Attachment_11_-_Questions___Answers__2_0002.pdf
PDF 124 KB Posted
- Attached to
- VIRGIN RIVER CAMPGROUND SEPTIC SYSTEM REPLACEMENT Federal contract opportunity
- Solicitation number
- 140L0624R0007
About this file
This document provides questions and answers related to a solicitation for septic system replacement services at the Virgin River Campground. The Bureau of Land Management is seeking a contractor to replace the existing septic system, which includes importing 330 cubic yards of rock. Excess soil from excavation must be spread around the disturbed area or stockpiled as designated. A notice to proceed is expected in mid-April 2024 to begin submittals and planning, but work cannot commence onsite until the peak season concludes on April 30th, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0624R0007_Amd_0002.pdf | ||
| Attachment_12_-_Amended_Continuation_Pages_01-09-2024_0002.pdf | ||
| Sol_140L0624R0007_Amd_0001.pdf | ||
| Attachment_9_-_Site_Visit_Roster_12-12-2023_0001.pdf | ||
| Attachment_7_-_Design_Rpt_including_GeoTech_Rept_2023_01_13_0001.pdf | ||
| Attachment_10_-_Amendment_1_Continuation_Pages_01-08-2024_0001.pdf | ||
| Attachment_8_-_Questions___Answers__1_0001.pdf | ||
| Attachment_3_-_WD_AZ20230014_09012023.pdf | ||
| Attachment_5_-_SF1442_Completion_Instructions.pdf | ||
| Attachment_4_-_Pricing_Worksheet_final.xlsx | XLSX spreadsheet | |
| Attachment_1_-_Drawings_VRCG_Septic_System.pdf | ||
| Attachment_6_-_Lim_on_SubK_Breakout.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Specifications_VRCG_Septic_System_FINAL.pdf | ||
| Sol_140L0624R0007.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
National Operations Center Building 50, Denver Federal Center
P.O. Box 2547 https://www.blm.gov
140L0624R0007 Virgin River Campground Septic System Replacement
Questions and Answers #2 (continued from #1)
22)Q: The SOW does not mention anything about excess dirt. It calls for importing 330 cubic yards of rock. This means there will be 330 yards of excess dirt. Is this to be spread around the excavation site or does it need to be hauled off site?
22)A: The excess soil is to be spread around the area disturbed by construction and remaining soil to be stockpiled at designated area just north of campground entrance.
30)Q: When do you expect the Notice to Proceed to be issued?
30)A: The Notice to Proceed is expected to be issued approximately mid-April to begin submittals and planning. However, work cannot begin onsite until peak season concludes on 04/30/2024.
https://www.blm.gov/