Virgin river campground septic system replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140L0624R0007
Agency
National Office Bureau of Land Management, Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238910 Site Preparation Contractors
PSC
Z2ND Repair Or Alteration Of Sewage And Waste Facilities

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Land Management, National Office is soliciting proposals to replace the failing septic systems at the Virgin River Campground located in Mohave County, Arizona. The solicitation seeks a contractor to remove the existing septic tanks and associated piping and install new septic tanks, distribution boxes, leach fields, and related components at three locations according to the provided specifications and drawings. A mandatory site visit is scheduled for December 12, 2023 and questions are due by December 14, 2023, with proposals due by January 22, 2024. Evaluation will be based on technical qualifications, past performance, and price.

The solicitation is set aside for total small business concerns under NAICS code 238910 with a size standard of $19 million. The estimated value is between $250,000 to $500,000 to be awarded on a firm fixed price basis. The selected contractor must complete all work within 120 calendar days of receiving the notice to proceed in April 2024. The place of performance is the Virgin River Campground located approximately 20 miles southwest of St. George, Utah near Interstate-15 exit 18 in Mohave County, Arizona.

Notice text

3 versions

Update #3 · Latest ·

VIRGIN RIVER CAMPGROUND SEPTIC SYSTEM REPLACEMENT

This amendment is executed to add the following attachments:
11 - Questions & Answers #2: 1 pg.
12 - Amended Continuation Pages: 36 pgs.

Please note that the Notice to Proceed is expected to be issued approximately mid-April to begin submittals and planning. However, work cannot begin onsite until peak season concludes on 04/30/2024.

The closing date and all other terms and conditions remain unchanged.

Update #2 ·

VIRGIN RIVER CAMPGROUND SEPTIC SYSTEM REPLACEMENT

This amendment is executed to add the following attachments:

7 - Design Report including Geotechnical Evaluation
8 - Questions & Answers #1
9 - Pre-Proposal Site Visit Roster

The closing date has also been extended to January 22, 2024, 2:00 PM Mountain Standard Time. All other terms and conditions remain unchanged.

Update #1 ·

VIRGIN RIVER CAMPGROUND SEPTIC SYSTEM REPLACEMENT

A site visit is planned for December 12, 2023 at 9:00 AM Mountain Standard Time.

BLM Virgin River Campground
Southwest of Interstate-15, 20 miles from St. George, UT
Cedar Pocket Road, Exit 18
Mohave County, AZ
GPS coordinates 36.951117, -113.79346

Attachments

Show all 15

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Virgin river campground septic system replacement Award Award Notice
Virgin river campground septic system replacement This notice · Latest solicitation Solicitation
Virgin river campground septic system replacement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity