This document appears to be a pre-solicitation notice for the WA FLAP LINCOL 57860(1) and WA NPS LARO 208(1) projects, which involve improvements and stabilization work on Hawk Creek Road in Washington state.
The key details are: the project involves earthwork, grading, base, paving, drainage, soil nail retaining walls, and guardrail work over a 0.68 mile segment of Hawk Creek Road located approximately 30 miles northwest of Davenport, Washington. The estimated price range is between $5 and $10 million, with a tentative fixed completion date in the summer/fall of 2025. The contracting agency is the Department of Transportation Federal Highway Administration. See the attachments for additional information on this pre-solicitation opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fo
BEL
Sl'�lt 0/'
!SH COLUMBIA CANAD - - -----
WASHINGTON KEY MAP
TYPE OF CONSTRUCTION:
Grading, Pavement, Base, Drainage, Retaining Walls, Bank Stabilization, and Safety Features
DESIGN DESIGNATION:
ADT(2024)
ADT(2044)
V
15 MPH (10+30 to 14+30)
N e (max) 25 MPH (14+30 to 46+33.18) 6%
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
PLANS PREPARED BY
Jacobs
FOR
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
PROJECT MANAGER
B. STOKES
U. S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
LAKE ROOSEVELT
NATIONAL RECREATION AREA
PLANS FOR PROPOSED PROJECT
WA FLAP LINCOL 57860(1) & WA NPS LARO 208(1)
NPS PMIS. NO. 233055
HAWK CREEK ROAD IMPROVEMENTS &
HAWK CREEK ROAD STABILIZATION
LINCOLN COUNTY, WASHINGTON
R. 34 E. R. 35 E.
LENGTH 0.68 MILES
_J
R. 36 E.
1 0 1 2 3
SCALE IN MILES
'-!JLar ne d E
32± Miles
To Spokane
R. 38 E.
NPS PMIS No. 233055 NPS Drw No. 606/149761
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
SECTION INDEX
GENERAL INFORMATION
SUMMARY OF QUANTITIES
TYPICAL SECTIONS
PLAN- PROFILE
APPROACH ROADS AND DRIVEWAYS
SOIL EROSION AND SEDIMENT CONTROL
DRAINAGE
TEMPORARY TRAFFIC CONTROL
PERMANENT TRAFFIC CONTROL
SAFETY FEATURES
WALLS
See Sheet A.2 for complete Sheet Index.
PRELIMINARY
NOT FOR CONSTRUCTION
APPROVED:
SHEET
NUMBER
A.1
DATE _ _ _ _ _ _
Chief of Engineering, Western Federal Lands Highway Division
Superintendent, Lake Roosevelt NRA
DATE _ _ _ _ _ _
PRELIM
IN
ARY
SHEET INDEX
A. GENERAL INFORMATION
A.l TITLE SHEET
A.2 SHEET INDEX
A.3 PLAN SYMBOLS AND ABBREVIATIONS
A.4 VICINITY MAP
B. SUMMARY OF QUANTITIES
B.1-2 SUMMARY OF QUANTITIES
C. TYPICAL SECTIONS
C.1-2 TYPICAL SECTIONS
C.3 BANK STABILIZATION DETAIL
D. PLAN-PROFILE
D.1 SURVEY CONTROL
D.2-4 TABULATION OF MAINLINE QUANTITIES
D.5-8 PLAN-PROFILE
E. APPROACH ROADS AND DRIVEWAYS
E.l TABULATION OF APPROACH ROAD QUANTITIES
E.2 APPROACH 01 PLAN AND PROFILE
E.3 APPROACH 02 PLAN AND PROFILE
E.4 APPROACH 03 PLAN AND PROFILE
F. SOIL EROSION AND SEDIMENT CONTROL
F.1 TABULATION OF EROSION CONTROL QUANTITIES
F.2-3 SOIL EROSION AND SEDIMENT CONTROL PLANS
F.4 TEMPORARY DIVERSION BERM DETAILS
F.5 SOIL EROSION CONTROL DETAILS
F.6-11 STANDARD DRAWINGS AND DETAILS
G. DRAINAGE
G. l TABULATION OF DRAINAGE QUANTITIES
G.2 41+74 CULVERT PROFILE
G.3 INLET TREATMENT IN CUT SLOPES DETAIL
G.4 FRENCH DRAIN DETAIL
G.5-11 STANDARD DRAWINGS AND DETAILS
H. TEMPORARY TRAFFIC CONTROL
H.l TABULATION OF TEMPORARY TRAFFIC CONTROL
QUANTITIES
H.2 TEMPORARY TRAFFIC CONTROL ROAD CLOSURE PLAN
H.3 TEMPORARY TRAFFIC CONTROL SPECIAL SIGN PANEL
DETAILS
H.4-5 STANDARD DRAWINGS AND DETAILS
I.1
I.2-3
I.4-6
J.1
J.2-4
K.1
K.2
K.3
K.4
I.
J.
S H E ET IN DE X ( continued)
PERMANENT TRAFFIC CONTROL
TABULATION OF PERMANENT TRAFFIC CONTROL
QUANTITIES
SIGNING AND STRIPING PLANS
STANDARD DRAWINGS AND DETAILS
SAFETY FEATURES
TABULATION OF SAFETY QUANTITIES
STANDARD DRAWINGS AND DETAILS
K. WALLS
TABULATION OF WALL QUANTITIES
SOIL NAIL WALL PLAN AND PROFILE
SOIL NAIL RETAINING WALL TYPICAL SECTION
DETAIL
SOIL NAIL RETAINING WALL TYPICAL DETAILS
NPS PMIS No. 233055 NPS Drw□ No. 606/149761
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208(11
SHEET INDEX
SHEET
NUMBER
A.2
'"---------------------------------------------------------------------...J.. _______________________ ...J
PRELIM
LI total central angle M.L. main line Lie curve central angle M.P. mile post diameter mat/. material es spiral central angle max. maximum abut. abutment MGAL thousand gallon min. minimum
ADT average daily traffic mon. monument AH ahead appr. approach N north
BK back NC normal crown b.f. back face o.c. on center BM bench mark o. to o. out to out BP balance point OD outside diameter
br. bridge OG original ground brg. bearing OHWM ordinary high water mark btwn between
PC point of curve cc or c. to c. center to center PCC point of compound curve ({_ centerline PCS point of curve to spiral cir. clear PI point of intersection CMP corrugated metal pipe pl. plate col. column POC point on curve cone. concrete POS point on spiral conn. connection POT point on tangent constr. jt. construction joint PS point of tangent to spiral cont. continuous PSF pounds per square foot cs point of curve to spiral PSI pounds per square inch ctrs. centers PSC point of spiral to curve CUFT cubic foot (feet) PST point of spiral to tangent culv. culvert PT point of tangent CUYD cubic yard(s) pvmt. pavement D diameter
R radius DHV design hourly volume dia. diameter R. range diaph. diaphragm R/W right-of-way dist. distance rdwy. roadway drwg(s). drawing(s) reinf. reinforcement reqd. required E east rt. or RT right e superelevation rate rte. route e.f. each face El. 94.16 elevation in feet s south elev. elevation SADT seasonal average daily traffic emb. embankment SC point of spiral to curve EDP edge of pavement sect. section EQ or eq. equation shldr. shoulder EW edge of water SLRY slurry unit exc. excavation spa. spacing, spaces or spaced exp. jt. expansion joint SQFT square foot f.f. front face SQYD square yard SRS point of spiral to reverse spiral fin. finish ss point of spiral to spiral (no curve) fig. flange ST point of spiral to tangent ftg. footing STA, Sta. station
ga. gage (gauge) std. standard galv. galvanized stgr. stringer stiff. stiffener inside diameter struc. structural
IE invert elevation STS point of spiral to tangent spiral
jt. joint
KSI thousand pounds per T tangent distance T. township square inch TBM temporary bench mark L length of curve thd. thread lat. latitude TS point of tangent to spiral LNFT linear foot (feet) Ts tangent distance (spiraled curve) long. longitudinal typ. typical LPSM lump sum
V design speed (velocity) Ls length of spiral It. or LT left vph vehicles per hour LW low water VPI vertical point of intersection w west
NOTE:
1. Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
¼ Section Line
¼ Section Corner (Found, Projected)
½6 Section Line
½6 Section Corner (Found, Projected)
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
Spring or Seep
�1
-a.
�1
0Jf, D()CJ
½6 ½6 0 @
SEC. SEC.
--P/L -------P/L-----
// / // NP// / // // /NP, /// ///
///NWR/ //NWR// /NWR/// NWR ///
'V 'V 'V 'V 'V 'V 'V 'V 'V 'V 'V c-=c:i:=::c=:c::CC:::C::C::�:::c:-r::::c::c::c:r=:cc::c:C
--------- O O O �
------ 0 0 O ..,� ------
,,,,,---------- 0 l _;
CYv-
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Boulder; Well; Antenna; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Control Point (Terrestrial and GPS)
G
_2_
BH
EL. 1234.56
X
_2_
CP GPS
lJ ii ---0
G WV
NPS PMIS No 233055 NPS Drwa No 606/149761
PROJECT SHEET
NUMBER
WA FLAP LINCOL 57860(1)
WA NPS LARO 208(1)
North Arrow ------1$�----- z
EXISTING PROPOSED
Slope Stake Limits
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Top of Cut Toe of Fill
Concrete Barrier and Guard Wall
Retaining Wall
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
- no symbol -lf-- -X- -X----l( JU( JUE l!K rr ----u-- ----u-- ----u- r■ --..-----. • .------,■■-
0-0
- - - - - - - - - -'v--
[>- - - - - - - - - -'v--
� - - - - - - - - -'v--
-:�t;.- - - - - - - - - -� ' J- - - - - - - - r, UDf----
I I f------'v--
UD
A.3
Overhead/ Above Ground Utilities ---P---P- --P ---P--
Underground Utilities - - ---1 w 1- - ---1 w 1- ---1 w w 1--
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, 0 = oil, P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, STEAM = steam, T = telephone, TV = CA TV, W = water
Poles (Power, Telephone, Joint Use, ---cJ-- ---0--- ---[IT}- Light, Support w/Anchor) �
Miscellaneous Utility Features [ill ■ TP
EM = electric meter, TP = telephone pedestal, TV = CA TV pedestal, UP = transformer or junction box, WF = water fountain
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
NO SCALE
-_-_-, L-
- - - r/w - -----RIW--
- - - P/E - --PIE-----
- no symbol - --TCE-----
A A Section A-A
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
PLAN SYMBOLS AND
ABBREVIATIONS
DETAIL APPROVED FOR USE 11/2001 I DETAIL
REVISED: 9/2005 1/2007 10/2009 10/2014 I Wl0l-16/2022
PRELIM
LAKE ROOSEVELT
NATIONAL
JN///
RECREATION
Scale in miles
I
;g
� BEGIN PROJECT
� ''ALI_MAIN_0l 11 10+30.00
;g
�/////////////NP////////////////"!;_
Hawk Creek Boat Launch Parking Area Government-provided staging area
Hawk Creek Campground Area Government-provided staging area
1 2
II
l
NPS PMIS No. 233055 NPS Drw No. 606/149761
Hawk Creek Road
END PROJECT
11ALI_MAIN_0l
45+93
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
Indian Creek Rd E
SHEET
NUMBER
A.4
± 13 miles to Davenport
VICINITY MAP
�L--------------------------------------------------------------------------....1.---------------------------'
PRELIM
� Turf establishment limits :§�-----------------------.i -� § 10' ._§ :a--- - - - - -.., ::J _g/ .b JS Existing ground
� Vl a
QJ
! - - 17/,\\ ¾I\ _____ _ 1'
' , 2ee Safety Edge See Cut Slope Rounding -I'.:?, Ditch bottom
Turf establishment limits
V) See Cut Slope Rounding
QJ
5' IJ) 5'
"' a
_,, --r/�ll�'\ f '-_ Existing ground
0.25D
4" min. Ill
Riprap ditch, method A, class 1, 1 12-inch depth
Separation-stabilization geotextile, class 1, type c
12+20.00 to 14+20.00
FILL SLOPE ROUNDING
1'
10' 10' 1'
Asphalt concrete pavement, type 1, 3-inch compacted depth, placed in two equal lifts with tack coat between lifts
Roadway aggregate, method 2, 6-inch compacted depth
HAWK CREEK ROAD
10+30 to 14+30
Shldr.
1'
See Safety Edge
Turf establishment limits
5'
See Fill Slope Rounding
:§ 11 +19 to 13+18
5' 5'
Slope sta1 Hmn w· :e ::J a
�l7Sv Tl�'( � Existing ground
CUT SLOPE ROUNDING
Aggregate base course First lift of asphalt
Second lift of asphalt
SAFETY EDGE
NO SCALE
NPS PMIS No. 233055 NPS Drw No. 606/149761
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
TYPICAL SECTIONS
Sheet 1 of 2
SHEET
NUMBER
C.1
PRELIM
"'= _______ T,_u _rf_es_t _a _bl_is _h _m_ e_n_t _l _im_,_·ts _____ ___ C:
Existing ground a --
,Tl,\ ¼\\------ 1'
Shldr.
Match slope of soil nail wall, use 3/8" premolded joint filler between concrete gutter and shotcrete facing
Gutter, concrete See Note 3
Bedding material, 4-inch compacted depth
See Cut Slope Rounding
' ' , , See Safety Edge _z';-.,, '<C" ' ' '
Ditch bottom
Turf establishment limits "'=---------------- _.§ 10' "'= c:---- - - - --:§ s 19
Existing ground a o..
Vi -------77��v7>,_�------
See Note 2
See Cut Slope Rounding
4" min.
I
I
6" min.
Varies 2' to 3'
Riprap ditch, method A, class 1', 7- 12-inch depth
Separation-stabilization geotexti/e, class 1, type c
14+80.00 to 19+00.00
19+90.00 to 20+00.00
25+90.00 to 26+00.00
->7 ,1-);W'i'.0.�
Existing ground
Soil Nail Retaining Wall \ See Section K \
CONCRETE GUTTER DETAIL
lJ) IQ
<IJ
't:: .8
Lr) c:i
I
Varies 10'-11' Traveled lane
Profile grade
Varies 10'-11' Traveled lane
2% Crown
1' Shldr.
I
I
I
Asphalt concrete pavement, type 1, 3-inch compacted depth, placed in two equal lifts with tack coat between lifts
Roadway aggregate, method 2, 6-inch compacted depth
HAWK CREEK ROAD
14+30 to 45+93
1' , Paved
Shldr.
1'
Turf establishment limits
See Safety Edge
Embankme�: l
Varies O' to 1' Gravel Shldr.
1' Guardrail Shldr. See Section J
See Safety Edge
Turf establishment limits
I ' ' ' ' ' lJ)
',,1 I - --iunclassified borrow
See Note 1
NPS PMIS No. 233055 NPS Drw No. 606/149761
5'
5' C:
B s
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
Existing ground
717/08/75,,\\ - - - -
See Fill Slope Rounding
C:
u ::, .l::.
a
»1;15,�;
;st;ng ground
See Fill Slope Rounding
SHEET
NUMBER
C.2
15+16.00 to 29+26.50
1' Shldr.
Turf establishment limits 1'
Shldr. Hinge
See Concrete Gutter Detail
20+00.00 to 25+90.00 29+26.50 to 45+93.00
NOTES:
1. Do not use roadway excavation material to construct fill where slopes are steeper than 1 V: 3H.
2. If bedrock is intercepted behind the limits of the riprap ditch, remove overburden from in front of rock and leave rock face undisturbed.
3. See Subsection 609.0S{a) for contraction and expansion joint requirements. NO SCALE
TYPICAL SECTIONS
Sheet 2 of 2
PRELIM
NPS PMIS No. 233055 NPS Drw No. 606/149761
NOTES:
C
I
Pavement structural section, See Typical Section Sheets
Stainless steel wire rope clips, fasten after tightening cable around log
Stainless steel thimble
3/4" dia. stainless steel threaded eye bolt set in epoxy adhesive in 7/8" dia.
holes, 6" deep
1. Place Cuttings, Willow Pole (min. 7-foot length) on 3-foot max. centers between elev. 1283 to 1288.
Construct riprap to minimum elev. = 1292.00'
I
I I I I
I I I I
Cuttings, willow pole See Note 1
Ordinary High Water (Full Pool) elev. = 1290.00' Mitigation, root wad, or Mitigation, root wad (anchored) See Note 2
I
I
Slope +5° from horizontal
See Boulder Anchor Detail, See Note 3
Filter rock, 12-inch compacted depth
BANK STABILIZATION DETAIL
11 +19 to 13+18
Backfill with conserved . .
streambed material
L ExiSttng ground
---------11/A\W��-----
1' min.
Bank stabilization control line, See Section D
Placed riprap, method B, class 7
1/2" stainless steel wire rope wrapped twice
Mitigation, root wad (anchored)
BOULDER ANCHOR DETAIL
Stainless steel wire rope clips fasten after tightening cable around log
Stainless steel thimble
3/4" dia. stainless steel threaded eye bolt set in epoxy adhesive in 7/8" dia.
holes, 6" deep
Use D 100 rock from class 7 riprap for anchors (typ.)
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
SHEET
NUMBER
C.3
2. Acceptable species for rootwads are Ponderosa Pine and Douglas Fir. Harvest rootwads with a 16-foot minimum length and diameter of 12-inch to 36-inch. Place rootwads with a 10-foot minimum embedment depth, spaced at 10 to 12-feet o.c.
BANK STABILIZATION DETAIL
3. Use boulder anchors for root wads with DBH of 30-inches or greater. Install boulder anchor approximately 3' back from root collar. NO SCALE
PRELIM
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
HAWK 1 307199.740 2256698.020 1293.520 N047°48'52.688" W118°19'28.576" 1230.81 0.9998974 5/8" IR w/FHWA alum cap 1.
HAWK 2 307636.700 2255794.810 1315.060 N047°48'57.289" W118°19'41.595" 1252.33 0.99989625 5/8" IR w/FHWA alum cap
HAWK 3 307496.090 2255563.370 1300.620 N047°48'55.976" W118°19'45.051" 1237.89 0.99989698 5/8" IR w/FHWA alum cap
103 307589.130 2255864.740 1310.870 N047°48'56.797" W118°19'40.594" 1248.20616 0.99989647 TGT1 #5 Rebar with 2 1/2" Alum Cap
1000 306973.730 2257010.990 1369.490 N047°48'50.358" W118°19'24.101" 1306.78544 0.99989383 BASE #5 Rebar with 2 1/2" Alum Cap 2.
141 307677.770 2258810.180 1391.280 N047°48'56.723" W118°18'57.416" 1328.84577 0.99989261 TGT20 #5 Rebar with 2 1/2" Alum Cap
180 308227.390 2256906.580 1499.100 N047°49'02.758" W118°19'25.031" 1436.4 0.999887318 N 1/4 COR 3" w/BLM 3" Brass Cap 3.
182 308331.010 2259545.490 1589.350 N047°49'02.929" W118°18'46.334" 1526.67 0.999882992 NE SEC COR w/BLM 3" Brass Cap
4.
Static sessions of 2-1/2 hours each were acquired for points TGT1, BASE, and TGT20 and processed through NGS OPUS to provide coordinate and elevation values.
OPUS used base stations DRYLNDRSH_WA2004 CORS ARP, WSUOTHELO_WA2004 CORS ARP, and BREWSTER VLB CORS ARP to solve positions.
RTK procedures were used to locate other controlling monuments.
PROJECT : Hawk Creek
DATE OF FIELD WORK : 9/2021
DATE OF FINAL ADJUSTMENT : 9/2021
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : NAD83 (2011) Washington North Zone
EPOCH DATE : 2011
VERTICAL DATUM : NAVD 88 Using Geioid18 from OPUS
MEAN PROJECT COMBINED SCALE FACTOR: 0.999894303333
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
Use 1.000105707840 (reciprocal of 0.999894303333) as a sitewide scale factor to get ground distances.
C
U se rs \f ol ks m \P ro je ct W is e\
Ja co bs E ng in ee ri ng G ro up
\H aw k C re ek R d S ta bi liz at io n\
D el iv er y\ W
FL
P ro je ct
8- A ug
-2
4:
P
M A
D es ig ne r
D
C he ck er
D es ig ne d by
C he ck ed b y:
PROJECT
D.1
SHEET
NUMBER
WA FLAP LINCOL 57860(1)
WA NPS LARO 208(1)
SURVEY CONTROL
WA NPS LARO 208(1) NPS PMIS No. 233055 NPS Drwg No. 606/149761
PRELIM
23 A�ust 2024 9:27 AM c:\pw workdir\jacobs-us-va-pw-02\d0154410\lincol57860(1) pin D2-4.dgn [Tabulation of Mainline Qtys 1 [Sheet]]
� :i; :i; :i; :i; :i;
:i,. < It; It; It; It; It; ::a:: 0 :i,. :i,. :i,.
� :g :g :g 0 C:
l;:IJ l;:IJ l;:IJ 1< 1< 3 0 0 0 0 0 (1) w f\J ..... � ..... ..... {/) ' ' ' ' ' r-
Ill
..... ..... C: 0
� � � 0 3; Q 5· g � it it ul ::!
\:I !") 0 0 0 n, :::c .... ...,. ...,. < 0 0 r, � ..... (1) V, � r, + it C:
d d d
\0 0- \,J 0 r;·
� � � i ..., Ill Ill Ill 5l-'"' (") Volumes_Cut :-,.
-�!b � ,°' , ..... C: (Total Cut volume excluding topsoil) Co \0 Co -<:
5· 0 � f\J ..... � \,J f\J ti Source:ORD, Quantities by Named Boundary \0 f\J '-.J \,J f\J {/) \,J Co °' C:
0 f\J (") Volumes_Fi/1 ..., f\J f\J r, , ..... , ..... ,o ,o C: (Total Fill volume including Topsoil) -<: 0 °' ..... � Co f\J � ..... \,J ti :3 °' ;j '-.J u, \0 0 \0 Source: ORD Quantities by Named Boundary
\0 � ..... Co '-.J V, f\J r, ,.,.
Exist Topsoil (removed) (1) (") Q_ C: (existing topsoils in cut)5· \,J \,J \,J -<:
I I I 0 °' ti Source: ORD Quantities by Named Boundary "tJ °' °' n, ..... 0 r, (1)
(") Exist Topsoil (removed and replaced) C: (existing topsoil in fill)
\0 I I I \0 Co f\J b ..... ..... Co °' Source: ORD Quantities by Named Boundary \,J 0 \,J '-.J
Shrink/Swell Factor I I I I I �
Source: Geotech reommedation dated 8/28/23 0 0 0 0 0 'cJ2, 'cJ2, � � � 0 0 0
(") Specific areas with unsuitable material C:
I I I I I b (Asphalt Milling in roadway prism)
0 0 0
Assumed percent unsuitable � 0
0 0 0 0 0 Source: Geotechnical recommendation dated 8/28/23 'cJ2, � � � �
(") Unsuitable material based on Volumes_Cut and C: Assumed Percent Unsuitable
I I I I I b 0 0 0
Topsoil removal Depth I I I \,J \,J
Source: NPS
(") Item ,'-I ,'-I C: 20401-0000 ,l.n , b.... .... f\J Co ROADWAY EXCAVATION Bl .i::,, f\J ..... .... w Co
00 \0 f\J '-.J '-I � \,J
8 Additional Excavation (See Note 2) ti
0 0 0 for info onlv
(") Topsoil Stripped from Cuts C:
\,J \,J \,J ti °' °' 0 °' for info only ..... 0 I I I ..... 0
C: Estimate of Unsuitable Material b for info only
0 0 I I I 0 I I
(") Total Unadjusted Excavation Available for Fill � ,°' -� , ..... C:
Co � � � b for info only 0 � f\J \,J Co \0 f\J '-.J °' \,J f\J
Total Adjusted Available for Fill
� ,°' -� .!'-'- C: (adjusted based on shrink/swell factor) ..... 0 � °' b f\J � f\J ..... Co � � for info only \,J \,J °' ..... V, 0 0 0
(") Embankment f\J ..... ..... C: ,o , ..... ,\0 ,\0 -<:
� ..... Co f\J � f\J \,J ti for info only ;;::i � '-.J gJ ..... °'
°' � ..... � Co °'
-I (")
► C: Additional Backfill Needed (See Note 3) ti
0 0 0 for info onlv C:
(+) r- (")
,0 � C: Topsoil stripped from embankment foundation areas
\0 \0 Q) ti ..... ..... Q) f\J for info only (/) C: ..... w 0 I I I w '-.J °'
:::J'" ► 0 Total Fill Needed �zz (") f\J f\J f\J C:
::�o , ..... , ..... ,o ,o -<:
°' ..... Q) f\J � ..... w ti for info only °' ;;::i � 'I V, \0 0 \0 \0 � ..... Q) '-.J u, f\J
0 -1"11 -ti ..... I ' ' (") Total Adjusted Available For Fill less Total Fill Needed w m 3: ..... I ..... ..... C: ,ui ..... -� ,ui b en► ', I I
"' � ' Co f\J � °' for info only f\J ..... °' � ..... °' � ..... 0\ \0 'I \0 \,J '-.J V, Co z Waste (") r- C:
ti for info only z 0 0 0 m .... .... (") Item ,Ill .... ,.i::. ' C: 20403-0000
.... .i::,, bN .... UNCLASSIFIED BORROW 01 10 '-I ..
.,I
::e g
:b
C:
i
::Q
:i!
::Q tn C:
::Q
0:1 r-, n, C:
'"'I r-r-, z► -c,"C "'C a s;;z ;o n 0� r-Jl/1 o--., � (!) r-, >-- °' ,_.,,Q tn �
"Cl cl
2 "Cl {/) "Cl 3:
tii ? "' w w 0 l/1 l/1
"Cl {/)
0, � f/J.
3: I
I� p ... <D ...., "' m
PRELIM
NPS PMIS No 233055 NPS Drwa No 606/149761
PROJECT
SHEET
NUMBER
WA FLAP LINCOL 57860(1)
D.3
WA NPS LARO 208(1)
ROADWAY QUANTTTIES
LOCATIONS
ITEM DESCRIPTION UNIT "ALI MAIN 01" TOTAL NOTES
10+30 to 14+30 14+30 to 45+93
20101-0000 CLEARING AND GRUBBING ACRE 0.3 4.0 4.3
20401-0000 ROADWAY EXCAVATION CUYD 1,883 5,234 7,117
20403-0000 UNCLASSIFIED BORROW CUYD 0 14 417 14 417
25101-2700 PLACED RIPRAP, METHOD B CLASS 7 CUYD 1,453 0 1,453 Bank Stabilization
25120-0100 RIPRAP DITCH METHOD A CLASS 1 LNFT 166 498 664
30201-2000 ROADWAY AGGREGATE METHOD 2 CUYD 1 454 0 1 454
40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 CUYD 177 1,623 1,800
40101-5600 R.ATORY MIX 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AG TON 163 1,395 1 558 Antistrio Additive, Tyoe 3 (For Information Only) TON 2 14 16
Tack Coat (For Information Only) TON 1 4 5
60905-1000 GUTTER CONCRETE LNFT 0 590 590
62406-0200 PLACING CONSERVED TOPSOIL 3-INCH DEPTH ACRE 0.4 3.2 3.6
62501-0000 TURF ESTABLISHMENT ACRE 0.4 3.2 3.6
62635-3000 CUTTINGS, WILLOW POLE EACH 340 0 340 Bank Stabilization
64703-5000 MITIGATION ROOT WAD EACH 16 0 16 Bank Stabilization 64703-5000 MITIGATION, ROOT WAD (ANCHORED) EACH 7 0 7 Bank Stabilization
TABULATION OF MAINLINE
QUANTITIES
Sheet 2 of 3
PRELIM
LOCATION
ITEM 20302-0700
REMOVAL OF FENCE
QUANTITY
SIDE
(LNFT)
"ALI_MAIN_01" 42+D0 to 42+34 RT 34
TOTAL 34
ITEM 20302-1300
REMOVAL OF GUARDRAIL, CONCRETE BARRIER
LOCATION
"ALI_MAIN_01" 11�1 to 12+92
LOCATION
"ALI_MAIN_01" 41 +25
QUANTITY
SIDE
(LNFT)
RT 142
TOTAL 142
ITEM 61920-2000
REMOVE AND RESET GATE
QUANTITY
SIDE
(EACH)
RT 1
TOTAL l
REMARKS
REMARKS
REMARKS
NPS PMIS No 233055 NPS Drwa No 606/149761
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208(1)
TABULATION OF MAINLINE
QUANTITIES
Sheet 3 of 3
SHEET
NUMBER
D.4
PRELIM
END WA NPS LARO 208(1) PI 12+44.59
SHEET
Construction limit
____ PR_o_JE_cr ____ --+-N�uM_B_E-1 R
,__ D.S
BANK STABILIZATION LAYOUT POINTS
BEGIN WA FLAP LINCOL 57860(1)
''ALI_MAIN_01" 14+30.00
1::i = 60°22'25" (LT) R = 180.00'
''ALI_MAIN_01" Line to be constructed "'
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
Point Northina P1 307462.12 P2 307471.08 P3 307464.74 P4 307481.37
PS 307475.59
LEGEND:
Eastina 2256046.38 2256111.59 2256155.42 2256287.50 2256306.99
/dN / / /' /
Elevation 1276.05 1277.43 1277.02 1276.53 1277.47
/ / dN / liAWK2
N = 307637. 99 E = 2256360.17
/ NP
/ ,,. / ,,, ..______ SB
T = 104.71' L = 189.67'
0 0
Slope stake limit
P.
N
/ / ::::::::.- � ....... ilo,i;l;i__:--..:::I:!=/J-- / / ----------_
Edge of pavement --- --- /
:f.� //
___,,, See applicable typical section
"ALI_APPR_01"
� -�� , L
2 0 1 - Remo_val of guardrail,-- for pavement structural detail "Q -138'.fr�®n::)ib-,- L
� • �--r-,cn==""' r;�
:ri\:J�� ¼ J:
lcr i?'z..:c:,;
!J;J concrete barrier
PI 16+41.94
Existing roadway 11+61.,_to 12+92
PS
control line
1::i = 62°21'13" (RT) R = 292.00' T = 176.68' L = 317.78' e=5%
Existing trees, protect in place
PAVEMENT CONNECTION DETAIL
Mitigation, root wad_ (typ.)
See Notes 1 and 2 • •.
1 320
1 310
1,300
1 290
16+90.00
BEGIN PROJECT
BEGIN CONSTRUCTION
WA NPS LARO 208(1)
�/ 1, / , r ' / • -- ...... .,...\ ...... ,
· · · · · · · i · · ''ALI_MAIN_01" 10+30.00- -:-· . . . . . . . ,.,.- .,, • 1 320
N = 307581.21 E = 2255995.49 :
� l.lJ C
C:
�l.gMatch existing r�adway elevation Riprap ditch� Method A, & tl and cross-slope : � Class 1 -:::i: Jl
• • • • LI") • 0 co • I
12+20 t 13+74 Lt • I · '::.J al · /
SSD = 223'
K.,; 23
200'VC
: : : : g : � � : 0 . : ,: Cl) : �\ol.
....... ; .................. : .................. : .................. : .... -.:-i� ........... : ............ .g g. ; ................. ; .................. : .......... -....... ·:- ... � ; .......... :" ................. '
+M . ",",, '/ . .
1 310
� ,...., Profife grade :
xr
1.
// � Ex�
·sting ground
: -1.00o/Q V �--....;;�--s--,_,___A : 1 Guardrail System, MGS, Type 2, : 1 (i) C/a�s A Steel Posts; ?ee Section J
13+79:
-- - ·sso· ;.,· 3201•
K = 25:
100· v¢
Standard underdrain . .
system :(French Drain): co
;: : 15+58.0 to 29+01.5 Rt I : .... ·/. ··
Riprap ditch, fv!ethod A, Class 1:
14+11 to 19+00 Lt
......................... : .................. : .............. - ... : ......... See. Se.ction. G .......... : ................. : ........ ·�- ... g �- .. - ... Stcmc/?J.IJ/ __ l)_(J(;i_�[(;i_r_q{fJ ..... : .................. :
: : : : : : ;!:; ci � system (French Drain) : :
I r1aced riprap, method B, class � I ...., � @ See Section G
11+19:to 13+18 Rt � � �
1,300
1 290
Slope stake limit
Construction limit
6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
NOTES:
(f) Terminal Section, type MGS tangent 1. Place rootwads as shown in the Bank Stabilization Detail at a spacing of 10 to 12 feet apart along bank toe and at an orientation of 20 degrees from perpendicular to the stream flow with the rootwads angled upstream.
2. Starting at the upstream end of the bank stabilization, alternate between mitigation, root wad (anchored) and mitigation, root wad until supply of logs with DBH greater than or equal to 30-inches in diameter has been exhausted. Refer to Subsection 647 for additional requirements.
PRELIM
FOOTNOTES:
(j) Begin Special Ditch, 19+30.00, 15.1' Lt, El. 1329.76
(l) Special Ditch, 19+60.00, 16.0' Lt, El. 1329.35
@ End Special Ditch, 19+60.00, 17.2' Lt, El. 1331.05
HLSD =;= 219'
1 350 . . . K = 41 .
"ALI_MAIN_01" Line to be constructed
1 350 . . . . . jijiio ii�ifbii�? A; ci�;; .i ..... ·. · . . . . . . . . . . . . 3·cJii\ic·
1 340 7
Riprap ditch .t.
Method A, Class 1:
19+90 to 2u+_oo Lt
• • r • 1 340
- • - • • • • i - • - • - • - • - - - - - • - • • ·, • • - • - • - • - • - - - - - • - · ,· • • • - • - • - • - • - - - - - • :,,· • • • - • - • - • - • - - - - ,- • - • • • • • - • - • - • - • -
PrQfile grade 0 0'
: +2.200fo . _.,- � . � � 1,330 � /'-
: -�'>-},-✓;� � Existing �round __ . _____ ... _ -� 6.
(])----!_:- r •� 19+40 :
,/ - -,, ./ � 24_-inch pipe culv�rt
See Section G :
Soil Nail Retaining Wall, See Section K
1 320 20+00 to 25+90 Lt
Guardrail System, MGS, Typ� 2, Class A Steel.Posts; See Sectiqn J 15+58.p to 29+01.5 Rt
18+00 19+00 20+00 21+00 22+00 23+00
1,330
1 320
24+00
NPS PMIS No. 233055 NPS Drw No. 606/149761
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
SHEET
NUMBER
D.6
PRELIM
0 �:'
Pei /S-1-06,96
J" ', Joo!)\ t'\
111,,, -1-1-. 0- 0�' R-t�
OM
--+----PIE
02"
PI 29+55.41
11 = 38°00'51" (RT)
R = 292.00' T = 100.58' L = 193.73' e=5%
PI 35+13.56
11 = 15°04'35" (RT)
R = 673.00' T = 89.06' L = 177.09' e = 3.6%
NPS PMIS No. 233055 NPS Drw No. 606/149761 w 'J
-- r/w -
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
e = 3.6%
SHEET
NUMBER
D.7
1 390 OM················'··················'·················· '··················'················· .. ··················'··················'··················'·················· ················,················o·M · · . . . . . 1 390
LEGEND:
1 380
1,370
11,360
000 �LIJ :�LIJ
rt� O c: :c:, C:
N �� :�� o..t :o..t it;:�10 . ,/
I I
I
, \ : I
24-inch pipe culvert See Section G
--.J Riprap ditch, method A, class 1: -, !• ... 25.+90 to. 26+.00.
0.. QJ ·0.. QJ
....,1 QJ :
....,1 QJ
..JQJ ,..JQJ
�(/) :�VJ
HLSD ·= 162'
K � 27
160'VC
\ 0 \o M ci 1/1 O'ci + r-., O"I M '- N .--I -
Soil Nail Retaining Wall, See Section K
20+00 to 25+90 Lt
1 350
25+00
Guardrail System, MGS, Type 2, Clas� A Steel Posts; $ee Section J
: 15+58.0 to 29+01.5 Rt
26+00 27+00 28+00 29+00 30+00
(i) Terminal Section, type MGS tangent
31+00 32+00
Prof[le grade
33+91 24-inch pip� culvert See Section: G
33+00 34+00
HLSD = 223'
K = 42
200' vc
35+00
I r- �
-I� - - •• - - - - - - • - - - -
I
36+00 37+00
1,370
1,360
1 350
38+00
PRELIM
PI 37+48.94
/l = 11 °37'39" (LT) R = 673.00' T = 68.52' L = 136.58' e = 3.6%
Construction limit
"ALI_MAIN_01" Line to be constructed
- r/W -
-x--x--x·
_ .. - ""C _ .. - -I
....-'l,�,Y-;.-- 42+00 to 42+34 t
-;.--- ----v,(emove and Removal of fence t, 4 __- __- reset gate �
Y 0 41+25 PI 42+47.06 o
__-< � fl = 23°43'46" (RT) -;.__- _,.. R = 944.00' ---
Edge of pavement � T = 198.32' -� L = 390.96' e=3% Construction limit
0 CX)
. . . . . . �v 1 410 ....... , ................. , .................. • .................. • .................. • .................. , ............. <P.O . . . . . . + v vT""I v u,�
� :j \ Lt) Cl I0 0 _l + r..j 0, I
I
I
I
GPs
1 400 .... SSD. = ·?66' ............... : ....... .' ' ' ' ' ' - . - . - . - � - - - . - . . . . . - . - . - . - ·. - - - - - . - . . . . . - . - . - .. - . - - - - - . - . . . . . - . - .. - . - . - - - - - . - . . . . . - .. - . - . - . - - - - - . - . . . . . � . - .
1,390
1,380
1 370 38+00
0 i:o 0 0\ Lt) i:o°' CIC
+M
. "CX) ,-I ...
M:
SSD =: 304'
• ·K =:38· ·
200·:vc
39+00
- -= l. Q_O Yo
40+00 41+00
Profile grad_e . ,., K =120
/' \.-1.00' vc
.... HLS0.=.1.57' . /
K:= 26
234'VC
1' _, b Ooci CX)
,-I r-.i+ooNMv ,-t
42+00
, /, / \ Ex;s,;ng ground
41+74 Remove existing culvert (2: each) Install 54�inch pipe culvert:
See Section G
43+00 44+00 45+00 46+00
NPS PMIS No. 233055 NPS Drw No. 606/149761
PROJECT
N
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
ENDPRO.JECT
END CONSTRUCTION
WA FLAP LINCOL 57860(1)
"ALI_MAIN_01" 45+93.00
N = 307935.11
E = 2258742.82
Match existing roadway elevation and cross-slope
1 410
1 400
1,390
1,380
1 370 47+00
SHEET
NUMBER
D.8
PRELIM
SHEET
NUMBER
WA FLAP LINCOL 57860(1)
E.1
WA NPS LARO 208(1)
ROADWAY QUANTITIES
ITEM DESCRIPTION UNIT
LOCATIONS
TOTAL NOTES
"ALI APPR O 1 " "ALI APPR 02" "ALI APPR 03"
20401-0000 ROADWAY EXCAVATION CUYD 17 2 29 48
20403-0000 UNCLASSIFIED BORROW CUYD 243 869 17 1,129
30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 61 50 14 125
40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 54 0 0 54
Antistrip Additive Type 3 (For Information Only) TON 0.5 0 0 1
Tack Coat (For Information Only) TON 0.14 0 0 0
ITEM 61920-2000
REMOVE AND RESET GATE
QUANTITY
LOCATION SIDE REMARKS
(EACH)
"ALI_APPR_02" 201-+48 LT 1
TOTAL 1
ITEM 61921-1000
REMOVE AND RESET FENCE
QUANTITY
LOCATION SIDE REMARKS
(LNFT)
"ALI_APPR_02" 201 +37 to "ALI_APPR_02" 201 +43 LT 8
"ALI_APPR_02" 201 +51 to "ALI_APPR_02" 201 +76 RT 35
TOTAL 43
TABULATION OF APPROACH ROAD
QUANTITIES
PRELIM
C
. a:
Ditch bottom
Turf establishment limits 12'
I
12'
Traveled lane Traveled lane
Asphalt concrete pavement, type 1 3-inch compacted depth, placed in two equal lifts with tack coat between lifts Roadway aggregate, method 2 6-inch compacted depth
100+11.00 to 101 +07.50
APPROACH01
TYPICAL SECTION
"ALI_APPR_01"
Turf establishment limits if
I /
I I I I I '
I I
I
I
I
"ALI_APPR_()l" 100
. I \ •. I I
''ALI MAIN
I, h I, I
- I -
I I
V I
1,302
1,300
NPS PMIS No. 233055 NPS Drw No. 606/149761
• ✓�I\, ��/ PROJECT Nt��R
� \ J WA FLAP LINCOL 57860(1) E 2 WA NPS LARO 208 1
I --------r
Existing kiosk, -- ---=---'- ti I \ protect in pla_ce l(!ff t'n:tr�':te� n
If\___/ -t- END CONSTR.UCUQN - - .:: --::: - ..J
1/, -------
((;; ,,,,,., .,,."ALI_APPR__.01''_1J)1 +07.50 _,, - - - - Edge of pavement / N � 307581.48 I - - -
1// 11 /" .-- .--1: = 2256468.83 - - - - - - Slope stake limit
II f ,s/ ,,- ,, ,, El. 1295•23 Construction limit
OM
0 r- \D ,...., MO
+M 0,...., ,...., ...... ·····••-=1,=3=02::...i..:1:.,.;2::..:9;;..;:8;.__
Profile grade M N
Ill
CJ\
N
- - - - .. - - - - - .. -..=..L:.=�;L.:!I,;�- ...... - ; - . - - - :,-:-1. - - •••••••• - • - • - - - - - - - - •••••
1 298
1 296
I
I
1 298
Profile grade
1 296 ...................................................... - --l 296 1 292
100+00 100+50 101 +00
I I
···· .. •····•••····J·�•�··/· Existing ground
1,294
1 292
APPROACH 01
PLAN AND PROFILE
PRELIM
C . a:
u
Turf establishment limits 8'
Traveled lane
Profile grade
I 1:2 __ q;_
I 8'
Traveled lane
2% Crown
Turf establishment limits
BEGIN CONSTRUCTION • .. \ . \
"ALI_APPR_02" 2 0+20.oQ·. �--.
N = 307276.96 '\ E=2257281.14 ,· \\ El. 1369.35 \ ,··.
C t . 1· .� ons ruction ,m,t ,i, NPS PMIS No. 233055 NPS Drw No. 606/149761
\, PI 201+47.18 PROJECT
\ 1) '\ 'f
/J. = 57°59'46" (LT)
R = 50.00'
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
T = 27.71' t°'v L = 50.61'
<::) e = NC "' rJ>
•• ct:: '
� �- .. PI 200+43.
• •• ,..; I'<) '/J, = 66°24'58" (
['\j ',t • • I '......_
+ "'-I··. R=40.00.. --:- -...:.
', • T = 26.18'
• L ;, 46.37' Edge of gra_ve �e = Ne···• shoulder··
R�[!!OVe and reset ga - 201+48
Remove and reset n +s1 to 201+16
I_APP - lope stake limit
LI_MAIN�Ol :,f:�51-�END CONSTRUCTION
''ALI_APPR_02" 201+75.30
N = 307132.09 E = 2257289.85 El. 1357.38
Remove and reset fence 201+37 to 201+43
Construction limit Slope stake limit ''ALI_APPR_02" Line
-,..---'I-
SHEET
NUMBER
E.3 l Existing ground 2% Crown
A� �-----------------
Roadway aggregate, �ethod X - - - - - - - - - - - - - - - - ___ _ �� ui CX)
6-inch compacted depth
200+20.00 to 201+75.16
APPROACH02
TYPICAL SECTION
"ALI_APPR_ 02"
1 370
1 368
1 366
,;t \0 ··········4M-······················:-·····················,···· </.n O,.., ' '
-� 0. • • Yo N , ............. �$P. .":'.H>.� ..
K=4
30' vc
1 364
"000 • Profile grade:: \ "
\ '1,362
1 360 ', · . HLSD = 50' :
1 358
· · · · · · · · · · · · "�; � �· · · i · · · 7· Existing grou · :0 i.=.L==---
I /
\" ·,.- - I
. \ . � /, I /
M -
1 356 -. -. -. - - . - - - · :· ...... -. -. -. - - - -\-. -.. ·: · ..... -. -. - - -rv, r-!;,-_ _..,,_ �. -. i.,. - - - - -
: 1, : ,.- " !"1--1.J"! : I/
1 354 200+00 200+50
,_.;...,..,_,,,._ '-J� [;:;, I
OM
N,-, 201+00 201+50
1 370
1 368
1 366
1 364
1,362
1 360
1 358
1 356
1 354
APPROACH 02
PLAN AND PROFILE
PRELIM
C .a:
Turf establishment limits
(i.
Varies I
2.5' to 6'
Traveled Jane
6'
Turf establishment limits
______ P_:
l
<J_!
l i�e !!�a�e
1� 3% t,3
Ditch bottom
6" min. Ditch 6" min.
l bottom Roadway aggregate, method 2, 6-inch compacted depth
300+20.00 to 300+81.00
APPROACH03
TYPICAL SECTION
"ALI_APPR_ 03"
''ALI_APPR_03" 300+00.00 =
''ALI MAIN 01" 30+80.00
1 374
1 372
1 370
1 368
M
ID
M
NPS PMIS No. 233055 NPS Drw No. 606/149761
SHEET
NUMBER
E.4
END CONSTRUCTION
to be constructed
�P)JEGIN CONSTRUCTION
"ALI_APPR_03" 300+20.00
N = 307381.51
E = 2257348.71
El. 1369.97
''ALI_APPR_03" 300+81.00
N = 307368.06
E = 2257290.66
El. 1374.45
0 Lil 0 Lil .-1 M
ID I'
+M 0 .-1
<§)o( ,..- - _
>rA·� - Lil 1 374
............... ··········:········M-
(J"I
ID
.-1 I'
CV"!. '
':;-o\0 / K=3 st st I'
M .-1
- �" / ......................... /. ·-v·· .:> .... .25'. .vc
HLSD = 39 ,/ x I K = 2 1
25' vc I
Profile grade
---<·r�
_j 0 cviO"I
M .-t Existing ground + o 0 I'
OM
M .-1
1 372
1 370
1 368
300+00 300+50
APPROACH 03
PLAN AND PROFILE
PRELIM
SHEET
NUMBER
WA FLAP LINCOL 57860(1)
F.1
WA NPS LARO 208(1)
EROSION CONTROL QUANTITIES
LOCATIONS
ITEM DESCRIPTION UNIT "ALI_MAIN_01 11 TOTAL NOTES
10+30 to 14+30 14+30 to 45+93
15705-0100 SOIL EROSION CONTROL SILT FENCE LNFT 159 96 255
15705-1400 SOIL EROSION CONTROL FIBER ROLL LNFT 803 10 239 11 042
15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 8 22 30
15706-1000 SOIL EROSION CONTROL INLET PROTECTION EACH 0 2 2
15706-1600 SOIL EROSION CONTROL STABILIZED CONSTRUCTION EXIT EACH 0 1 1
63503-1000 TEMPORARY TRAFFIC CONTROL PLASTIC FENCE LNFT 0 832 832
I
I
I
TABULATION OF EROSION
CONTROL QUANTITIES
PRELIM
Legend:
BEGIN PROJECT
WA NPS LARO 208(1)
''ALI_MAIN_01 II 10+30.00
Fiber Rolls Check Dam Silt Fence
LARO 208(1)END WA NP�
LAP LINCOL 57860(1)BEGIN WA,,
"ALI_MAIN_01" 14+30.00
Soil erosion control, SOIL
NPS Drw No. 606/149761 NPS PMIS No. 2330SS
SHEET
PROJECT
NUMBER
WA FLAP LINCOL 57860(1)
F.2
WA NPS LARO 208 1
EROSION AND SEDIMENT
CONTROL PLANS
PRELIM
; Legend:
Fiber Rolls i _ _ Check Dam
• - - Silt Fence stake fi\it
Constructio_n I n o trol, stabilized cons
NPS PMIS No. 233055 NPS Drw N o. 606/149761
PROJECT SHEET
WA:
A
LAP LINCOL 57860(1)
NUMBER
NPS LARO 208 1 F.3
N
ENDPRO.JECT
WA FLAP LINC
"ALI
OL 57860(1)
_MAIN_0l" 45+93.00
SOIL EROSION A
PRELIM
N
Approximate stream braids
Approximate stream braid centerline (diversion channel)
NOTES:
I \ '
I
SCALE IN FEET
0 100 200
1. Typical diversion section shows the estimated diversion channel and embankment dimensions required. Diversion channel and embankment dimensions may vary. Construct diversion berm to a minimum height of 6 inches above the water surface elevation.
2. These options suggest configurations for diverting a stream during construction operations. Alternate stream diversion methods may be chosen (including any approved prefabricated or portable diversion berms, dams, etc.).
Submit temporary stream diversion plans for approval prior to installation.
3. Place a maximum of one diversion in the stream at any given time.
4. While in use, inspect and maintain the temporary diversion berm daily.
Remove sediment when deposits reach half the height of the barrier.
Repair as needed or when directed to ensure proper function.
.. Approximate stream braid centerline (dewatered) i ..
.JL- \
L i'
.. i � \ i ..
Diversion berm
NPS PMIS No. 233055 NPS Drw No. 606/149761
Lifting straps
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
Install per manufacturers recommendation
+I
Hand placed
1 ..
3'-0" ±
LARGE MACHINE PLACED
SANDBAG DETAIL
sandbags (as required)
WATER SURFACE ELEVATION
AT TIME OF CONSTRUCTION
I El
Stream;;; 7 Hand placed and/or lake sandbags (as required)
Large machine placed sandbags
DIVERSION BERM DETAILS
SHEET
NUMBER
F.4
TEMPORARY DIVERSION BERM
DETAILS
PRELIM
it
Fiber rolls
----- Row� --·-··-··µuL( -------LW:::�:
e
Fiberrolls l
5' 5'
Top of ditchslope � J f,_ ::J \ 1
Centerline of road
Proposed culvert _/il---------:J 0 � _}E
\_ Install soil erosion control, check dam at outlet, (approximately 30')
SOIL EROSION CONTROL AT CULVERTS
NO SCALE
NPS PMIS No 233055 NPS Drwa No 606/149761
NOTE:
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208(1)
1. The CO may adjust the final location of all soil erosion control devices in the field.
SHEET
NUMBER
F.5
SOIL EROSION CONTROL DETAILS
PRELIM
:c
Steel or wood post
Silt fence reinforcement
1 Geotextile I
I
I
I
I
I
I
I
Backfilled and compacted soil
��.-J�HIH'Tl�� E
POST AND GEOTEXTILE INSTALLATION DETAIL
·Ji•• Note�
PLAN
End posts, see End Posts Detail
ELEVATION
END DETAIL
End posts, see End Posts Detail
Limits of clearing
Existing ground (undisturbed)
.l!l
(IJ
(IJ
c:n
11]
L..
-E
Varies
Flow (!JI !1 �I �I I
PLAN
Varies
ELEVATION
SILT FENCE INSTALLATION AT TOE OF FILL
Steel or wood posts driven tightly together.
Tie top of posts together
Geotextile fabric, Section A
PLAN
Staple or tie
Fold geotextile fabric around each post one full turn.
Fasten fabric to posts
POSTS AT .JOINTS
NPS PMIS No. 233055 NPS Drw No. 606/149761
NOTE:
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
1. Alternate preassembled silt fence options will be allowed as long as specified dimensions are satisfied. Follow manufacturer's recommendations for installation procedures.
All types must ensure silt fence remains attached to, and does not slide down, supporting posts.
2. Install silt fence to follow the ground contours as closely as possible.
3. Curve ends of silt fence upgrade to prevent water from running around the ends.
4. 10-foot (max.) spacing with silt fence reinforcement.
6-foot (max.) spacing without silt fence reinforcement.
Steel or wood post
Geotextile fabric
Staple or tie
PLAN
END POSTS DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
SILT FENCE
DETAIL APPROVED FOR USE 10/2016
SHEET
NUMBER
F.6
DETAIL NO SCALE REVISED:
W157-1
PRELIM
Trench 2" (min.)
Place excavated trench material on uphill side of fiber roll
CROSS SECTION
See Note 5
Fiber roll 9" 0 (min.)
Flow line
Trench 2" (min.)
FIBER ROLL
STAKING DETAIL
PLAN
V-ditch design shown.
Check dam installation details are similar for flat-bottom ditches
FIBER ROLL
CHECK DAM SPACING*
(See Note 7)
DITCH
CHECK DAM
GRADE
SPACING (max.)
(FT)
2% 150
3% 100
4% 80
5% 60
* Spacing calculated based on 9" 0 minimum fiber roll.
Do not use fiber roll check dams on ditch grades steeper than 5%.
Curve ends upstream to prevent flow around the ends. See Note 6
FIBER ROLL CHECK DAM
Filter rock
Filter rock
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
CROSS SECTION
.s
NPS PMIS No. 233055 NPS Drw No. 606/149761
NOTE:
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
1. Construct check dams from fiber rolls, filter rock, or gravel bags as approved by the CO, to meet the functional requirements of the check dam device.
2. Repair all rills or gullies and properly compact prior to installation.
3. Install check dams in ditches perpendicular to the flowline.
4. Stake fiber rolls in place with 1 ¾-inch x 1 ¾-inch wood stakes. Drive stakes at each end of the fiber roll and at 2-foot (max.) spacing.
5. Drive stakes into undisturbed soil of trench bottom.
Expose stakes 2-inches (min.) above top of fiber roll.
6. Provide sufficient length to prevent water from flowing around the ends of the fiber roll.
7. Adjust check dam spacing based on site-specific conditions.
FILTER ROCK
CHECK DAM SPACING
(See Note 7)
DITCH
CHECK DAM
GRADE
SPACING (max.)
(FT)
2% 150
3% 100
4% 80
5% 60
6% 50 GRAVEL BAG
CHECK DAM SPACING*
SHEET
NUMBER
F.7
FILTER ROCK CHECK DAM (See Note 7)
CROSS SECTION
GRAVEL BAG CHECK DAM
NO SCALE
DITCH
CHECK DAM
GRADE
SPACING (max.)
(FT)
2% 150
3% 100
4% 80
5% 60
6% 50
* Do not use gravel bag check dams on ditch grades steeper than 6%.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
CHECK DAM
MODERATE GRADES
DETAIL APPROVED FOR USE 7/2016 DETAIL
REVISED:
W157-15
PRELIM
:c
Rolled erosion control product
Filter rock
CROSS SECTION
V-DITCH
Check Dam spacing (SJ
Ponded water
Ditch Grade (G)
PROFILE VIEW
Filter rock
Rolled erosion control product
Rolled erosion control product
Filter rock
FILTER ROCK
CHECK DAM SPACING
(See Note 3)
DITCH MAX. CHECK DAM
GRADE SPACING (SJ
(G) (FT)
7% 40
8% and 9% 30 :.?.10% 20
FILTER ROCK CHECK DAM WITH
ROLLED EROSION CONTROL PRODUCT
CROSS SECTION
FLAT-BOTTOM DITCH
NPS PMIS No. 233055 NPS Drw No. 606/149761
NOTE:
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
1. Repair all rills or gullies and properly compact prior to installation.
2. Install check dams in ditches perpendicular to the flowline.
3. Adjust check dam spacing based on site-specific conditions.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
SHEET
NUMBER
F.8
CHECK DAM WITH ROLLED
EROSION CONTROL PRODUCT
DETAIL APPROVED FOR USE 7/2016
NO SCALE REVISED:
DETAIL
W157-16
PRELIM
Existing paved roadway
6" (min.)
Construct radius to allow turning movement of typical truck using exit
Separation-stabilization geotextile, class 2, type E
Filter rock
STABILIZED CONSTRUCTION EXIT
NPS PMIS No. 233055 NPS Drw No. 606/149761
NOTE:
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
1. Use this entrance for construction vehicles only.
2. Construct drainage ditches along entrance as directed.
Provide temporary drainage culvert where entrance crosses existing drainage ditches.
3. Minimize tracking onto paved roadway by removing built up sediment.
4. Adjust length to fit field conditions as approved.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
STABILIZED
CONSTRUCTION EXIT
SHEET
NUMBER
F.9
NO SCALE
DETAIL APPROVED FOR USE 7/2016 DETAIL
REVISED:
W157-19
PRELIM
Existing ground
Fiber roll
.·.:•,' :•.\ ••• D ;'
3' (min.)
ELEVATION
3' min. or as specified in plans
Runoff from disturbed areas
PLAN
Existing ground (typ.)
I �
--- Flow direction
INSTALLATION BEYOND TOE OF SLOPE
ALTERNATE FIBER ROLL .JOINT DETAIL
SLOPE PROTECTION INSTALLATION
Excavate trench 2" larger than fiber roll
Step 1: Excavate trench and install fiber rolls
Backfilled and compacted soil to match ground level
"' "' ff ;rection of run& rom disturbed areas
Step 2: Backfill soil against fiber rolls
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
FIBER ROLL SPACING STAKES REQUIRED
Slope Spacing
(FT)
Fiber roll length Stakes required (FT) for each roll
1 :4 or flatter 40 25 8 1:3 30 20 6
1:2 20 12 4 1:1 10
NPS PMIS No. 233055 NPS Drw No. 606/149761
NOTE:
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
1. Drive stakes at each end and at 4-foot spacing until fiber roll is secure to slope. Live stakes may be used for permanent installations. Do not crush fiber roll while staking.
2. Overlap fiber rolls 12-inch minimum. Drive stakes at 6-inches from fiber roll end angles towards the adjacent fiber roll and space stakes at 4-foot max .
l"\j
Slope
1" x 1" Wood stake
SHEET
NUMBER
F.10
FIBER ROLL STAKING DETAIL
Stagger joints (typ.) Place excavated material on uphill side of fiber roll 1" x 1" or 1" 0 wood stakes. See Note 2.
FIBER ROLL LAPPING DETAIL
Install fiber rolls along contours
INSTALLATION ALONG SLOPES
NO SCALE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
FIBER ROLL
DETAIL APPROVED FOR USE 10/2014
REVISED: 7/2016
DETAIL
W157-21 "L---------------------------------------------------------------------------------"--------------....1..------'
PRELIM
Erosion control blanket
Staples@ 12" spacing ----..,'
Staple
Compacted native soil
DETAIL A
ANCHOR TRENCH
AT TOP OF SLOPE
Anchor trench at top of slope, see Detail A
Erosion control blanket
Toe of slope
Slope stake
Blanket edge
12" (max.) c
Blanket end
Compacted native soil
DETAIL B
ANCHOR TRENCH
AT TOE OF SLOPE
Stap
DETAIL C
SHINGLE SPLICE
Shingle splice, see Detail c
Erosion control blanket
6 x 6" Trench
Anchor trench at toe of slope, see Detail B
PERSPECTIVE VIEW
NOTE:
NPS PMIS No. xxxxxx NPS Drw
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO
08 1
1. Install staples according to the manufacturer's recommendations.
2. Overlap in the direction of the prevailing wind.
6 x 6" Trench
U .S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
WFLHD DETAIL
No. xxxxxx
SHEET
NU MBER
F. 11
ROLLED EROSION CONTROL
PRODUCT ON SLOPES
N
O
S
C
A
L
E
�_J.::
D
E
T
AI
L
A
PP
R
O
V
ED
FO
R
U
S
E l
==i��
D f
ET
A
IL
iJ
REVISED :
W629-1
PRELIM
NPS PMIS No. 233055 NPS Drwg No. 606/149761
10.4 x 16 20301 -1200
25101 -0100
25101 -0400
60103 -0240
60201 -0800
60201 -1300
60210 -0800
60230 -0000
60404 -1000
60409 -0100
60501 -0000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
H
EA
D W
A
LL
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
C O
N C R
ET
E, H
EA
D
W A
LL
F O
R
4-
IN
C H
P
IP
E C U
LV
ER
T
-I
N C H
P
IP
E C U
LV
ER
T
-I
N C H
P
IP
E C U
LV
ER
T
EN
D
S
EC
TI
O
N F
O R
4-
IN
C H
P
IP
E C U
LV
ER
T
D
EB
R
IS
R A C K
C A
TC
H B
A S
IN
FL
H T
YP
E
IN
LE
T
TO
P, M
ET
A L
FR
A M
E A N
D
G R A
TE
FL
H T
YP
E
A
S
TA
N D
A R D
U N
D
ER
D R A
S
YS
TE
M
FR
EN
C H
D R A
IN
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH CUYD CUYD EACH LNFT LNFT EACH EACH EACH EACH LNFT Lt Rt 13+78.78 32 48 French Drain 14+16.14 24 49 French Drain 19+40.00 2 5 4 32 2 x/P 2 2 26+10.00 3 31 4 41 1 1 1 x/P 2 2 33+90.92 3 23 4 35 1 1 1 x/P 2 2 41+74.14 5 48 1 40 2 60 1 9 x/P, x/C 2 2
PROJECT TOTAL 163 1 12 40 2 108 60 4 1 2 2 97
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the thickness required 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the thickness 5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel required by the Std. 602-1 fill height table (steel). 6. Structural excavation quantity based on material excavated inside the vertical planes located P Plastic
3. Aluminum pipe culvert minimum wall thickness is the thickness 18 inches outside and parallel to the limits of footings or foundations. (blank) Any appropriate material required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
-A ug -2
:0
AM
c:
\p w
_w or kd ir
\j ac ob s-us -v a-pw
-0 2\ d0 lin co ln
0( 1)
_p ln
_G 1.
xl sx
]S he et
TABULATION OF DRAINAGE QUANTITIES
PROJECT
G.1WA FLAP LINCOL 57860(1)
WA NPS LARO 208(1)
SHEET
NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.
PRELIM
1,405
1 400
1 395
1 390
·················:·················'.··················�l.i)·-:--.··········· . . -��� . . ·t -� :'I:,� co co ·················:·················:·················/:;·:;·�···········
Hawk Creek Rd rt.
................. :i-.: Lop. .......... . ��ct: "ti � IO m+� ::t:: '""I C) ··················:·""e···········
1 385 ................. ; .... p�a_r:;�<;1. R./pr_ap, ................. : .................. ................. : .................. 1 Method A, c(ass 4 1 · - -
1 380
1 375
1 370
1 365
1 360
1 355
1 350
1 345
. . ll") ···,·�·.-·········;··················.···rsj
• • • • • • • • • Separa"tiori-Stab7liziitioh ·: • • • • • • •
Geotext;le, Class 1, Type: C
. I . . . . ' -. -. -. . . . . . . ----- ' ---. -. -·,-. . . . . . --- � -----. -. -. . . . . . . - -, ---- .. -. -. -. . . . . . . ' - 14' Tie into
Existing Ground . 5.75% . . : �···············r·················
················r·················:·········1�····
. . . . . . < ................ ·•· . . . . . . . . . . . . . ; . . . . . . . . . . . . : ............. \l ,;;;;;;;g c;,;,��:. ................ ·• • � ;epacati� n-�ta,;;u,;oon
: Geotextile, ·················:·················;··················�·················:-·················:··················:·················;··················: ·················�
Glass -1·,- Type· C :
M � � � . -----------·-··· , ... ---------------.-................. , .................. , .................. , ....... " " " " " " " " " " " " " " " " " " " " " " " " " " " " " • · · · · · " " " " " " " " " " " " "• " " " " " " " " " " " " " " " " " " •"
6' :60'
54"CMP
Pl�ed Riprap, Me�hod A, Class 4
24'
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
1,405
1 400
1 395
1 390
1 385
1 380
1 375
1 370
1 365
1 360
1 355
1 350
1 345 -0+60 -0+50 -0+40 -0+30 -0+20 -0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60
41+74 CULVERT PROFILE
SHEET
NUMBER
G.2
PRELIM
Normal ditch line
A i I
I ut slope I
I
1: 1. 5 aximum Slop I
I
--�c...-i-�'-"' -1V:3H max.-
FLOW -------
i1 I I I
'-= Subgrade shoulder I bJ -1 � �-
Lt.
PLAN
Normal cut slope Original ground
�/1,,W&\�\
Slope at pipe as staked
3'
SECTION A-A
<IJ c::
-Cl 0
(1) :c.8- al Cl.. CJ)
"- 1J 0 c::
1J <IJ
in 5
--slope-
Pipe culvert
Taper at 10: 1 in rolling or flat terrain. Taper at 5: 1 in mountainous terrain.
I I I
Pavement surface
NO SCALE
NPS PMIS No. 233055 NPS Drw No. 606/149761
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
INLET TREATMENT IN
CUT SLOPES DETAIL
SHEET
NUMBER
G.3
PRELIM
0.
Variable Width Extend flat bottom ditch to intercept existing backs/ope
Existing Ground f ' ' , '
3'
6-inch Diameter Perforated Underdrain Pipe
Trench Limits f A
Screened Outfall
Subgrade/
10'
See note 2 l A
B
PLAN
- ---.. '-- - Normal Ditch Line,
- ---.. '-- - Riprap Ditch, See Section D
Edge of Pavement r,;
•. 0 •. 0 •
• 0 . .·" r- _-
1. 6 . _
(j •. 0
IJ·.·�
I'. • c, o , ·o . ·cJ <�---'------ - :::::::
/:\VIII:\\'<
1.5'
3'
SECTION A-A
---------'' ;__ __ �-=s.d._ r,;
NOTE:
� 2.00%
6-inch Diameter -----
Perforated Underdrain Pipe
SECTION 8-B
Separation-Stabilization Geotextile Class 2, Type C
NPS PMIS No. 233055 NPS Drw No. 606/149761
PROJECT
WA FLAP LINCOL 57860(1)
WA NPS LARO 208 1
Granular Backfill Separation-Stabilization Geotextile Class 2,…