Upgrade Sanitary and Storm Systems at the National Museum of Natural History
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 33330226RF0010002
- Agency
-
Smithsonian Institution
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- District of Columbia 20560, United States
- Points of contact
-
- Virginia Chan chanvc@si.edu (202) 633-7253
- Christine Grant grantca@si.edu (202) 633-7290
Notice details come from SAM.gov. Updated .
About this opportunity
The Smithsonian Institution seeks fixed-price construction to upgrade sanitary and storm systems at the National Museum of Natural History in Washington, DC, with proposals due June 3, 2026, at 3:00 PM EST. The estimated project cost exceeds $10 million. No set-aside applies.
Place of performance is the museum complex at 10th Street and Constitution Avenue NW, Washington, DC. Work scope includes installation of new sanitary and stormwater piping throughout the Main Building, East Wing, and West Wing; rerouting piping to avoid exhibit halls, collection storage areas, and research spaces; capping or removing abandoned piping; lead and asbestos abatement in demolition areas; restroom renovations with accessibility improvements; and erosion and sediment control measures. Work must protect museum collections, exhibits, research operations, and historic architectural features, with construction occurring primarily outside museum operating hours (before 6:00 AM and after closing). The total period of performance is 740 calendar days from Notice to Proceed.
Funding is structured across three fiscal years: $8.5 million in FY 2026, $5.5 million in FY 2027 (obligated by November 30, 2026), and the remaining balance in FY 2028 (obligated by November 30, 2027). Three optional scope additions are included for pricing but exercised at government discretion. Contractors must provide 100% performance and payment bonds, comply with Davis-Bacon wage requirements (General Decision DC20260002), and maintain 10% contract retainage until final completion. Professional liability insurance of $10 million minimum is required.
A mandatory site visit is scheduled for April 27, 2026, at 9:00 AM. RFI questions are due May 4, 2026. Proposals must be submitted in PDF format to a Dropbox link, with separate technical, cost, and subcontracting plan documents. Technical evaluation weighs Plan of Accomplishment (including CPM schedule, coordination, and quality assurance), Key Personnel and Subcontractors, and Past Performance. Small business subcontracting goals are 40% of planned subcontracting dollars, with 7% reserved for service-disabled veteran-owned small business concerns. The NAICS code is 236220, Commercial and Institutional Building Construction; PSC is Y1JA, Construction of Museums and Exhibition Buildings.
Amendment 0005 (effective May 14, 2026) extended the proposal due date to June 3, 2026, and incorporated responses to RFIs for Questions 76-82 and Addendum No. 1 with updated specifications and drawings dated May 12, 2026.
Notice text
6 versions
Update #6 · Latest ·
Amendment 0005 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
Responses to RFIs for Questions 76-82
Addendum #1
Bid Due Date Extension
---------------------------------------------------------------------------------------------------------
Amendment 0004 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation:
Presentation Slides
---------------------------------------------------------------------------------------------------------
Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
Responses to RFI’s for Questions 1-75
Updated Multi-Year Document
---------------------------------------------------------------------------------------------------------
Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
2nd Site Visit
RFI Due Date Extension
Bid Due Date Extension
---------------------------------------------------------------------------------------------------------
Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation:
03/27 Site Visit Sign-in Sheet
---------------------------------------------------------------------------------------------------------
The Smithsonian Institution is seeking offers to upgrade Sanitary and Storm Systems project at the Smithsonian Institution's National Museum of Natural History located at 10th Street and Constitution Avenue NW, Washington, DC, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 1600103 both dated December 5, 2025.
All of the requirements which the successful Offeror must meet concerning this project are set forth in detail in the solicitation Documents included with this Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Fixed Price construction contract. The Smithsonian currently estimates that the fixed price for the entire project will exceed $10 Million.
The scope of this project includes the installation of a new sanitary and stormwater system throughout the Museum Main Building, East and West Wings to replace the existing infrastructure that has reached the end of its service life. Work must be executed with extreme care to protect the museum’s collections, exhibits, and research operations, and preserve its historic architecture features.
The major elements of work include, but are not limited to, the following:
- Installation of new sanitary and stormwater piping systems through the Main Building, East and West Wings in accordance with construction documents.
- Rerouting stormwater and sanitary piping where possible to avoid passage through the ceiling of exhibit halls, collection storage areas, and other sensitive or restricted spaces.
- Capping off abandoned piping, where feasible, isolating it from active systems and preventing future infiltration or structural compromise.
- Removal and disposal of old piping where capping is not feasible, in compliance with environmental regulations and structural safety standards.
- Lead and asbestos abatement, as necessary, in areas affected by demolition or pipe removal, in accordance with applicable EPA, OSHA, DOT, District of Columbia law and regulations and others as cited in the specification.
- Installation of new sanitary and storm piping within the existing tunnel system, including structural support, penetrations, and insulation where required.
- Tie-in of new systems to the existing SI stormwater and sanitary infrastructure external to the building, with proper alignment, connection materials, and testing.
- Develop and implement a comprehensive erosion and sediment control plan in compliance with EPA Construction General Permit and District of Columbia regulations.
- Inspect, remove and replace roof scuppers including sealing and integration with the building stormwater management system to restore proper drainage performance.
All work must be conducted in accordance with applicable codes, historic preservation requirements, safety regulations, and Smithsonian Institution design and construction standards. Phasing plans must minimize disruption to ongoing museum operations, protect the public, and preserve the integrity of historic and scientific assets.
PRE-BID TOUR OF THE SITE
The Pre-proposal meeting is scheduled for Friday, March 27, 2026, at 9:00 AM Eastern Time.
REQUEST FOR CLARIFICATIONS
It is requested that all questions be sent in no later than April 14, 2026.
THE PROPOSAL DUE DATE IS TUESDAY, MAY 12, 2026, at 3:00 PM EASTERN STANDARD TIME (EST).
The subcontracting goals for this project are: 40% with small business concerns. At least 7% with Service-Disabled Veteran-owned small businesses (SDV).
Davis Bacon Building Wage Determination DC20260002 shall apply.
The Period of Performance for the Base Contract and Options 1-3, if exercised, is 740 Calendar Days from the date of Notice to Proceed.
Update #5 ·
Amendment 0004 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation:
Presentation Slides
---------------------------------------------------------------------------------------------------------
Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
Responses to RFI’s for Questions 1-75
Updated Multi-Year Document
---------------------------------------------------------------------------------------------------------
Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
2nd Site Visit
RFI Due Date Extension
Bid Due Date Extension
---------------------------------------------------------------------------------------------------------
Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation:
03/27 Site Visit Sign-in Sheet
---------------------------------------------------------------------------------------------------------
The Smithsonian Institution is seeking offers to upgrade Sanitary and Storm Systems project at the Smithsonian Institution's National Museum of Natural History located at 10th Street and Constitution Avenue NW, Washington, DC, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 1600103 both dated December 5, 2025.
All of the requirements which the successful Offeror must meet concerning this project are set forth in detail in the solicitation Documents included with this Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Fixed Price construction contract. The Smithsonian currently estimates that the fixed price for the entire project will exceed $10 Million.
The scope of this project includes the installation of a new sanitary and stormwater system throughout the Museum Main Building, East and West Wings to replace the existing infrastructure that has reached the end of its service life. Work must be executed with extreme care to protect the museum’s collections, exhibits, and research operations, and preserve its historic architecture features.
The major elements of work include, but are not limited to, the following:
- Installation of new sanitary and stormwater piping systems through the Main Building, East and West Wings in accordance with construction documents.
- Rerouting stormwater and sanitary piping where possible to avoid passage through the ceiling of exhibit halls, collection storage areas, and other sensitive or restricted spaces.
- Capping off abandoned piping, where feasible, isolating it from active systems and preventing future infiltration or structural compromise.
- Removal and disposal of old piping where capping is not feasible, in compliance with environmental regulations and structural safety standards.
- Lead and asbestos abatement, as necessary, in areas affected by demolition or pipe removal, in accordance with applicable EPA, OSHA, DOT, District of Columbia law and regulations and others as cited in the specification.
- Installation of new sanitary and storm piping within the existing tunnel system, including structural support, penetrations, and insulation where required.
- Tie-in of new systems to the existing SI stormwater and sanitary infrastructure external to the building, with proper alignment, connection materials, and testing.
- Develop and implement a comprehensive erosion and sediment control plan in compliance with EPA Construction General Permit and District of Columbia regulations.
- Inspect, remove and replace roof scuppers including sealing and integration with the building stormwater management system to restore proper drainage performance.
All work must be conducted in accordance with applicable codes, historic preservation requirements, safety regulations, and Smithsonian Institution design and construction standards. Phasing plans must minimize disruption to ongoing museum operations, protect the public, and preserve the integrity of historic and scientific assets.
PRE-BID TOUR OF THE SITE
The Pre-proposal meeting is scheduled for Friday, March 27, 2026, at 9:00 AM Eastern Time.
REQUEST FOR CLARIFICATIONS
It is requested that all questions be sent in no later than April 14, 2026.
THE PROPOSAL DUE DATE IS TUESDAY, MAY 12, 2026, at 3:00 PM EASTERN STANDARD TIME (EST).
The subcontracting goals for this project are: 40% with small business concerns. At least 7% with Service-Disabled Veteran-owned small businesses (SDV).
Davis Bacon Building Wage Determination DC20260002 shall apply.
The Period of Performance for the Base Contract and Options 1-3, if exercised, is 740 Calendar Days from the date of Notice to Proceed.
Update #4 ·
Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
Responses to RFI’s for Questions 1-75
Updated Multi-Year Document
---------------------------------------------------------------------------------------------------------
Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
2nd Site Visit
RFI Due Date Extension
Bid Due Date Extension
---------------------------------------------------------------------------------------------------------
Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation:
03/27 Site Visit Sign-in Sheet
---------------------------------------------------------------------------------------------------------
The Smithsonian Institution is seeking offers to upgrade Sanitary and Storm Systems project at the Smithsonian Institution's National Museum of Natural History located at 10th Street and Constitution Avenue NW, Washington, DC, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 1600103 both dated December 5, 2025.
All of the requirements which the successful Offeror must meet concerning this project are set forth in detail in the solicitation Documents included with this Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Fixed Price construction contract. The Smithsonian currently estimates that the fixed price for the entire project will exceed $10 Million.
The scope of this project includes the installation of a new sanitary and stormwater system throughout the Museum Main Building, East and West Wings to replace the existing infrastructure that has reached the end of its service life. Work must be executed with extreme care to protect the museum’s collections, exhibits, and research operations, and preserve its historic architecture features.
The major elements of work include, but are not limited to, the following:
- Installation of new sanitary and stormwater piping systems through the Main Building, East and West Wings in accordance with construction documents.
- Rerouting stormwater and sanitary piping where possible to avoid passage through the ceiling of exhibit halls, collection storage areas, and other sensitive or restricted spaces.
- Capping off abandoned piping, where feasible, isolating it from active systems and preventing future infiltration or structural compromise.
- Removal and disposal of old piping where capping is not feasible, in compliance with environmental regulations and structural safety standards.
- Lead and asbestos abatement, as necessary, in areas affected by demolition or pipe removal, in accordance with applicable EPA, OSHA, DOT, District of Columbia law and regulations and others as cited in the specification.
- Installation of new sanitary and storm piping within the existing tunnel system, including structural support, penetrations, and insulation where required.
- Tie-in of new systems to the existing SI stormwater and sanitary infrastructure external to the building, with proper alignment, connection materials, and testing.
- Develop and implement a comprehensive erosion and sediment control plan in compliance with EPA Construction General Permit and District of Columbia regulations.
- Inspect, remove and replace roof scuppers including sealing and integration with the building stormwater management system to restore proper drainage performance.
All work must be conducted in accordance with applicable codes, historic preservation requirements, safety regulations, and Smithsonian Institution design and construction standards. Phasing plans must minimize disruption to ongoing museum operations, protect the public, and preserve the integrity of historic and scientific assets.
PRE-BID TOUR OF THE SITE
The Pre-proposal meeting is scheduled for Friday, March 27, 2026, at 9:00 AM Eastern Time.
REQUEST FOR CLARIFICATIONS
It is requested that all questions be sent in no later than April 14, 2026.
THE PROPOSAL DUE DATE IS TUESDAY, MAY 12, 2026, at 3:00 PM EASTERN STANDARD TIME (EST).
The subcontracting goals for this project are: 40% with small business concerns. At least 7% with Service-Disabled Veteran-owned small businesses (SDV).
Davis Bacon Building Wage Determination DC20260002 shall apply.
The Period of Performance for the Base Contract and Options 1-3, if exercised, is 740 Calendar Days from the date of Notice to Proceed.
Update #3 ·
Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
2nd Site Visit
RFI Due Date Extension
Bid Due Date Extension
---------------------------------------------------------------------------------------------------------
Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation:
03/27 Site Visit Sign-in Sheet
---------------------------------------------------------------------------------------------------------
The Smithsonian Institution is seeking offers to upgrade Sanitary and Storm Systems project at the Smithsonian Institution's National Museum of Natural History located at 10th Street and Constitution Avenue NW, Washington, DC, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 1600103 both dated December 5, 2025.
All of the requirements which the successful Offeror must meet concerning this project are set forth in detail in the solicitation Documents included with this Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Fixed Price construction contract. The Smithsonian currently estimates that the fixed price for the entire project will exceed $10 Million.
The scope of this project includes the installation of a new sanitary and stormwater system throughout the Museum Main Building, East and West Wings to replace the existing infrastructure that has reached the end of its service life. Work must be executed with extreme care to protect the museum’s collections, exhibits, and research operations, and preserve its historic architecture features.
The major elements of work include, but are not limited to, the following:
- Installation of new sanitary and stormwater piping systems through the Main Building, East and West Wings in accordance with construction documents.
- Rerouting stormwater and sanitary piping where possible to avoid passage through the ceiling of exhibit halls, collection storage areas, and other sensitive or restricted spaces.
- Capping off abandoned piping, where feasible, isolating it from active systems and preventing future infiltration or structural compromise.
- Removal and disposal of old piping where capping is not feasible, in compliance with environmental regulations and structural safety standards.
- Lead and asbestos abatement, as necessary, in areas affected by demolition or pipe removal, in accordance with applicable EPA, OSHA, DOT, District of Columbia law and regulations and others as cited in the specification.
- Installation of new sanitary and storm piping within the existing tunnel system, including structural support, penetrations, and insulation where required.
- Tie-in of new systems to the existing SI stormwater and sanitary infrastructure external to the building, with proper alignment, connection materials, and testing.
- Develop and implement a comprehensive erosion and sediment control plan in compliance with EPA Construction General Permit and District of Columbia regulations.
- Inspect, remove and replace roof scuppers including sealing and integration with the building stormwater management system to restore proper drainage performance.
All work must be conducted in accordance with applicable codes, historic preservation requirements, safety regulations, and Smithsonian Institution design and construction standards. Phasing plans must minimize disruption to ongoing museum operations, protect the public, and preserve the integrity of historic and scientific assets.
PRE-BID TOUR OF THE SITE
The Pre-proposal meeting is scheduled for Friday, March 27, 2026, at 9:00 AM Eastern Time.
REQUEST FOR CLARIFICATIONS
It is requested that all questions be sent in no later than April 14, 2026.
THE PROPOSAL DUE DATE IS TUESDAY, MAY 12, 2026, at 3:00 PM EASTERN STANDARD TIME (EST).
The subcontracting goals for this project are: 40% with small business concerns. At least 7% with Service-Disabled Veteran-owned small businesses (SDV).
Davis Bacon Building Wage Determination DC20260002 shall apply.
The Period of Performance for the Base Contract and Options 1-3, if exercised, is 740 Calendar Days from the date of Notice to Proceed.
Update #2 ·
Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation:
03/27 Site Visit Sign-in Sheet
---------------------------------------------------------------------------------------------------------
The Smithsonian Institution is seeking offers to upgrade Sanitary and Storm Systems project at the Smithsonian Institution's National Museum of Natural History located at 10th Street and Constitution Avenue NW, Washington, DC, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 1600103 both dated December 5, 2025.
All of the requirements which the successful Offeror must meet concerning this project are set forth in detail in the solicitation Documents included with this Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Fixed Price construction contract. The Smithsonian currently estimates that the fixed price for the entire project will exceed $10 Million.
The scope of this project includes the installation of a new sanitary and stormwater system throughout the Museum Main Building, East and West Wings to replace the existing infrastructure that has reached the end of its service life. Work must be executed with extreme care to protect the museum’s collections, exhibits, and research operations, and preserve its historic architecture features.
The major elements of work include, but are not limited to, the following:
- Installation of new sanitary and stormwater piping systems through the Main Building, East and West Wings in accordance with construction documents.
- Rerouting stormwater and sanitary piping where possible to avoid passage through the ceiling of exhibit halls, collection storage areas, and other sensitive or restricted spaces.
- Capping off abandoned piping, where feasible, isolating it from active systems and preventing future infiltration or structural compromise.
- Removal and disposal of old piping where capping is not feasible, in compliance with environmental regulations and structural safety standards.
- Lead and asbestos abatement, as necessary, in areas affected by demolition or pipe removal, in accordance with applicable EPA, OSHA, DOT, District of Columbia law and regulations and others as cited in the specification.
- Installation of new sanitary and storm piping within the existing tunnel system, including structural support, penetrations, and insulation where required.
- Tie-in of new systems to the existing SI stormwater and sanitary infrastructure external to the building, with proper alignment, connection materials, and testing.
- Develop and implement a comprehensive erosion and sediment control plan in compliance with EPA Construction General Permit and District of Columbia regulations.
- Inspect, remove and replace roof scuppers including sealing and integration with the building stormwater management system to restore proper drainage performance.
All work must be conducted in accordance with applicable codes, historic preservation requirements, safety regulations, and Smithsonian Institution design and construction standards. Phasing plans must minimize disruption to ongoing museum operations, protect the public, and preserve the integrity of historic and scientific assets.
PRE-BID TOUR OF THE SITE
The Pre-proposal meeting is scheduled for Friday, March 27, 2026, at 9:00 AM Eastern Time.
REQUEST FOR CLARIFICATIONS
It is requested that all questions be sent in no later than April 14, 2026.
THE PROPOSAL DUE DATE IS TUESDAY, MAY 12, 2026, at 3:00 PM EASTERN STANDARD TIME (EST).
The subcontracting goals for this project are: 40% with small business concerns. At least 7% with Service-Disabled Veteran-owned small businesses (SDV).
Davis Bacon Building Wage Determination DC20260002 shall apply.
The Period of Performance for the Base Contract and Options 1-3, if exercised, is 740 Calendar Days from the date of Notice to Proceed.
Update #1 ·
The Smithsonian Institution is seeking offers to upgrade Sanitary and Storm Systems project at the Smithsonian Institution's National Museum of Natural History located at 10th Street and Constitution Avenue NW, Washington, DC, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 1600103 both dated December 5, 2025.
All of the requirements which the successful Offeror must meet concerning this project are set forth in detail in the solicitation Documents included with this Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Fixed Price construction contract. The Smithsonian currently estimates that the fixed price for the entire project will exceed $10 Million.
The scope of this project includes the installation of a new sanitary and stormwater system throughout the Museum Main Building, East and West Wings to replace the existing infrastructure that has reached the end of its service life. Work must be executed with extreme care to protect the museum’s collections, exhibits, and research operations, and preserve its historic architecture features.
The major elements of work include, but are not limited to, the following:
- Installation of new sanitary and stormwater piping systems through the Main Building, East and West Wings in accordance with construction documents.
- Rerouting stormwater and sanitary piping where possible to avoid passage through the ceiling of exhibit halls, collection storage areas, and other sensitive or restricted spaces.
- Capping off abandoned piping, where feasible, isolating it from active systems and preventing future infiltration or structural compromise.
- Removal and disposal of old piping where capping is not feasible, in compliance with environmental regulations and structural safety standards.
- Lead and asbestos abatement, as necessary, in areas affected by demolition or pipe removal, in accordance with applicable EPA, OSHA, DOT, District of Columbia law and regulations and others as cited in the specification.
- Installation of new sanitary and storm piping within the existing tunnel system, including structural support, penetrations, and insulation where required.
- Tie-in of new systems to the existing SI stormwater and sanitary infrastructure external to the building, with proper alignment, connection materials, and testing.
- Develop and implement a comprehensive erosion and sediment control plan in compliance with EPA Construction General Permit and District of Columbia regulations.
- Inspect, remove and replace roof scuppers including sealing and integration with the building stormwater management system to restore proper drainage performance.
All work must be conducted in accordance with applicable codes, historic preservation requirements, safety regulations, and Smithsonian Institution design and construction standards. Phasing plans must minimize disruption to ongoing museum operations, protect the public, and preserve the integrity of historic and scientific assets.
PRE-BID TOUR OF THE SITE
The Pre-proposal meeting is scheduled for Friday, March 27, 2026, at 9:00 AM Eastern Time.
REQUEST FOR CLARIFICATIONS
It is requested that all questions be sent in no later than April 14, 2026.
THE PROPOSAL DUE DATE IS TUESDAY, MAY 12, 2026, at 3:00 PM EASTERN STANDARD TIME (EST).
The subcontracting goals for this project are: 40% with small business concerns. At least 7% with Service-Disabled Veteran-owned small businesses (SDV).
Davis Bacon Building Wage Determination DC20260002 shall apply.
The Period of Performance for the Base Contract and Options 1-3, if exercised, is 740 Calendar Days from the date of Notice to Proceed.
Files
Show all 20
Notice history
| Notice | Type | Posted |
|---|---|---|
| Upgrade Sanitary and Storm Systems at the National Museum of Natural History | Award Notice | |
| This notice | Solicitation | |
| Upgrade Sanitary and Storm Systems at the National Museum of Natural History | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 33330226RF0010010 Indefinite Delivery Indefinite Quantity (IDIQ) for Construction Services in Washington DC Metropolitan Area | Smithsonian Institution | Total Small Business | |
| Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park | Smithsonian Institution | No set-aside |