USDA Forest Service Bitterroot National Forest Trail Bridge Lumber
Closed Solicitation Posted
- Solicitation number
- 1284LM25Q0056
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 321113 Sawmills
- Place of performance
- Hamilton, Montana 59840, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service Bitterroot National Forest is seeking to procure wooden materials and hardware for the superstructures of two trail bridges: the Selway Suspension Trail Bridge and the Warm Springs Trail Bridge. This solicitation requires contractors to provide all necessary lumber and associated hardware components, including specific dimensional lumber types such as Coastal Region Douglas Fir, Larch, and Alaska Yellow Cedar, with precise treatment specifications according to American Wood Protection Association standards. Contractors must submit pricing for all items and include delivery with unloading at two designated locations in Montana, with materials required to be delivered by May 15, 2026. The government will evaluate offers based on conformance to technical specifications, past performance, and price, with technical factors and past performance weighted equally to price. The deadline for questions was September 12, 2025, and offers are due by September 26, 2025, at 1700 Mountain Time, to be submitted electronically to buffy.kittleson@usda.gov. The solicitation has been amended twice, with contractors required to acknowledge these amendments by signing and returning the attached SF30 form.
This procurement is designated as a Total Small Business set-aside under NAICS code 321113 (Sawmills) with a size standard of 550 employees. No specific award values or budget ranges are disclosed in the solicitation documents, though detailed quantities are provided in the Schedule of Items for various bridge components including stringers, posts, rails, floor planks, and chord members ranging from 2 to 200 units per item type. The contract will result in a single award, with delivery locations specified as the Forest Service Stockpile yard "Rombo Pit" near Hamilton, Montana for the Selway Bridge materials, and the Sula Ranger Station for the Warm Springs Bridge materials. The place of performance is listed as Hamilton, Montana, and contractors must be aware of seasonal delivery constraints, particularly from November 1 through April 1 at the Rombo Pit location. The procurement covers materials for two separate bridge projects, with the Warm Springs Trail Bridge being a 45-foot long by 8-foot wide timber trail bridge replacement located approximately 13.9 miles from Darby, Montana.
Notice text
4 versions
Update #4 · Latest ·
Bitterroot National Forest is looking to obtain the wooden material and hardware that makes up the superstructure of the Selway Suspension Trail Bridge and Warm Springs Trail Bridge.
See attachments for submittal instructions and drawings.
Please reach out with any questions by 9/12/25 COB to buffy.kittleson@usda.gov
Amendment 0001 (09/10/25) changes the following:
1 - Replaces 1284LM25Q0056.docx with 1284LM25Q0056 AMD 0001.docx - changes are highlighted in green
2 - Attachment 2 - Amended Drawings, page 1 has been replaced with new drawing
3 - Attachment 3 - Amended Schedule of Items, changes are highlighted in green
Amendment 0002 (09/18/25) changes the following:
1 - Replaces 1284LM25Q0056.docx with 1284LM25Q0056 AMD 0002.docx - changes are highlighted in BLUE
2 - Attachment 2 - Second Amended Drawings, page 1 has been added; page 6 has been removed
Please sign the attached SF30 and return with your offer to acknowledge the amendment.
Update #3 ·
Bitterroot National Forest is looking to obtain the wooden material and hardware that makes up the superstructure of the Selway Suspension Trail Bridge and Warm Springs Trail Bridge.
See attachments for submittal instructions and drawings.
Please reach out with any questions by 9/12/25 COB to buffy.kittleson@usda.gov
Amendment 0001 (09/10/25) changes the following:
1 - Replaces 1284LM25Q0056.docx with 1284LM25Q0056 AMD 0001.docx - changes are highlighted in green
2 - Attachment 2 - Amended Drawings, page 1 has been replaced with new drawing
3 - Attachment 3 - Amended Schedule of Items, changes are highlighted in green
Please sign the attached SF30 and return with your offer to acknowledge the amendment.
Update #2 ·
Bitterroot National Forest is looking to obtain the wooden material and hardware that makes up the superstructure of the Selway Suspension Trail Bridge and Warm Springs Trail Bridge.
See attachments for submittal instructions and drawings.
Please reach out with any questions by 9/12/25 COB to buffy.kittleson@usda.gov
Amendment 0001 (09/10/25) changes the following:
1 - Replaces 1284LM25Q0056.docx with 1284LM25Q0056 AMD 0001.docx - changes are highlighted in green
2 - Attachment 2 - Amended Drawings, page 1 has been replaced with new drawing
3 - Attachment 3 - Amended Schedule of Items, changes are highlighted in green
Amendment 0001 (09/17/25) changes the following:
1 - Attachment 2 - Amended Drawings AMD 0002, page 6 has been replaced with a new drawing
2 - 1284LM25Q0056 AMD 0002.docx - Changes are highlighted in blue
Please sign the attached SF30 and return with your offer to acknowledge the amendment.
Update #1 ·
Bitterroot National Forest is looking to obtain the wooden material and hardware that makes up the superstructure of the Selway Suspension Trail Bridge and Warm Springs Trail Bridge.
See attachments for submittal instructions and drawings.
Please reach out with any questions by 9/12/25 COB to buffy.kittleson@usda.gov
Files
| File | Type | Posted |
|---|---|---|
| SF30.pdf | ||
| Attachment 2 - Second Amended Drawings.pdf | ||
| 1284LM25Q0056 AMD 0002.docx | DOCX document | |
| SF30.pdf | ||
| Attachment 2 - Amended Drawings.pdf | ||
| 1284LM25Q0056 AMD0001.docx | DOCX document | |
| Attachment 2 - Amended Drawings AMD 0002.pdf | ||
| SF30.pdf | ||
| 1284LM25Q0056 AMD 0002.docx | DOCX document | |
| 1284LM25Q0056 AMD0001.docx | DOCX document | |
| SF30.pdf | ||
| Attachmnet 3 - Amended Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 2 - Amended Drawings.pdf | ||
| Attachment 3 - Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 1- Statement of Work.docx | DOCX document | |
| Attachment 2 - Drawings.pdf | ||
| 1284LM25Q0056.docx | DOCX document |
Show all 17
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| End of the World Long Term Stewardship | Forest Service | No set-aside | |
| Cisco Branch Ontonagon River Bridge Replacement | Forest Service | Total Small Business | |
| Barlow Ranger District Barlow Rd | Forest Service | Total Small Business | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| GAOA Star Meadows MEP Repairs Utility Installations Flathead NF | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity