Attachmnet 3 - Amended Schedule of Items.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
USDA Forest Service Bitterroot National Forest Trail Bridge Lumber
Solicitation number
1284LM25Q0056
Issued by

About this file

The file is an Independent Government Estimate (IGE) Schedule of Items for wooden materials needed for two trail bridges in the Bitterroot National Forest. The document details specific lumber requirements for the Selway Suspension Trail Bridge and Warm Springs Trail Bridge, including precise quantities of various wooden components such as stringers, posts, rails, floor planks, and chord members. Each bridge section lists exact specifications for wood types, dimensions, and quantities, with line items for wood pieces ranging from 2'-6" to 45' in length and including materials like AYC (Alaska Yellow Cedar), Douglas Fir, and Larch.

The solicitation is issued by the USDA Forest Service (Bitterroot National Forest) under solicitation number 1284LM25Q0056, seeking wooden materials for bridge superstructures. Potential vendors are instructed to contact Buffy Kittleson at buffy.kittleson@usda.gov by 9/12/25 COB with any questions. Amendment 0001 was issued on 09/10/25, which replaced certain documents and made highlighted changes to drawings and the schedule of items. The estimated total value of materials is currently listed as $0, with each line item priced at zero, suggesting this is a preliminary pricing document.

View the file

Other files

File Type Posted
SF30.pdf PDF
Attachment 2 - Second Amended Drawings.pdf PDF
1284LM25Q0056 AMD 0002.docx DOCX document
SF30.pdf PDF
1284LM25Q0056 AMD0001.docx DOCX document
Attachment 2 - Amended Drawings.pdf PDF
Attachment 2 - Amended Drawings AMD 0002.pdf PDF
SF30.pdf PDF
1284LM25Q0056 AMD 0002.docx DOCX document
1284LM25Q0056 AMD0001.docx DOCX document
Attachment 2 - Amended Drawings.pdf PDF
SF30.pdf PDF
1284LM25Q0056.docx DOCX document
Attachment 1- Statement of Work.docx DOCX document
Attachment 3 - Schedule of Items.xlsx XLSX spreadsheet
Attachment 2 - Drawings.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS: HOW TO USE THIS FORM

Independent Government Estimate (IGE)
No specific format is required for an IGE; however this must be an independent estimate and not a reiteration of a contractor quote. The selected format should generally be in the same level of detail and manner that the Schedule of Items pricing we request from contractors. The estimate should state any underlying assumptions or rationale used in formulating the estimate. Initially the CO will use the IGE to determine the estimated value of the procurement and to identify the appropriate procurement thresholds applicable to the solicitation. Later the IGE is compared to prices received to evaluate an offeror’s understanding of the government requirements and in supporting a price reasonableness determination.

EXPLANATION OF TABS

Stand Alone IGE:Use if the below do not apply to your requirement.
Stand Alone IGE w/options:Use if you have a requirement where you know you have an ongoing/recurring need year after year.
IDIQ:Use if you have a need that is reoccurring or multi-year requirement.
Task Order:Use if you want to issue a order against an existing contract or agreement.

CONTRACT (NO OPTIONS)

SCHEDULE OF ITEMS
Base Items
ITEM
NUMBERDESCRIPTIONEST QTYPAY UNITPriceTotal
Selway Suspension Trail Bridge
1Stringers, 4"x12"x15'6EA0
2Stringers, 4"x12"x16'10EA0
3Stringers, 4"x10"x14'48EA0
4Sills, 4"x12"x9'2EA0
5Posts, 8"x8"x4'2EA0
6Cap, 8"x8"x9'2EA0
7Rail posts, 4"x6"x5'20EA0
8Rail Brace, 2"x6"x4'-8"20EA0
9Rail, 3"x8"x16'16EA0
10Curb & Post Blocks, 5-1/8"x6"x16'3EA0
11Curb, 5-1/8"x6"x16'10EA0
12Curb, 5-1/8"x6"x16'18EA0
13Curb Blocks, 2"x6"x16'5EA0
14Floor Plank, 3"x12"x14'10EA0
15Floor Plank, 3"x12"x9'190EA0
16Running Plank (untreated) 3"x10"x16'38EA0
17Floor Beams, 6-3/4"x12"x16'13EA0
18Truss Braces, 3"x6"x7'-9"26EA0
19Chord Member, 2"x6"x16'80EA0
20Chord Member, 2"x6"x10'10EA0
21Chord Member, 2"x6"x2'-6"24EA0
22Truss Members, 1"x6"x6'-10-1/2"200EA0
23Truss Members, 1"x6"x6'4EA0
24FOB Destination1LS0
Warm Springs Trail Bridge
25Glulam Stringer AYC 45' x 5&1/8" x 31&1/2"5EA0
26Deck Planks AYC 8' x 3" x 8"66EA0
27Running Planks DF/LRCH 12' x 2" x 12"12EA0
28Railing Posts AYC 5'1" x 4" x 6"18EA0
29Railing Cap AYC 16' x 2" x 8"6EA0
30Railing AYC 16' x 2" x 6"18EA0
31Glulam Diaphragm AYC 1' 2&1/8" x 3&1/8" x 22&1/2"16EA0
32Pressure Treated Backing Plank DF/LRCH 20' x 3" x 12"6EA0
33Pressure Treated Backing Stiffener DF/LRCH 12' x 6" x 3"1EA0
34Pressure Treated Sill DF/LRCH 9' x 12" x 12"2EA0
35FOB Destination1LS0
TOTAL0
EA - EACH

LS - LUMP SUM