PRIOR TO INSTALLATION.

SEE SPECIFICATIONS.

13. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE L COPPER, GRADE PIPING AT 1/8"

PER FOOT. (MIN.).

14. PROVIDE MANUFACTURER'S RECOMMENDED CLEARANCES FOR NEW ALL

MECHANICAL EQUIPMENT.

15. DRAWING DOCUMENTATION WAS OBTAINED FROM EXISTING BUILDING RECORD

DRAWINGS AND FIELD SURVEY. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO COMMENCING WORK.

16. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL EXISTING

EQUIPMENT/ITEMS TO REMAIN.

17. ALL EQUIPMENT THAT IS REMOVED BUT NOT REUSED SHALL BE MADE AVAILABLE

TO THE OWNER. ALL EQUIPMENT/ITEMS NOT RETAINED BY THE OWNER SHALL BE

DISCARDED AT THE CONTRACTOR'S EXPENSE.

18. ALL EXISTING SYSTEMS/EQUIPMENT SHALL REMAIN IN SERVICE UNLESS

OTHERWISE NOTED.

GENERAL MECHANICAL NOTES: (APPLIES TO ALL MECHANICAL SHEETS)

E N

L A

R G

C

H A

N I C

A L

P I P

I N

G

P

L A

N

D

E M

O L

I T

I O

N

0' 1' 2' 4' 8'

GRAPHIC SCALE 1/4"=1'-0"

DE

RECORD DRAWIN

R

EC

O R

D D

R

AW

IN

G

S

- P

AC

KA

G

BREAK ROOM

CLASSROOM

ELECTRIC

ROOM

HIGH FLIGHT

CONF. ROOM

P R

O J

E C

T I

O M

WINGS

CONFERENCE

ROOM

T E

L E

P H

O N

E

R

O O

M

CLOSET

SUPPLIES

CLOSET

CLOSET

CLOSET

C L

O S

E T

C L

O S

E T

CLOSET

Mechanical

Room #1

Boiler Rm #1

Boiler Rm #2

WAREHOUSE

& SUPPLIES

COMMUNICATION

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

RESTROOM

CR4

LOADING DOCK

UPS ROOM

ELEC ROOM

BATTERY ROOM #2

MECHANICAL ROOM #2

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

ADMIN AREA

VIDEO

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CR1

CR2B

CR2A

CR3

BATTERY ROOM #1

R A

M P

V E

S T

IB

U

L E

H

H

H

G

C

C

C3

C

B

A

A

A

E5 E6 E7 E8 E9

F4

G 1

A

B

2B 1

D u c t

Sink

Air

Compressor

Trans-former

Transformer

Square D

Model 5

Electronic

Control

Center

Hot

Water

Pump

Workbench

Post

UD

Chilled

Water

Pump

Duct

Duct

Post

#3

P

U

M

P

#4

P

U

M

P

Chilled

Water

Pump

#3

Condenser

Condenser

Filter

Filter

Water

Treatment

Unit

Chilled

Water

Pump

#4

H a n k is o n

A ir C o m p r e s s o r

RAMP

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK

S I D

E W

A L K

SIDEWALK

S I D

E W

A L K

SIDEWALK

EQUIPMENT YARD EQUIPMENT YARD

EQUIPMENT YARD

EQUIPMENT YARD

CLOSET

M A

T C

H L I N

E

R

E

M

H

M A

T C

H L I N

E

R

E

M

H

MATCHLINE RE: MH-101

MATCHLINE RE: MH-102

SA1

8"Ø

SA1

8"Ø x x

8"Ø

8"Ø

Ø

SA1

8"Ø

SA1

8"Ø

SA1

8"Ø

SA1

8"Ø

SA1

8"Ø

SA1

8"Ø

SA1

8"Ø

SA1

8"Ø

24x12

Ø

Ø

SA1

8"Ø

SA1

8"Ø

SA1

8"Ø

Ø

Ø

Ø

12x10

VAV9-1

VAV9-3

VAV9-2

8"Ø

14"Ø

Ø

Ø

10"Ø

20x8 x

18x8

Ø

Ø

Ø

Ø

Ø

18x8

14x8

14x8

8"Ø x

20x8 x

XA2

22x22 x

XA1

22x10 x

XA2

22x22

Ø

8"Ø

FD

FD

FD

RESTROOM

RESTROOM

ADMIN AREA

CR1

CR2B

R A

M P

V E

S T

I B

U L

E

E5 E6 E7 E8

E9

RAMP

SCALE: 1/8" = 1'-0"

KEYED NOTES:

1. SCIF PENETRATION. SEAL PENETRATION AS

REQUIRED. SEE DETAIL #3/M-502 FOR

REQUIREMENTS.

(APPLIES TO THIS SHEET)

MH101

P A

R T

I A

L

M

E C

H A

N I C

A L

D U

C T

W O

A

N

N

R

K

0' 2' 4' 8' 16'

GRAPHIC SCALE 1/8"=1'-0"

Sheet

Reference

Number:

D e s i g n e r

S u b m i t t e r

R e v i e w e r

D r a w i n g

D a t e

S c a l e

C o n t r a c t

N u m b e r

D E

F E

N S

E

I N

F O

R M

A T

I O

N

S

Y S

T E

E

N C

Y

D

I S

A

B

U I L

D I N

G

C

H A

N I C

P

I N

G

A

N D

C O

N T

R O

L S

A F

A

P r o j e c t

M g r

A F

A

P r o j e c t

M g r

D r a f t e r

S A

N

A

N T

O N

I O

T

E X

A S

P O

S

T

O N

I O

M C

S P

E P

P E

P

US Army Corps of

Engineers ®

Fort Worth District

M E

B

37OF

W

G

C

Defense Information Systems Agency

HAVING JURISDICTION.

2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONS CLEAR.

3. ALL RECTANGULAR SUPPLY AND RETURN DUCTS SHALL HAVE TURNING VANES AT EACH 90 DEGREE

ELBOW OR TEE.

4. ALL DUCT SHALL BE SHEETMETAL AND SHALL BE INSTALLED WITH INSULATION AS SPECIFIED.

5. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED AS PER ASHRAE AND SMACNA STANDARDS.

6. MOUNT ALL NEW THERMOSTATS/SENSORS AT 3'-8" A.F.F.

7. PROVIDE AND INSTALL A SPIN-IN TYPE TAKE-OFF W/ VOLUME CONTROL DAMPER ON EACH ROUND

SUPPLY BRANCH DUCT SERVING A SUPPLY DIFFUSER/REGISTER.

8. COORDINATE ALL DUCTWORK, GRILLES, AND EQUIPMENT WITH ALL TRADES BEFORE INSTALLING.

9. TRANSITION SUPPLY AND RETURN DUCT FROM UNIT CONNECTION SIZE TO DUCT SIZE SHOWN.

10. PROVIDE AND INSTALL VIBRATION ISOLATORS ON ANY NEW HVAC EQUIPMENT WITH MOVING PARTS.

11. ALL NEW HVAC EQUIPMENT MUST BE INSTALLED LEVEL, PROVIDE CANVAS CONNECTION AT

UN-ISOLATED FAN DUCT CONNECTIONS.

12. CAREFULLY PROTECT ALL EQUIPMENT AND MATERIAL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.