This is an amendment to a solicitation for septic system replacements at the Virgin River Campground. The Bureau of Land Management seeks to replace failing septic systems at the campground located southwest of Interstate-15 near St. George, Utah. Through this second amendment, the agency adds an attachment with questions and answers from potential offerors as well as revised continuation pages to the solicitation document. While the notice to proceed is scheduled for mid-April 2024, onsite work cannot begin until after April 30th due to the campground's peak season. The amendment maintains the original closing date and terms for the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_12_-_Amended_Continuation_Pages_01-09-2024_0002.pdf | ||
| Attachment_11_-_Questions___Answers__2_0002.pdf | ||
| Attachment_7_-_Design_Rpt_including_GeoTech_Rept_2023_01_13_0001.pdf | ||
| Attachment_10_-_Amendment_1_Continuation_Pages_01-08-2024_0001.pdf | ||
| Sol_140L0624R0007_Amd_0001.pdf | ||
| Attachment_8_-_Questions___Answers__1_0001.pdf | ||
| Attachment_9_-_Site_Visit_Roster_12-12-2023_0001.pdf | ||
| Attachment_2_-_Specifications_VRCG_Septic_System_FINAL.pdf | ||
| Sol_140L0624R0007.pdf | ||
| Attachment_3_-_WD_AZ20230014_09012023.pdf | ||
| Attachment_5_-_SF1442_Completion_Instructions.pdf | ||
| Attachment_4_-_Pricing_Worksheet_final.xlsx | XLSX spreadsheet | |
| Attachment_1_-_Drawings_VRCG_Septic_System.pdf | ||
| Attachment_6_-_Lim_on_SubK_Breakout.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L0624R0007 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
DENVER CO 80225
LNC
POB 25047
BUILDING 50
DENVER FEDERAL CENTER
BLM CONSTRUCTION and A&E - NOC
DENVER CO 80225
LNC
PO BOX 25047
BUILDING 50
DENVER FEDERAL CENTER
BLM CONSTRUCTION and A&E - NOC
01/05/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/29/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
VIRGIN RIVER CAMPGROUND SEPTIC SYSTEM REPLACEMENTS
Amendment 2 is performed to add the following documents:
Attachment 11 - Questions & Answers #2: 1 pg.
Attachment 12 - Revised Continuation Pages: 36 pgs.
Please note that the Notice to Proceed is expected to be issued approximately mid-April to begin submittals and planning. However, work cannot begin onsite until peak season concludes on 04/30/2024.
The closing date and all other terms and conditions remain unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Vicki Meier
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
File details come from the government source that posted it. Updated .