This document appears to be a project description for the WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization project. The project consists of earthwork, grading, base, paving, drainage, soil nail retaining walls, and guardrail construction for a 0.68-mile stretch of road located 30 miles northwest of Davenport, Washington. The estimated price range is between $5 and $10 million, with a tentative fixed completion date in Summer/Fall 2025. The project will require construction survey and staking, contractor quality control and assurance, contractor sampling and testing, construction schedules, soil erosion and sediment control, earthwork, slope reinforcement and retaining walls, aggregate and base courses, asphalt pavements, incidental construction items such as culverts and guardrail, as well as environmental mitigation. The related federal contract opportunity is pre-solicitation number 69056725B000004, to be awarded by the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_11-13-25.pdf | ||
| Project Description Hawk Creek Road_Update.pdf | ||
| Hawk Creek_Prelim Letter Update.pdf | ||
| lincol57860(1)_PreAd PLAN.pdf | ||
| Prelim Letter_Hawk Creek Road.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO
208(1), Hawk Creek Road Stabilization
This work consists of: Earthwork, grading, base, paving, drainage, soil nail retaining walls, and guardrail
Project Location: 30 Miles NW of Davenport, Washington
Project Length: 0.68 Miles
Estimated Price Range: Between $5 and 10 Million
Tentative Fixed Completion Date: Summer/Fall 2025
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
O n e S ch ed u le
S ch
N am e
_A
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes
153 Contractor Quality Control and Assurance (yes/no) Yes
154 Contractor Sampling & Testing (yes/no) Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes
157 Soil Erosion & Sediment Control (Stream Diversion) LPSM
157 Soil Erosion & Sediment Control (Fiber roll) 12,000 LNFT
DIVISION 200 – Earthwork
201 Clearing & Grubbing 4.5 ACRE
203 Removal of Structures & Obstructions (Removal of Headwall) 1 EACH
203 Removal of Structures & Obstructions (Concrete barrier) 142 LNFT
204 Excavation & Embankment 8,000 CUYD
204 Unclassified Borrow 17,000 CUYD e S ch ed
N
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap 1,600 CUYD
257 Contactor-Designed Retaining Walls (contractor completed designs) LPSM
259 Soil Nail Retaining Walls 6,000 SQFT
DIVISION 300 – Aggregate and Base Courses
302 Minor Crushed Aggregate 2,050 CUYD
DIVISION 400 – Asphalt Pavements & Surface Treatments
403 Asphalt Concrete 1,700 TON
DIVISION 600 – Incidental Construction
601 Minor Concrete Structures (Concrete headwall for 54” culvert) 2 EACH
602 Culverts (24” pipe culvert) 115 LNFT
602 Culverts (54” pipe culvert) 65 LNFT
604 Catch Basins (Type 1) 2 EACH
605 Underdrains (French Drain) 105 LNFT
609 Gutter (concrete – minor structures) 600 LNFT
617 Guardrail (Type 2, Class A, Steel Post) 1,350 LNFT
619 Remove and Rest Gates 2 EACH
619 Remove and Rest Fence 43 LNFT
621 Monuments & Markers (construction survey & staking) (yes/no) No
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
624 Topsoil (landscaping & related items) 3.8 ACRE
625 Turf Establishment 3.8 ACRE
626 Plants, Trees, Shrubs, Vines & Groundcovers (Cuttings, Willow Pole) 360 EACH e S ch ed
N
629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment) 630 SQYD
633 Permanent Traffic Control (traffic control devices) 71 SQFT
634 Permanent Pavement Markings (traffic pavement markings) 28,500 LNFT
635 Temporary Traffic Control – Flagger LPSM
635 Temporary Traffic Control – Plastic Fence 875 LNFT
647 Environmental Mitigation (Root Wad) 19 EACH
647 Environmental Mitigation (Root Wad, anchored) 7 EACH