Attachment_6_-_Lim_on_SubK_Breakout.xlsx
XLSX spreadsheet 94 KB Posted
- Attached to
- VIRGIN RIVER CAMPGROUND SEPTIC SYSTEM REPLACEMENT Federal contract opportunity
- Solicitation number
- 140L0624R0007
About this file
This file contains a template for tracking compliance with limitations on subcontracting requirements on a federal contract. The related solicitation is for septic system replacement services at the Virgin River Campground from the Bureau of Land Management. It seeks pricing for general construction and construction by special trade contractors to replace the campground's septic system. Offerors must demonstrate how their proposed use of small and large business subcontractors complies with the required percentage of work to be performed by the prime contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_11_-_Questions___Answers__2_0002.pdf | ||
| Sol_140L0624R0007_Amd_0002.pdf | ||
| Attachment_12_-_Amended_Continuation_Pages_01-09-2024_0002.pdf | ||
| Attachment_9_-_Site_Visit_Roster_12-12-2023_0001.pdf | ||
| Sol_140L0624R0007_Amd_0001.pdf | ||
| Attachment_7_-_Design_Rpt_including_GeoTech_Rept_2023_01_13_0001.pdf | ||
| Attachment_10_-_Amendment_1_Continuation_Pages_01-08-2024_0001.pdf | ||
| Attachment_8_-_Questions___Answers__1_0001.pdf | ||
| Attachment_1_-_Drawings_VRCG_Septic_System.pdf | ||
| Attachment_3_-_WD_AZ20230014_09012023.pdf | ||
| Attachment_5_-_SF1442_Completion_Instructions.pdf | ||
| Attachment_4_-_Pricing_Worksheet_final.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Specifications_VRCG_Septic_System_FINAL.pdf | ||
| Sol_140L0624R0007.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | |
| Type of Set-Aside | Small Business |
| Performance Period | |
| Required Self-Performance | 15% |
(A) Total Amount Proposed¹
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor² | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost³ $0.00
| (G) Limitation on Subcontracting Percentage⁴ | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 3: Total labor costs consist of all contractual costs other than material. |
| *Note 4: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .